For KC-130J Weapon Systems Trainer (WST)-1 Re-skin

1. BACKGROUND: A requirement exists as part of the KC-130J Weapon Systems Trainer-1 (WST) Block 8.1 Modification to perform a Mylar re-skin for the Visual Display System. KCWST-1 is located at the Fleet Replacement detachment-East onboard Marine Corps Air Station Cherry Pt, North Carolina.

2. PURPOSE: The purpose of this SOW is to establish the contractor tasks for the mirror re-skin for the KC-130J WST (Device 2F199-1) required to meet the geometric and alignment requirements of the Visual Production Specification (Attachment 11).

3. TASK AREAS AND SPECIFIC TASKS: Tasks to be performed include:

The contractor shall dispose of the current Mylar mirror and re-attach a new Mylar mirror to the mirror bowl. Sub-task requirements are:

(1) Inspect the high bay for sufficient work space to complete the requirements of this SOW.

(2) Coordinate with on-site personnel for existence and suitability of support equipment and tools (e.g. skinning ears, scissor lift, etc.) Any shortfall in necessary support equipment and/or tools on-site shall be obtained by the contractor.

(3) The contractor will have access to the 2F199 #1, 24/7 during the period of 27 Feb 2021 through 7 Mar 2021. All on-site work/testing/acceptance SHALL be completed between these dates.

(4) Remove old Mylar mirror from Visual Display System.

(5) Re-attach new Mylar mirror to Visual Display System.

(6) Perform testing of geometry and collimation, with government personnel invited, to verify specified performance of the modified visual display system.

(7) Remove scrap material and trash from high bay.

4. RELATED DOCUMENTS

-2F199_Floor_Layout.docx.

-Visual Production Specification (Attachment 11)

5. WARRANTY

2 years parts and labor.

6. COST/PRICE: TBD

7. PERIOD OF PERFORMANCE: Contract Award through 30 March 2021

8. FIELD TECHNICAL POC: Angela Conner, angela.conner@navy.mil 301-751-5035

9. FIELD FINANCIAL POC: Danielle Miller, danielle.miller2@navy.mil 301-757-8756

10. FIELD CONTRACTS POC: Kim Phung, kim.phung@navy.mil 407-380-4762

11. DATE: