Katy Addicks_Asbestos Material Inspection Report Final.pdf
PDF 1 KB Posted
- Solicitation number
- CB-2026-0052
- Issued by
- Texas
About this file
This is an Asbestos Material Inspection Report prepared for the City of Houston in connection with the Rehabilitation of Water Storage Tanks - Package 16 project. The report documents asbestos survey findings at the Katy Addicks water storage tank facility, one of four site locations included in the City's solicitation for construction services. The inspection was conducted to identify the presence, location, and condition of asbestos-containing materials (ACM) prior to rehabilitation work, which is necessary to ensure compliance with TCEQ requirements and proper handling protocols during the tank restoration process.
The report serves as a supporting exhibit for bidders preparing proposals for structural repairs, protective coating upgrades, equipment replacements, safety improvements, and site restoration work at the facility. The asbestos assessment findings are critical for contractors to understand the scope of hazardous material management and abatement that may be required as part of the overall rehabilitation project, influencing project costs, scheduling, and safety procedures. This documentation supports the procurement process by providing qualified bidders with essential environmental and material condition data necessary for accurate bid preparation and project execution planning.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
You need to enable JavaScript to access www.beaconbid.com
File details come from the government source that posted it. Updated .