This is a Statement of Work (SOW) for the supply, delivery, and installation of a new 28'x60' modular office trailer at Kentucky Lock Resident Office compound, effective December 5, 2025. The contractor must perform comprehensive site preparation and installation services, including: foundation preparation with in-ground structural footers; supply and delivery of the modular trailer with exterior paint matching the existing two-tone Resident Office scheme; installation of all interior components including furniture, appliances, HVAC systems, plumbing, flooring, lighting, cabinetry, fixtures, and signage; connection of all utilities (plumbing, sewer, and electric) to existing site utilities; construction of wood decking, ramps, stairs, and railings for facility access; installation of gravel access driveway in the roundabout area; and installation and routing of a buried fiber optic network line from the existing Resident Office trailer to the new trailer.
The SOW explicitly excludes installation, configuration, and connection of USACE IT network equipment, with the exception of the fiber network line installation specified in the work scope. The contractor is required to reference attached sketches and photos for floorplan details, utility locations, and paint scheme specifications to ensure compliance with site requirements and existing facility standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Kentucky Lock – New Conferencing Trailer Statement of Work
5-DEC-2025
Supply, delivery, and installation of a new 28'x60' modular oƯice trailer at Kentucky Lock Resident OƯice compound. Reference attached sketches for additional details.
Scope of work includes the following:
1) Preparation of trailer foundation area, including installation of inground structural footers to support and distribute the weight of the trailer.
2) Supply, delivery, and installation of new 28’x60’ modular oƯice trailer, in accordance with the floorplan/layout sketch. Includes exterior paint scheme to match existing Resident OƯice two-tone paint (reference attached photo).
3) Supply and installation of all furniture, appliances, HVAC, plumbing, appurtenances, flooring, lighting, cabinetry, fixtures, finishes, signage, and systems.
4) Installation and connection of all utilities, to include plumbing, sewer, and electric.
Utilities will tie-in to existing site utilities. Refence attached sketches for locations of existing site utilities.
5) Supply and construction of new wood decking, ramp, stairs, and railings for access/egress into the trailer.
6) Installation of new gravel access driveway in grassy roundabout area.
7) Installation and routing of buried main fiber network line from existing Resident
OƯice trailer to new oƯice trailer.