KC-46 LG Industry Day Charts.pptx

PPTX presentation 3 MB Posted

Attached to
KC-46 Landing Gear PBL
Solicitation number
SPRHA1-25-R-KC46LG
Issued by

About this file

This is a PowerPoint presentation deck for an Industry Day briefing on the KC-46 Landing Gear support strategy, presented by EHCC, DLA Aviation, and 417th SCMS. The presentation outlines plans for a 10-year Landing Gear support contract requiring full overhaul/remanufacture of nose landing gear (NLG) and main landing gear (MLG) components for the KC-46 aircraft fleet, with a 10-year time change interval.

The proposed contract will be a single-award Requirements Type Contract (RTC) with a 5-year base period and one 5-year option. The scope includes approximately 50 Depot Level Reparable NSNs, requiring 75-day average turn time for shipsets, FAA compliance, engineering support, and technical data/CMM access. Pricing will be Firm Fixed Price with Economic Price Adjustment. The contractor will serve as the sole remanufacturing source, responsible for delivering 'A' condition assets but not for forecasting, stock, storage, or issue. One-on-one industry sessions are scheduled for February 11-12, 2025, from 0900-1400 each day, with DLA Aviation serving as the contracting agency. The government anticipates a 6-month RFP process with trade-off source selection procedures.

View the file

Other files

File Type Posted
KC-46 LG Industry Day - Q A.pdf PDF
KC-46 LG NSN List.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KC-46 Landing Gear Strategy General Briefing for Industry Presented by: EHCC, DLA Aviation, 417th SCMS January 06, 2025

Points of Contact

Contracting Officer: Kyle Swaner

(385)519-8684
kyle.swaner@us.af.mil

Program Manager: Austin Gardner

(801) 781-0877
austin.gardner@us.af.mil

Warfighter Always

PEOPLE PRECISION POSTURE PARTNERSHIPS

CUI

Overview

Disclaimers and Ground Rules Program Goals Program Scope / Anticipated Requirements Notional KC-46 LG Strategy Preliminary Sourcing Strategy

PEOPLE PRECISION POSTURE PARTNERSHIPS

Disclaimers and Ground Rules

Seeking Industry input on strategy formation One-on-one meetings will be established to discuss contractors’ feedback Questions will be answered to the best of the team’s knowledge of plans, desires, and general situation as it exists at this time Please provide all questions for the one-on-one sessions to the POCs listed on slide 2 at least one week prior to your scheduled session

PEOPLE PRECISION POSTURE PARTNERSHIPS

Disclaimers and Ground Rules (Cont.)

No agreements, promises, commitments or compensation are made or implied by the Government or Contractors Copies of slides and all Q&As will be made available via Sam.gov posting following the one-on-one sessions All posted Q&As will be non-attributable No proprietary information will be divulged No information provided will be contractually binding and will be for planning purposes only

PEOPLE PRECISION POSTURE PARTNERSHIPS

Background

The KC-46 Tanker is a commercial derivative of the Boeing 767-2C aircraft, finished to meet unique KC-46 Tanker requirements. The KC-46A fleet will be in need of full overhauls of the installed landing gear (1x nose and 2x main) and Sub-component/Field level support ICS with Boeing for KC-46 Landing Gear transitioning to AFLCMC KC-46 Program Office and 424th / 417th SCMS for management and support 429th Enterprise Hill Commodity Council (EHCC) has taken the lead to scope and strategize an LTC for KC-46 LG support

PEOPLE PRECISION POSTURE PARTNERSHIPS

Program Goals

100% overhaul/remanufacture support for MLG and NLG 10yr time change interval (TCI) under an outcome-based/Long Term Contract (LTC) Landing Gear Overhaul accomplished IAW with OEM CMMs and latest OEM technical data 100% Sub-Component/Field level support Landing Gear Engineering expertise/support Implementation of industry/commercial variant best practices Management of cycle-times to maximize landing gear component life and minimize overhaul costs

PEOPLE PRECISION POSTURE PARTNERSHIPS

Program Scope / Anticipated Requirements KC-46 LG Items Approx. 50 Depot Level Reparables (DLRs) NSNs Including shipsets (1x NLG and 2x MLG) Top Level Requirements Remanufacture Support (10yr TCI and field level sub-component requirements) Performance required to meet Remanufacture Turn Around Time (RTAT)/Exchange Lead Time (ELT) metrics Shipsets require a less than 75-day average turn time Sub-component support tied to negotiated PLTs Incentives/disincentives tied to outlined performance metrics Engineering Support FAA Compliance Technical Data/CMM Access

PEOPLE PRECISION POSTURE PARTNERSHIPS

Notional KC-46 LG Strategy Contractor to serve as the sole remanufacturing source for all 417th KC-46 competitive landing gear requirements (50 DLRs to date) Responsible for delivering ‘A’ condition assets in accordance with established metrics Not responsible for forecasting, stock, store, & issue to customers Remanufacture Turn Around Time (RTAT) and Exchange Lead Time (ELT) optimization are key goals Outcome based metrics applied to RTAT and ELT Imperative that accurate PLTs are proposed and adhered to Collaborative Forecasting (transparency) How involved do you feel you need to be in forecasting process to be successful? Government anticipates providing yearly TCI schedule and 3yr BEQ forecast for sub-components Notional 10-year contract period 5-year basic contract; single 5-year option

PEOPLE PRECISION POSTURE PARTNERSHIPS

Notional KC-46 LG Strategy (cont.)

Single RFP issued for:

Full and open competition Single award Trade-off source selection procedures Technical proposal must demonstrate:

KC46-2C LG or commercial equivalent overhaul/remanufacture capability FAA compliance Ability to meet RTAT for overhaul shipsets PLT realistic timeframes on sub-components Technical Data/CMM access Engineering expertise Ability to source all necessary subcomponents for remanufacture Sufficient capacity to meet throughput requirements Each offeror will be required to price all NIINs Anticipated 6-month RFP

PEOPLE PRECISION POSTURE PARTNERSHIPS

Preliminary Sourcing Strategy

Contract Type: Single Award Requirements Type Contract (RTC) Indefinite Delivery/Indefinite Quantity (IDIQ) Contractor 100% responsible for all outcomes Disincentives will be applied to late deliveries Period of Performance: 5-year basic w/ 5-year option Pricing: Firm Fixed Price W/EPA Exploring single unit price, open to other options Cost Analysis: Business Case Analysis (BCA) Key Deliverables: Remanufacture Support, Performance Metrics, Engineering Support, FAA Compliance, Technical Data Access

PEOPLE PRECISION POSTURE PARTNERSHIPS

PEOPLE PRECISION POSTURE PARTNERSHIPS

image3.png image1.jpeg image2.png image4.png image5.png

File details come from the government source that posted it. Updated .