K73_122277.pdf

PDF 14 MB Posted

Attached to
K73_2024 SCOUR REPAIRS
Solicitation number
58959
Issued by
Culpeper County, Virginia

About this file

The document K73_122277.pdf appears to be related to a state and local contract opportunity for SCOUR REPAIRS in various locations in Virginia's Culpeper County. The contract, identified as K73_2024, requires prequalification and all questions must be submitted to the Virginia Department of Transportation (VDOT) using the Contractors Advertisement Bulletin Board (CABB). The project scope and locations are not further detailed in the provided information.

The document does not contain pricing terms, set asides, incumbent information, funding details, or other salient commercial details about the contract opportunity. The only additional information provided is that the contract is for the state of Virginia, specifically Culpeper County (FIPS code 51047).

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ORDER NO.: K73

CONTRACT ID. NO.: C0000122277N01B

Form C-6a

Rev. 3-22-05

CNSP (F) 1-9-06

COMMONWEALTH OF VIRGINIA

DEPARTMENT OF TRANSPORTATION

BID PROPOSAL AND CONTRACT

ROUTE NUMBER: VARIOUS

FHWA NUMBER: STP-BR07(336)

PROJECT NUMBER: BRDG-967-567, N501

COUNTY: VARIOUS

DISTRICT: CULPEPER

DESCRIPTION: SCOUR REPAIRS

LOCATION: VARIOUS

DATE BID SUBMITTED: 10:00 AM WEDNESDAY MARCH 27, 2024

Form C-118 Rev. 7-6-05

COMMONWEALTH OF VIRGINIA

NOTICE TO BIDDERS

As a matter of information, the bidder’s attention is directed to the points noted herein. Every point enumerated below is fully covered by proposal documents that describe them in detail. Bidders should check their proposal against all requirements, as strict compliance with all provisions is mandatory.

1. Bids shall be filed electronically through Bidx (www.bidx.com\main\index.html) at the times designated in the Notice of Advertisement for Bids. For information see (http://cabb.virginiadot.org/cabb/)

2. Unless otherwise specified or permitted in the proposal, prices shall be submitted on all items shown in the proposal.

3. Proposals conditioned by proposed alternates, other than those specified or permitted, or by reserving the right to accept or reject an award or to enter into a contract pursuant to an award will not be considered.

4. A bid total shall be shown in each space provided.

5. Bid bonds shall conform to Section 102.07. The bid bond number shall be placed in the appropriate space in your electronic bid. As an alternative you may complete the bottom line of the Form C-24. This form may be mailed or faxed but must be received prior to the opening of the bids.

6. Joint venture proposals shall show the Firm Name of each party and shall be signed by an authorized representative of each Firm. A letter shall be filed with the prequalification office describing responsibility of each firm and the amount of maximum capacity pledge by each firm of a joint venture.

http://www.bidx.com/main/index.html http://cabb.virginiadot.org/cabb/

Form C-24

Rev. 7-6-05

PROPOSAL GUARANTY

KNOW ALL MEN BY THESE PRESENTS, THAT WE As principal, and Surety, are held and firmly bound unto the

Commonwealth of Virginia as obligee, in the amount of FIVE PERCENT OF THE DOLLAR VALUE OF THE BID, lawful money of the United States of America, for the payment of which, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally and firmly by these presents.

SIGNED, sealed and dated this Day of , 20

WHEREAS, the above said principal is herewith submitting its proposal for:

PROJECT NUMBER: BRDG-967-567, N501

NOW, THEREFORE, the condition of the above obligee is such, that if the aforesaid principal shall be awarded the contract upon said proposal and shall within the time specified in the Specifications after the notice of such award enter into a contract and give bond for the faithful performance of the contract, then this obligation shall be null and void; otherwise to remain in full force and effect and the principal and surety will pay unto the obligee the difference in money between the amount of the bid of the said principal and the amount for which the obligee may legally contract with another party to perform the said work if the latter amount be in excess of the former; but in no event shall the liability exceed the penal sum hereof.

(Principal*) (Surety Company)

By: By:

(Officer, Partner or Owner) (Seal) (Attorney-in-Fact**) (Seal)

(Principal*) (Address)

(Officer, Partner or Owner) (Seal) (Surety Company)

(Principal*) (Attorney-in-Fact**) (Seal)

(Officer, Partner or Owner) (Seal) (Address)

*Note: If the principal is a joint venture, each party thereof must be named and execution made by same hereon. If there is more than one surety to the bid bond, each surety must be named and execution shall be made by same hereon.

Electronic Bid Only: In lieu of completing the above section of the Contract Performance Bond, the Principal shall file an Electronic Bid Bond when bidding electronically. By signing below the Principal is ensuring the identified electronic bid bond has been executed and the Principal and Surety are firmly bound unto the Commonwealth of Virginia under the same conditions of the bid bond as shown above.

Electronic Bid Bond ID# Company/Bidder Name Signature and Title

**Attach copy of Power of Attorney

Form C-48

Rev. 2-23-11

COMMONWEALTH OF VIRGINIA

SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION FORM (ALL BIDDERS)

PROJECT NO.: BRDG-967-567, N501 CONTRACT ID. NO.: C0000122277N01B

FHWA NO: STP-BR07(336) DATE SUBMITTED____________________

All bidders, including DBEs bidding as Prime Contractors, shall complete and submit the following information as requested in this form within ten (10) business days after the opening of bids.

The bidder certifies this form accurately represents its solicitation and utilization or non-utilization, as indicated, of the firms listed below for performance of work on this contract. The bidder also certifies he/she has had direct contact with the named firms regarding participation on this project.

BIDDER_________________________________SIGNATURE________________________________

TITLE_____________________________________________________________________________

SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION (ALL)

VENDOR

NUMBER

NAME OF SUBCONTRACTOR/SUPPLIER

TELEPHONE NUMBER

DBE OR

NON-DBE

UTILIZED

(Y/N)

NOTE: ATTACH ADDITIONAL PAGES, IF NECESSARY.

BIDDER MUST SIGN EACH ADDITIONAL SHEET TO CERTIFY ITS CONTENT AND COMPLETION OF FORM.

Form C-7

Rev. 1-19-12 Sheet 1 of 1

TERMS OF THE PROPOSAL\CONTRACT

DEPARTMENT OF TRANSPORTATION

SUBMITTED: 10:00 AM WEDNESDAY MARCH 27, 2024

PROJECT NUMBER: BRDG-967-567, N501

ROUTE NUMBER: VARIOUS

FHWA NUMBER: STP-BR07(336)

DESCRIPTION: SCOUR REPAIRS

LOCATION: VARIOUS

DISTRICT: CULPEPER COUNTY: VARIOUS

I/we declare that no other person, firm or corporation is interested in this proposal; that I/we have carefully examined the plans, job specifications, current Road and Bridge specifications, and all other documents pertaining thereto and thoroughly understand the contents thereof; that I/we meet the prequalification requirements for bidding on this proposal;

that I/we understand that the plans and current Road and Bridge specifications, are a part of this proposal; that all of the quantities shown herewith are a part of this proposal; that all the quantities shown herewith are approximate only; that I/we have examined the location of the proposed work and source of supply of materials; and that I/we agree to bind myself/ourselves upon award by the Commonwealth under this proposal to a contract with necessary surety bond to start work according to project specifications, and to complete all work in accordance with the plans, job specifications and current Road and Bridge Specifications within the time limit set forth in the contract.

COMPLETION DATE: JUNE 6, 2025

BID TOTAL $

Attached is a bond conforming to the requirements of the current Road and Bridge Specifications, it being understood that such bond is to be forfeited as liquidated damages if, upon acceptance of the terms of this proposal, I/we fail to execute the contract and furnish bond as provided in the current Road and Bridge Specifications.

(Names of Individual(S),Firm(S) Or Corporation)

Street Address City State Zip Code Vendor#/Fin#

Print Name Signature Title

In consideration of the commitments made as shown herein, the Commonwealth of Virginia by The Commonwealth Transportation Commissioner agrees to pay for all items of work performed and materials furnished at the unit price(s) and under the conditions set forth in this proposal, in witnessed by the affixing of the name below.

Contract Execution Date By

CHIEF ENGINEER

VIRGINIA DEPARTMENT OF TRANSPORTATION

Virginia Department of Transportation 02/08/2024Date Printed:

Schedule of Items Page: 2

Proposal ID: C0000122277N01B BRDG-967-567, N501

Order No.: K73

Oversight/State Project No.:

Federal Project No.: STP-BR07(336)

Contractor:

0001 REGULAR BID ITEMSSECTION:

Cat Alt Set ID: Cat Alt Mbr ID:

Bid AmountUnit Price Approximate Quantity and

UnitsDescription

Item ID Proposal

Line Number Dollars Cents Dollars Cents

Spec No.

0010 305SD20-0011

AGGR. MATL. NO. 25 OR 26 TON

250.000

0020 308SD20-0001

AGGR. MATL. NO. 1 TON

195.000

0030 401SD20-0007

COFFERDAM EA

11.000

0040 401SD20-0009

STRUCTURE EXCAVATION

MAINT.

CY

190.000

0050 404SX20-0001

CONCRETE CLASS A3

SUBSTRUCT. MAINT.

CY

80.000

ATTD, 404

0060 406SD20-0014

REINFORCING STEEL SPR.

STRUCT. MAINT.

LB

1,660.000

0070 412SX20-0018

BR. SUBSTR. WID./REPAIR

RECONSTRUCT EXIST.

MORTAR RETAINING WALLS

STR. 6002/60017

SF

140.000

ATTD

0080 412SX20-0024

BR. SUBSTR. WID./REPAIR

REMOVE PORTION OF CONC.

SLAB STR. 6018/6323

SY

80.000

ATTD

0090 413SX20-0005

REM. PORT.OF EX.STR. 6002 LUMP SUM _________._____LUMP SUM

0100 413SX20-0005

REM. PORT.OF EX.STR. 6017 LUMP SUM _________._____LUMP SUM

0110 414SD20-0067

CONCRETE SLAB RIPRAP SY

80.000

0120 414SX20-0007

RIPRAP STONE 30" TON

160.000

ATTD, 414

Schedule of Items Page: 3

Proposal ID: C0000122277N01B BRDG-967-567, N501

Order No.: K73

Oversight/State Project No.:

Federal Project No.: STP-BR07(336)

Contractor:

0001 REGULAR BID ITEMSSECTION:

Cat Alt Set ID: Cat Alt Mbr ID:

Bid AmountUnit Price Approximate Quantity and

UnitsDescription

Item ID Proposal

Line Number Dollars Cents Dollars Cents

Spec No.

0130 509SD20-0001

FLOWABLE BACKFILL CY

160.000

0140 512SP20-0002

MAINTENANCE OF TRAFFIC

STR. 1056

LUMP SUM _________._____LUMP SUM

ATTD

0150 512SP20-0002

MAINTENANCE OF TRAFFIC

STR. 1165

LUMP SUM _________._____LUMP SUM

ATTD

0160 512SP20-0002

MAINTENANCE OF TRAFFIC

STR. 6002

LUMP SUM _________._____LUMP SUM

ATTD

0170 512SP20-0002

MAINTENANCE OF TRAFFIC

STR. 6017

LUMP SUM _________._____LUMP SUM

ATTD

0180 512SP20-0002

MAINTENANCE OF TRAFFIC

STR. 6018

LUMP SUM _________._____LUMP SUM

ATTD

0190 512SP20-0002

MAINTENANCE OF TRAFFIC

STR. 6082

LUMP SUM _________._____LUMP SUM

ATTD

0200 512SP20-0002

MAINTENANCE OF TRAFFIC

STR. 6084

LUMP SUM _________._____LUMP SUM

ATTD

0210 512SP20-0002

MAINTENANCE OF TRAFFIC

STR. 6183

LUMP SUM _________._____LUMP SUM

ATTD

0220 512SP20-0002

MAINTENANCE OF TRAFFIC

STR. 6323

LUMP SUM _________._____LUMP SUM

ATTD

0230 513SD20-0001

MOBILIZATION LUMP SUM _________._____LUMP SUM

Section: 0001 _________._____Total:

Total Bid: _________._____

Page

Bid Items Eligible For Fuel Adjustment

C0000122277N01B

K73

Contract ID:

Order No.:

Instructions: This form shall be completed in accordance with the Special Provision for Optional Adjustment for Fuel. If you choose to have Fuel Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.

FORM C-21B

Rev 12-21-05

0001 REGULAR BID ITEMSSECTION:

ltem Description Fuel Factor gal/unit Option Item

Number

_______AGGR. MATL. NO. 25 OR 26 0.600305SD20-

_______AGGR. MATL. NO. 1 0.600308SD20-

Date:

Signature:

(Firm or Corporation)

(Vendor No.)

Bid Items Eligible For Steel Price Adjustment

C0000122277N01B

K73

Contract ID:

Order No.:

Instructions: This form shall be completed in accordance with the Special Provision. If you choose to have Steel Price Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.

Rev 12-21-08

FORM C-21C

0001 REGULAR BID ITEMSSECTION:

ltem Description Option Item

Number

_______REINFORCING STEEL SPR. STRUCT. MAINT.406SD20-

Date:

Signature:

(Firm or Corporation)

(Vendor No.)

Determination of Major Items

1C0000122277N01BContract ID:

ltem Description Item

Number

COFFERDAM401SD20-0007

CONCRETE CLASS A3 SUBSTRUCT. MAINT.404SX20-0001

Form C-111

Rev. 2-15-11

MINIMUM DBE REQUIREMENTS

PROJECT NO: BRDG-967-567, N501

FHWA NO: STP-BR07(336)

* * * I N S T R U C T I O N S * * *

THIS FORM CAN BE USED BY THE CONTRACTOR TO SUBMIT THE NAMES OF DBE FIRMS TO BE UTILIZED ON THE PROJECT. THE CONTRACTOR SHALL INDICATE THE DESCRIPTION OF THE CATEGORY (S, M, SP or H) AND THE TYPE OF WORK THAT EACH DBE WILL PERFORM AND THE ALLOWABLE CREDIT PER ITEM(S). ADDITIONAL SHEETS TO SHOW THE ALLOWABLE CREDIT PER ITEM MAY BE ATTACHED IF NECESSARY. PLEASE NOTE: THE AMOUNT OF ALLOWABLE CREDIT FOR A DBE SUPPLIER IS 60% OF THE TOTAL COST OF THE MATERIALS OR SUPPLIES OBTAINED AND 100% FOR A DBE MANUFACTURER OF THE MATERIALS AND SUPPLIES OBTAINED. A CONTRACTOR MAY COUNT 100% OF THE FEES PAID TO A DBE HAULER FOR THE DELIVERY OF MATERIALS AND SUPPLIES TO THE PROJECT SITE, BUT NOT FOR THE COST

OF THE MATERIALS AND SUPPLIES THEMSELVES.

SECTION I:

DBE REQUIREMENT 11.00%

SECTION II:

PERCENT ATTAINED BY BIDDER %

NAME(s) AND CERTIFICATION

NO. OF DBE(s) TO BE USED

USED AS

SUBCONTR. (S)

MFG. (M)

SUPPLIER (SP)

HAULER (H)

TYPE OF WORK & ITEM

NO(s)

AMT. OF

ALLOWABLE

CREDIT PER

ITEM

TOTAL: $

Total Contract Value $ X Required DBE % =$

I/WE CERTIFY THAT THE PROPOSED DBE (S) SUBMITTED WILL BE USED ON THIS CONTRACT AS

STATED HEREON AND ASSURE THAT DURING THE LIFE OF THE CONTRACT, I/WE WILL MEET OR

EXCEED THE PARTICIPATION ESTABLISHED HEREON BY THE DEPARTMENT.

By

BIDDER SIGNATURE

By

TITLE DATE

Form C-112 Rev. 3-1-11

COMMONWEALTH OF VIRGINIA

DEPARTMENT OF TRANSPORTATION

CERTIFICATION OF BINDING AGREEMENT WITH

DISADVANTAGED BUSINESS ENTERPRISE FIRMS

Project No.: BRDG-967-567, N501

FHWA NO: STP-BR07(336)

This form is to be submitted in accordance with the Department’s Special Provision for Section 107.15.

It is hereby certified by the below signed Contractors that there exists a written quote, acceptable to the parties involved preliminary to a binding subcontract agreement stating the details concerning the work to be performed and the price which will be paid for the aforementioned work. This document is not intended to, nor should it be construed to, contain the entire text of the agreement between the contracting parties.

This document does not take the place of, nor may it be substituted for, an official subcontracting agreement in those situations that may require such an agreement. A copy of the fully executed subcontract agreement shall be submitted to the Engineer within fourteen (14) working days after contract execution.

It is further certified that the aforementioned mutually acceptable quote and fully executed subcontract agreement represent the entire agreement between the two parties involved and that no conversations, verbal agreements, or other forms of non-written representations shall serve to add to, delete, or modify the terms as stated.

The prime Contractor further represents that the aforementioned mutually acceptable quote and fully executed subcontract agreement shall remain on file for a period of not less than one year following completion of the prime's contract with the Department or for such longer period as provisions of governing Federal or State law or regulations may require. For purposes of this form, the term Prime Contractor shall refer to any Contractor utilizing a DBE subcontractor, regardless of tier, in which they are claiming DBE credit toward the contract goal.

Contractors further jointly and severally represent that said binding agreement is for the performance of a "commercially useful function" as that term is employed in 49 C.F.R. Part 26.55 (c), (d).

TO BE SIGNED BY THE SUBCONTRACTOR TO THE PRIME CONTRACTOR, AND ANY LOWER TIER

SUBCONTRACTORS HAVING A CONTRACT WITH THE BELOW NAMED DBE FIRM

Prime Contractor:

By:

Signature Title Date:

First Tier Subcontractor If Applicable:

Form C-112 Rev. 3-1-11

Second Tier

If Applicable:

Third Tier

If Applicable

DBE Contractor

FORMS and SCHEDULE OF ITEMS PRECEDE SPCNs, SPs and SUPPLEMENTAL SPECS.

*CN100-000026-08 GEN. PROJ. REQUIRE., SSS/SPS/SPCNS 4-4-22 (SPCN) 1

CN512-000120-00 SEC. 512—MAINTAINING TRAFFIC (IMPACT ATTEN. SER.) 7-13-16_(SPCN) 1

CN522-000300-00 PROTECT NESTING BIRDS DURING BRIDGE MAINT. 7-24-20 (SPCN) 1

*DRUG-FREE WORKPLACE 7-3-19 (SPCN) 2

CQ107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY 5-11-22 2

PROTECTION OF BAT SPECIES 1-17-18 (SPCN) 3

SECT. 413 – DISM. & REMOV. EXIST. STRUCT. OR REMOVE PORT. OF EXIST. STRUCT. 10-11-

23 (SPCN) 3

SECTION 506 – RETAINING WALLS 10-11-23 (SPCN) 3

FLOWABLE BACKFILL 10-16-23 (SPCN) 4

IN-STREAM WORK 10-16-23 (SPCN) 4

INSTALLATION OF CURTAIN WALLS OR RIP RAP 10-16-23 (SPCN) 4

REMOVAL OF LOOSE OR DETERIORATED CONCRETE 10-16-23 (SPCN) 4

SP0F0-000100-00 PREDETERMINED MIN. WAGE RATES R-7-12-16 5

SP0F0-000130-02 FHWA 1273—REQ. PROVISIONS, FED-AID 10-3-23 41

SP0F0-000150-01 AFFIRMATIVE ACTION / EEO NOTICE 7-17-17 68

SP102-000120-00 NON-DISCRIMIN. EMPLOY. & CONTRACT. PRACTICES (EO-61) 1-10-17 74

*SP102-000510-02 USE OF DOMESTIC MATERIAL 12-19-18 75

SP105-000100-00 INFORMAL PARTNERING R-7-12-16 77

SP107-000110-00 C-45–SWPPP GEN. PERMIT–CONTRACTOR CERTIFICATION R-10-27-16 79

*SP107-000120-00 ELEC. SUBMISSION OF DBE AND PAYROLLS 1-21-20 80

SP107-001510-02 SEC. 107.15 (DBES) 8-18-17 82

*SP107-003000-01 BUILD AMERICA, BUY AMERICA ACT REQUIREMENTS FOR CONSTRUCTION

MATERIALS 6-8-23 101

SP109-000110-00 OPTIONAL ADJUSTMENT FOR FUEL R-7-12-16 103

SP109-000120-01* PRICE ADJUSTMENT FOR STEEL 7-2-19 105

SP109-000130-00 ELECTRONIC WEIGH TICKETS 10-10-19 110

SP512-000110-00 SEC. 512—MAINT. TRAFFIC—NON-SCHEDULES (LS) 7-12-16 112

SP522-000130-02 TREE REMOVAL TIME OF YEAR RESTRICTION 6-6-22 116

SP801-000100-01 LANE CLOSE COORD (LCC)/LANE CLOSE IMPLEMENT (LCI) 9-20-17 117

SQ107-001300-00 PREVAILING WAGE RATES 10-12-2023 119

SS109-002020-01 SEC. 109—MEASUREMENT AND PAYMENT 5-1-23 123

*SS211-002020-02 SECT 211 – ASPHALT CONCRETE 5-15-23 126

*SS220-002020-01 SEC. 220 – CONCRETE CURING MATERIALS 8-28-20 131

*SS234-002020-01 SECTION 234 – GLASS BEADS AND RETROREFLECTIVE OPTICS 5-6-22 132

*SS235-002020-01 SECTION 235 – RETROREFLECTORS 5-6-22 133

SS236-002020-01 SECTION 236 – WOOD PRODUCTS 5-14-21 134

*SS246-002020-02 SECTION 246 – PAVEMENT MARKING 5-6-22 138

SECTION 248 – STONE MATRIX ASPHALT CONCRETE 5-26-23 146

*SS305-002020-02 SECTION 305 – SUBGRADE AND SHOULDERS 12-20-23 148

SS308-002020-01 SECTION 308 -SUBBASE COURSE 7-13-21 150

SS309-002020-01 SECTION 309 - AGGREGATE BASE COURSE 7-13-21 151

SS315-002020-04 SECTION 315 – ASPHALT CONCRETE PLACEMENT 6-16-23 152

SS318-002020-01 SECTION 318—PAVEMENT INTERLAYERS 8-2-23 170

SS321-002020-02 SECTION 321 – TRENCH WIDENING 4-4-23 171

*SS407-002020-02 SEC. 407 – STEEL & METAL STRUCT 11-01-22 173

*SS411-002020-01 SEC. 411 – PROT. COAT. OF METAL 11-01-22 176

*SS512-002020-03 SECTION 512 – MAINTAINING TRAFFIC 7-1-22 177

TABLE OF CONTENTS FOR PROVISIONS

*SS704-002020-02 SECTION 704 – PAVEMENT MARKINGS AND MARKERS 5-6-22 191

ENVIRONMENTAL PERMITS 197

NO PLAN ASSEMBLY 237

cn100-000026-08 GENERAL PROJECT REQUIREMENTS, SUPPLEMENTAL SPECIFICATIONS

(SSs), SPECIAL PROVISIONS (SPs) AND SPECIAL PROVISION COPIED NOTES (SPCNs)

This project shall be constructed according to: the plans; the Virginia Department of Transportation Road and Bridge Specifications, dated 2020 and the Supplement thereto, dated 2022; the Virginia Department of Transportation Road and Bridge Standards, dated 2016, with revisions issued online as of the advertisement date for this project incorporated; the 2011 edition of the Virginia Work Area Protection Manual with Revision Number 2.1 incorporated, dated November 1, 2020; the 2009 edition of the MUTCD with Revision Numbers 1 and 2 incorporated, dated May 2012; and the 2011 edition of the Virginia Supplement to the MUTCD with Revision Number 1 dated September 30, 2013; and the Supplemental Specifications, Special Provisions and Special Provision Copied Notes in this contract. The status in the Contract of each of these documents will be according to Section 105.12 of the Specifications.

Special Provision Copied Notes in this contract are designated with “(SPCN)” after the date.

The information at the top and left of each Special Provision Copied Note in this contract is file reference information for Department use only. The information in the upper left corner above the title of each Supplemental Specification and Special Provision in this contract is file reference information for Department use only.

4-4-22 (SPCN)

cn512-000120-00 SECTION 512—MAINTAINING TRAFFIC of the Specifications is amended as follows:

Section 512.03(i)—Impact Attenuator Service is amended to replace the second paragraph with the following:

Only Type 1 re-directive low-maintenance impact attenuators in accordance with Section 505 shall be used on highways with posted speed limits greater than 50 mph or with an ADT greater than 25,000 vehicles per day.

7-13-16_(SPCN)

cn522-000300-00 PROTECTION OF NESTING BIRDS DURING BRIDGE MAINTENANCE — If bird nests are found on a bridge included in the Contract, the Contractor shall immediately notify the Engineer and suspend all work in the immediate vicinity of the nests until authorized to continue. The Contractor may proceed with other work activities that do not result in removal of nests or nest contents.

7-24-20 (SPCN)

https://outsidevdot.cov.virginia.gov/P0JQP/2016_Standard_Specifications/cn512-000120-00.docx https://outsidevdot.cov.virginia.gov/P0JQP/2020%20Standard%20Specifications/cn522-000300-00.docx

DRUG-FREE WORKPLACE– The Contractor shall:

• Provide a Drug-Free Workplace for the Contractor’s employees.

• Post in conspicuous places, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the Contractor’s workplace and specifying the actions that will be taken against employees for violations of such prohibition.

• State in all solicitations or advertisements for employees placed by or on behalf of the Contractor that the Contractor maintains a Drug-Free Workplace.

• Include the provisions of the foregoing clauses in every Subcontract or purchase order of over $10,000, so that the provisions will be binding upon each Subcontractor or vendor.

For the purposes of this provision, “Drug-Free Workplace” means a site for the performance of work done in connection with the Contract. The Contractors employees, and those of his Subcontractors, shall be prohibited from engaging in the unlawful manufacture, sale, distribution, dispensation, possession, or use of any controlled substance or marijuana during the performance of the Work.

7-3-19 (SPCN)

cq107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY

Section 107.14(a)1 – Required by §2.2-4201 and §2.2-4311 of the Code of Virginia is replaced with the following:

1. Required by §2.2-4201 and §2.2-4311 of the Code of Virginia: During the performance of this Contract, the Contractor agrees as follows:

a. The Contractor shall not discriminate against any employee or applicant for employment because of race, religion, color, sex, or national origin, age, disability, or other basis prohibited by state law relating to discrimination in employment, except where religion, sex, or national origin is a bona fide occupational qualification reasonably necessary to the normal operation of the Contractor. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause, including the names of all contracting agencies with which the Contractor has contracts of over $10,000.

b. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that such contractor is an equal opportunity employer. However, notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this chapter.

c. If the Contractor employs more than five employees, the Contractor shall (i) provide annual training on the Contractor's sexual harassment policy to all supervisors and employees providing services in the Commonwealth, except such supervisors or employees that are required to complete sexual harassment training provided by the Department of Human Resource Management, and (ii) post the Contractor's sexual harassment policy in (a) a conspicuous public place in each building located in the Commonwealth that the Contractor owns or leases for business purposes and (b) the Contractor's employee handbook.

The Contractor shall include the provisions of subdivisions a, b, and c in every subcontract or purchase order of over $10,000, so that such provisions shall be binding upon each subcontractor or vendor.

Nothing contained in this chapter shall be deemed to empower any agency to require any contractor to grant preferential treatment to, or discriminate against, any individual or any group because of race, color, religion, sex, or national origin on account of an imbalance that may exist with respect to the total number or percentage of persons of any race, color, religion, sex, or national origin employed by such contractor in comparison with the total number or percentage of persons of such race, color, religion, sex, or national origin in any community or in the Commonwealth.

5-11-22 (SPCN)

PROTECTION OF BAT SPECIES — If bats are observed roosting on a structure, the Contractor shall immediately notify the Engineer and suspend work in the immediate vicinity of the bats until authorized to continue.

1-17-18 (SPCN)

SECTION 413 – DISMANTLING AND REMOVING EXISTING STRUCTURES OR REMOVE PORTIONS

OF EXISTING STRUCTURES is amended as follows:

Section 413.03—Measurement and Payment is amended to include the following:

Remove portion of concrete slab will be measured in square yards and will be paid for at the Contract square yard price. This price shall include saw cutting, removing, and disposing of the damaged concrete slab riprap.

Payment will be made under:

Pay Item Pay Unit Remove portion of concrete slab (Str. No.) Square yard

10-11-23 (SPCN)

SECTION 506 – RETAINING WALLS is amended as follows:

Section 506.04 – Measurement and Payment is amended to include the following:

Reconstruct Existing Mortar Retaining Walls will be measured in square feet and will be paid for at the Contract square foot price. This price shall include salvaging existing stone or furnishing stones that are the same size and appearance as the existing stone; placing and mortaring the stones; and removing and repointing deteriorated mortar.

Payment will be made under:

Pay Item Pay Unit Reconstruct existing mortar retaining walls Square foot

10-11-23 (SPCN)

FLOWABLE BACKFILL— used for filling voids under existing slope protection will be measured and paid for in accordance with Section 509 of the Specifications, except the Contract cubic yard price shall also include providing and repairing access holes in the existing slope protection.

10-16-23 (SPCN)

IN-STREAM WORK—The Contractor shall submit to the Engineer a detailed plan for all in-stream work, including but not limited to: cofferdam installation and removal; containment of construction related material, pieces of concrete debris, uncured concrete, etc.; and preventing construction debris from entry into jurisdictional bodies, such as streams and wetlands. The cost of this work shall be included in the Contract unit price for other appropriate items of work.

INSTALLATION OF CURTAIN WALLS OR RIP RAP—Removal and disposal of existing materials that affect the placement of the new curtain walls or riprap, such as loose debris, vegetation, existing scour countermeasures, or any other materials, shall be incidental to the work and will not be measured for separate payment.

Water gates attached to structures that interfere with construction activity may be temporarily adjusted and restored to original condition at no additional cost to the Department.

REMOVAL OF LOOSE OR DETERIORATED CONCRETE—The removal of loose or deteriorated concrete that affects the bond at the interface with new concrete will not be measured for separate payment and the cost shall be included in the Contract cubic yard price for Concrete, Class A3.

SP0F0-000100-00

Reissued July 12, 2016

PREDETERMINED MINIMUM WAGE RATES

"General Decision Number: VA20240099 01/05/2024

Superseded General Decision Number: VA20230099

State: Virginia

Construction Type: Highway

Counties: Albemarle and Charlottesville* Counties in Virginia.

*including the independent city of Charlottesville

HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction;

bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction;

and other major bridges).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | https://outsidevdot.cov.virginia.gov/P0JQP/2016_Standard_Specifications/SP0F0-000100-00.docx

|If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2024

ELEC0080-011 12/01/2021

Rates Fringes

ELECTRICIAN, Includes Traffic Signalization....................$ 30.55 11.51

SUVA2016-035 07/02/2018

Rates Fringes

CARPENTER, Includes Form Work....$ 17.20 0.00

CEMENT MASON/CONCRETE FINISHER...$ 19.94 0.00

IRONWORKER, REINFORCING..........$ 22.71 0.00

IRONWORKER, STRUCTURAL...........$ 27.38 0.00

LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor......................$ 15.92 ** 0.00

LABORER: Common or General......$ 14.65 ** 0.00

LABORER: Grade Checker..........$ 15.07 ** 0.00

LABORER: Pipelayer..............$ 15.11 ** 0.00

LABORER: Power Tool Operator....$ 15.69 ** 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 21.69 0.00

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 19.16 4.45

OPERATOR: Broom/Sweeper.........$ 14.32 ** 0.25

OPERATOR: Crane.................$ 25.82 0.00

OPERATOR: Drill.................$ 24.66 0.00

OPERATOR: Gradall...............$ 18.65 0.00

OPERATOR: Grader/Blade..........$ 26.13 0.00

OPERATOR: Hydroseeder...........$ 16.64 ** 0.00

OPERATOR: Loader................$ 18.39 0.00

OPERATOR: Mechanic..............$ 20.60 0.00

OPERATOR: Milling Machine.......$ 23.12 3.60

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 18.00 0.00

OPERATOR: Piledriver............$ 21.83 4.08

OPERATOR: Roller................$ 18.90 0.00

OPERATOR: Screed................$ 22.13 4.89

OPERATOR: Asphalt Spreader and Distributor..................$ 16.51 ** 0.00

OPERATOR: Bulldozer, Including Utility................$ 19.26 0.00

PAVEMENT MARKING TRUCK DRIVER....$ 18.83 0.00

TRAFFIC CONTROL: Flagger.......$ 10.22 ** 0.00

TRUCK DRIVER : HEAVY 7CY &

UNDER............................$ 15.36 ** 0.00

TRUCK DRIVER: Fuel and Lubricant Service................$ 18.25 0.00

TRUCK DRIVER: HEAVY OVER 7

CY...............................$ 17.74 0.00

TRUCK DRIVER: Single & Multi Axle.............................$ 19.06 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

"General Decision Number: VA20240114 01/05/2024

Superseded General Decision Number: VA20230114

State: Virginia

Construction Type: Highway

County: Culpeper County in Virginia.

HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction;

bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction;

and other major bridges).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. |

|If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker

ELEC0080-011 12/01/2021

Rates Fringes

ELECTRICIAN, Includes Traffic Signalization....................$ 30.55 11.51

PLAS0891-011 06/01/2020

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 20.70 8.03

SUVA2016-050 07/02/2018

Rates Fringes

CARPENTER, Includes Form Work....$ 20.11 0.00

FENCE ERECTOR....................$ 15.28 ** 0.00

IRONWORKER, REINFORCING..........$ 34.18 0.00

IRONWORKER, STRUCTURAL...........$ 34.18 0.00

LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor......................$ 19.05 1.75

LABORER: Common or General......$ 15.50 ** 0.00

LABORER: Grade Checker..........$ 14.88 ** 0.00

LABORER: Pipelayer..............$ 20.48 0.00

LABORER: Power Tool Operator....$ 15.69 ** 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 19.35 0.00

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 19.00 3.49

OPERATOR: Broom/Sweeper.........$ 17.40 2.01

OPERATOR: Crane.................$ 29.46 0.00

OPERATOR: Drill.................$ 24.89 0.00

OPERATOR: Gradall...............$ 19.26 0.00

OPERATOR: Grader/Blade..........$ 23.21 0.00

OPERATOR: Hydroseeder...........$ 16.64 ** 0.00

OPERATOR: Loader................$ 18.92 0.00

OPERATOR: Mechanic..............$ 22.84 0.00

OPERATOR: Milling Machine.......$ 23.19 2.94

OPERATOR: PAVEMENT PLANER

GROUNDSMEN.......................$ 19.75 0.00

OPERATOR: PAVEMENT PLANER.......$ 21.14 0.00

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 20.33 2.81

OPERATOR: Piledriver............$ 21.83 4.08

OPERATOR: Roller (Finishing)....$ 18.11 0.00

OPERATOR: Roller................$ 19.97 0.00

OPERATOR: Screed................$ 22.13 4.89

OPERATOR: Asphalt Spreader and Distributor..................$ 20.58 2.31

OPERATOR: Bulldozer, Including Utility................$ 20.64 0.00

PAVEMENT MARKING OPERATOR........$ 22.15 0.00

PAVEMENT MARKING TRUCK DRIVER....$ 18.78 0.00

TRAFFIC CONTROL: Flagger.......$ 13.64 ** 0.00

TRUCK DRIVER : HEAVY 7CY &

UNDER............................$ 15.53 ** 0.00

TRUCK DRIVER: Fuel and Lubricant Service................$ 18.25 0.00

TRUCK DRIVER: HEAVY OVER 7

CY...............................$ 18.05 0.00

TRUCK DRIVER: Single & Multi Axle.............................$ 18.61 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current

"General Decision Number: VA20240117 01/05/2024

Superseded General Decision Number: VA20230117

State: Virginia

Construction Type: Highway

County: Fauquier County in Virginia.

HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction;

bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction;

and other major bridges).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the |

|If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker

ELEC0080-011 12/01/2021

Rates Fringes

ELECTRICIAN, Includes Traffic Signalization....................$ 30.55 11.51

PLAS0891-011 06/01/2020

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 20.70 8.03

SUVA2016-053 07/02/2018

CARPENTER, Includes Form Work....$ 20.97 0.00

IRONWORKER, STRUCTURAL...........$ 34.18 0.00

LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor......................$ 19.05 1.75

LABORER: Common or General......$ 16.52 ** 0.00

LABORER: Grade Checker..........$ 14.88 ** 0.00

LABORER: Pipelayer..............$ 20.48 0.00

LABORER: Power Tool Operator....$ 15.69 ** 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 23.93 0.00

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 19.00 3.49

OPERATOR: Broom/Sweeper.........$ 17.40 2.01

OPERATOR: Crane.................$ 29.46 0.00

OPERATOR: Drill.................$ 24.89 0.00

OPERATOR: Gradall...............$ 19.26 0.00

OPERATOR: Grader/Blade..........$ 23.21 0.00

OPERATOR: Hydroseeder...........$ 16.64 ** 0.00

OPERATOR: Loader................$ 18.92 0.00

OPERATOR: Mechanic..............$ 22.84 0.00

OPERATOR: Milling Machine.......$ 23.19 2.94

OPERATOR: PAVEMENT PLANER

OPERATOR: Piledriver............$ 21.83 4.08

OPERATOR: Roller (Finishing)....$ 18.73 3.23

OPERATOR: Roller................$ 18.92 0.00

OPERATOR: Screed................$ 22.13 4.89

OPERATOR: Asphalt Spreader and Distributor..................$ 20.58 2.31

OPERATOR: Bulldozer, Including Utility................$ 20.64 0.00

PAVEMENT MARKING OPERATOR........$ 22.15 0.00

PAVEMENT MARKING TRUCK DRIVER....$ 18.78 0.00

TRAFFIC CONTROL: Flagger.......$ 13.64 ** 0.00

TRUCK DRIVER : HEAVY 7CY &

UNDER............................$ 15.53 ** 0.00

TRUCK DRIVER: Fuel and Lubricant Service................$ 18.25 0.00

TRUCK DRIVER: HEAVY OVER 7

CY...............................$ 18.05 0.00

TRUCK DRIVER: Single & Multi…