KEYS_Bid_2226_Addendum_2.pdf
PDF 119 KB Posted
- Solicitation number
- 22-26
- Issued by
- Florida
About this file
This is an Addendum 2 to KEYS Bid 22-26, issued by Keys Energy Services (KEYS), the municipal electric utility for the City of Key West, Florida, for a secondary easement pole relocation project. The addendum addresses eight questions and answers clarifying project logistics and specifications for contractors bidding on the replacement of approximately 151 distribution poles and relocation of approximately 145 customer service drops on the utility's 13.8 kV distribution system. Key clarifications include material storage and pickup procedures at the KEYS Stock Island Warehouse (available 7:30 a.m. to 3:30 p.m., Monday through Friday), delivery of removed concrete poles to the Stock Island Generating Facility, availability of the Cudjoe Key Substation as a laydown and staging area, and guidance that KEYS will not conduct a formal pre-bid site visit but bidders may independently review accessible project locations. The addendum also clarifies that pricing should be submitted for either the entire project or reject-only poles (73 poles and 49 service drop swings), confirms that unit pricing by zone and map is located in Column AC of a shared document, and specifies that KEYS aerial fiber is installed in the supply zone adjacent to the neutral conductor rather than in the communication zone.
The addendum modifies the Reference Documents section of the bid and requires all bidders to acknowledge receipt of this addendum in their proposal submission. No changes are made to other terms, conditions, specifications, requirements, and provisions of KEYS Bid 22-26, including the fixed price-per-pole basis for proposals, performance bond requirements of 100% of contract amount, comprehensive general liability insurance limits of $2 million per project, liquidated damages of $500 per day if work is not substantially complete by December 31, 2028, and the base contract term extending through March 31, 2029. Payment terms include 30 days from invoice acceptance with 5% retainage held until 30 days after project completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KEYS BID 22-26 SPECIFICATIONS FOR SECONDARY EASEMENT POLE RELOCATIONS
Addendum 2
This Addendum forms a part of the Contract Documents and modifies the Reference Documents section of KEYS Bid 22-26. All Bidders shall acknowledge receipt of this Addendum in their proposal submission.
QUESTIONS & ANSWERS:
1. Where will owner furnished material be stored? Will Keys Energy provide storage area?
Material can be picked up daily from our KEYS Stock Island Warehouse. KEYS can also provide a limited storage area at the Stock Island pole yard. A larger storage area is available in Cudjoe Key located approximately 20 miles outside of Key West, near US- 1.
2. Where will the removed concrete pole be returned?
Removed concrete poles shall be delivered to KEYS disposal area located at the Stock Island Generating Facility adjacent to the pole yard.
3. Is Keys Energy providing a show up/ laydown yard?
Yes. KEYS can make the Cudjoe Key Substation available for contractor parking and use as a laydown/staging area. Limited space at the Stock Island Generating Facility may be available for staging purposes, subject to coordination with KEYS.
4. What are the available hours for material pick-up/ deliveries?
KEYS Stock Island Warehouse is available for material pickup and deliveries from 7:30am to 3:30pm, Monday through Friday, excluding KEYS-observed holidays.
5. The pricing sheet requests a total cost for Rejects Only Maps, 73 poles, 49 service drop swings, but no scope of work is provided for reject poles. Can you please clarify?
If this is for new/existing work on the reject maps only, can you please clarify which poles? As the sum appears to be greater than 73.
There are maps with just the reject poles the scope of work is the same as what is on the spreadsheet for all the poles. Just having two costs for the entire project or just reject poles.
6. The Proposal Page within the RFP states "Proposers shall complete and submit the Excel Unit Price Sheet provided in the Reference Documents and enter the corresponding estimated totals below." We did not receive an Excel Unit Price Sheet with the documents that we can find. Can KEYS please provide that document?
Column AC in the document 3 folder on the share point has the unit price for each zone and map.
KEYS BID 22-26 SPECIFICATIONS FOR SECONDARY EASEMENT POLE RELOCATIONS
7. Is a site visit available to review the easement locations?
KEYS will not conduct a formal pre-bid site visit. Bidders may independently review accessible project locations prior to the bid due date.
8. Where does Keys Energy aerial fiber sit on the poles? Supply space or comms space?
KEYS aerial fiber is installed adjacent to the neutral conductor within the supply zone and is NOT located withing the communication zone.
NO OTHER CHANGES:
All other terms, conditions, specifications, requirements, and provisions of KEYS Bid 22-26 shall remain unchanged and in fill force and effect.