K69_119463.pdf
PDF 2 MB Posted
- Attached to
- K69_2023 SMART SCALE - INTERSECTION IMPROVEMENT
- Solicitation number
- 50903
- Issued by
- Franklin County, Salem City, Virginia
About this file
This document is a bid proposal and contract for a state and local government transportation project in Franklin County and Salem City, Virginia. The project, called the "SMART SCALE - INTERSECTION IMPROVEMENT", involves intersection improvements along Route 220 from 0.184 miles south to 0.108 miles north of the intersection with Route 635. The work includes items such as concrete pipe installation, grading, borrow excavation, pavement construction, guardrail, traffic control, and landscaping. Bids are due by 10:00 AM on Wednesday, January 17, 2024. The project has a completion date of May 30, 2025.
The bid proposal includes unit pricing for over 80 line items of work. The contract requires compliance with state and federal requirements, including Davis-Bacon prevailing wage rates, disadvantaged business enterprise (DBE) goals, and Buy America steel provisions. Bidders must submit a bid bond and are required to be prequalified with the Virginia Department of Transportation to bid on this project. Payment and performance bonds will also be required from the successful contractor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Programmatic Addendum Letter_20240112_Signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORDER NO.: K69
CONTRACT ID. NO.: C0000119463C01
Form C-6a Rev. 3-22-05
CNSP (F) 1-9-06
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
BID PROPOSAL AND CONTRACT
ROUTE NUMBER: 220
FHWA NUMBER: STP-033-2(065)
PROJECT NUMBER: 0220-033-858, M501
COUNTY: FRANKLIN
DISTRICT: SALEM
DESCRIPTION: SMART SCALE - INTERSECTION IMPROVEMENT
FROM: 0.184 MI. S. INTERSECTION RTE. 635
TO: 0.108 MI. N. INTERSECTION RTE. 635
DATE BID SUBMITTED: 10:00 A.M. WEDNESDAY, JANUARY 17, 2024
Form C-118 Rev. 7-6-05
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
NOTICE TO BIDDERS
As a matter of information, the bidder’s attention is directed to the points noted herein. Every point enumerated below is fully covered by proposal documents that describe them in detail. Bidders should check their proposal against all requirements, as strict compliance with all provisions is mandatory.
1. Bids shall be filed electronically through Bidx (www.bidx.com\main\index.html) at the times designated in the Notice of Advertisement for Bids. For information see (http://cabb.virginiadot.org/cabb/)
2. Unless otherwise specified or permitted in the proposal, prices shall be submitted on all items shown in the proposal.
3. Proposals conditioned by proposed alternates, other than those specified or permitted, or by reserving the right to accept or reject an award or to enter into a contract pursuant to an award will not be considered.
4. A bid total shall be shown in each space provided.
5. Bid bonds shall conform to Section 102.07. The bid bond number shall be placed in the appropriate space in your electronic bid. As an alternative you may complete the bottom line of the Form C-24. This form may be mailed or faxed but must be received prior to the opening of the bids.
6. Joint venture proposals shall show the Firm Name of each party and shall be signed by an authorized representative of each Firm. A letter shall be filed with the prequalification office describing responsibility of each firm and the amount of maximum capacity pledge by each firm of a joint venture.
http://www.bidx.com/main/index.html http://cabb.virginiadot.org/cabb/
Form C-24 Rev. 7-6-05
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
PROPOSAL GUARANTY
KNOW ALL MEN BY THESE PRESENTS, THAT WE As principal, and Surety, are held and firmly bound unto the
Commonwealth of Virginia as obligee, in the amount of FIVE PERCENT OF THE DOLLAR VALUE OF THE
BID, lawful money of the United States of America, for the payment of which, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally and firmly by these presents.
SIGNED, sealed and dated this Day of , 20
WHEREAS, the above said principal is herewith submitting its proposal for:
PROJECT NUMBER: 0220-033-858,M501
NOW, THEREFORE, the condition of the above obligee is such, that if the aforesaid principal shall be awarded the contract upon said proposal and shall within the time specified in the Specifications after the notice of such award enter into a contract and give bond for the faithful performance of the contract, then this obligation shall be null and void; otherwise to remain in full force and effect and the principal and surety will pay unto the obligee the difference in money between the amount of the bid of the said principal and the amount for which the obligee may legally contract with another party to perform the said work if the latter amount be in excess of the former; but in no event shall the liability exceed the penal sum hereof.
(Principal*) (Surety Company)
By: By:
(Officer, Partner or Owner) (Seal) (Attorney-in-Fact**) (Seal)
(Principal*) (Address)
By: By:
(Officer, Partner or Owner) (Seal) (Surety Company)
(Principal*) (Attorney-in-Fact**) (Seal)
By: By:
(Officer, Partner or Owner) (Seal) (Address)
*Note: If the principal is a joint venture, each party thereof must be named and execution made by same hereon. If there is more than one surety to the bid bond, each surety must be named and execution shall be made by same hereon.
Electronic Bid Only: In lieu of completing the above section of the Contract Performance Bond, the Principal shall file an Electronic Bid Bond when bidding electronically. By signing below the Principal is ensuring the identified electronic bid bond has been executed and the Principal and Surety are firmly bound unto the Commonwealth of Virginia under the same conditions of the bid bond as shown above.
Electronic Bid Bond ID# Company/Bidder Name Signature and Title
**Attach copy of Power of Attorney
Form C-48 Rev. 2-23-11
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION FORM (ALL BIDDERS)
PROJECT NO.: 0220-033-858,M501 CONTRACT ID. NO.: C0000119463C01
FHWA NO: STP-033-2(065) DATE SUBMITTED____________________
All bidders, including DBEs bidding as Prime Contractors, shall complete and submit the following information as requested in this form within ten (10) business days after the opening of bids.
The bidder certifies this form accurately represents its solicitation and utilization or non-utilization, as indicated, of the firms listed below for performance of work on this contract. The bidder also certifies he/she has had direct contact with the named firms regarding participation on this project.
BIDDER_________________________________SIGNATURE________________________________
TITLE_____________________________________________________________________________
SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION (ALL)
VENDOR
NUMBER NAME OF SUBCONTRACTOR/SUPPLIER TELEPHONE NUMBER
DBE OR
NON-DBE
UTILIZED
(Y/N)
NOTE: ATTACH ADDITIONAL PAGES, IF NECESSARY.
BIDDER MUST SIGN EACH ADDITIONAL SHEET TO CERTIFY ITS CONTENT AND COMPLETION OF FORM.
Form C-7 Rev. 1-19-12
TERMS OF THE PROPOSAL\CONTRACT
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
SUBMITTED: 10:00 A.M. WEDNESDAY, JANUARY 17, 2024
PROJECT NUMBER:
ROUTE NUMBER:
FHWA NUMBER:
DESCRIPTION:
0220-033-858,M501
STP-033-2(065)
SMART SCALE - INTERSECTION IMPROVEMENT
FROM: 0.184 MI. S. INTERSECTION RTE. 635
TO: 0.108 MI. N. INTERSECTION RTE. 635
DISTRICT: SALEM COUNTY: FRANKLIN
I/we declare that no other person, firm or corporation is interested in this proposal; that I/we have carefully examined the plans, job specifications, current Road and Bridge specifications, and all other documents pertaining thereto and thoroughly understand the contents thereof; that I/we meet the prequalification requirements for bidding on this proposal;
that I/we understand that the plans and current Road and Bridge specifications, are a part of this proposal; that all of the quantities shown herewith are a part of this proposal; that all the quantities shown herewith are approximate only; that I/we have examined the location of the proposed work and source of supply of materials; and that I/we agree to bind myself/ourselves upon award by the Commonwealth under this proposal to a contract with necessary surety bond to start work according to project specifications, and to complete all work in accordance with the plans, job specifications and current Road and Bridge Specifications within the time limit set forth in the contract.
COMPLETION DATE: MAY 30, 2025
BID TOTAL $
Attached is a bond conforming to the requirements of the current Road and Bridge Specifications, it being understood that such bond is to be forfeited as liquidated damages if, upon acceptance of the terms of this proposal, I/we fail to execute the contract and furnish bond as provided in the current Road and Bridge Specifications.
(Names of Individual(S),Firm(S) Or Corporation)
Street Address City State Zip Code Vendor#/Fin#
Print Name Signature Title
In consideration of the commitments made as shown herein, the Commonwealth of Virginia by The Commonwealth Transportation Commissioner agrees to pay for all items of work performed and materials furnished at the unit price(s) and under the conditions set forth in this proposal, in witnessed by the affixing of the name below.
Contract Execution Date By
CHIEF ENGINEER
VIRGINIA DEPARTMENT OF TRANSPORTATION
Virginia Department of Transportation 11/27/2023Date Printed:
Schedule of Items Page: 2
Proposal ID: C0000119463C01 0220-033-858,M501
Order No.: K69
Oversight/State Project No.:
Federal Project No.: STP-033-2(065)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0010 108SP20-0001
BASELINE PROGRESS
SCHEDULE
LUMP SUM _________._____LUMP SUM
ATTD
0020 108SP20-0002
PROGRESS SCHEDULE
UPDATES
EA
12.000
ATTD
0030 302SD20-0025
15" CONC. PIPE LF
52.000
0040 302SD20-0030
18" CONC. PIPE LF
302.000
0050 302SD20-0039
24" CONC. PIPE LF
414.000
0060 302SD20-0315
DROP INLET DI-3B,L=12' EA
7.000
0070 302SD20-0324
DROP INLET DI-3BB,L=12' EA
1.000
0080 302SD20-0446
DROP INLET DI-5 EA
1.000
0090 303SD20-0004
GRADING LUMP SUM _________._____LUMP SUM
0100 303SD20-0007
BORROW EXCAVATION CY
318.000
0110 303SD20-0023
CHECK DAM ROCK TY. II EA
10.000
0120 303SD20-0029
SILTATION CONTROL
EXCAVATION
CY
99.000
0130 303SD20-0030
INLET PROTECTION TYPE A EA
3.000
0140 303SD20-0031
INLET PROTECTION TYPE B EA
8.000
Schedule of Items Page: 3
Proposal ID: C0000119463C01 0220-033-858,M501
Order No.: K69
Oversight/State Project No.:
Federal Project No.: STP-033-2(065)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0150 303SD20-0034
TEMP. SILT FENCE TYPE A LF
22.000
0160 308SD20-0012
AGGR. BASE MATL. TY. I NO.
21B
TON
617.000
0170 308SD20-0016
AGGR. MATERIAL NO. 21B -
SHOULDER STONE
TON
20.000
0180 308SD20-0016
AGGR. MATERIAL NO. 3 TON
1,185.000
0190 308SX20-0003
CRUSHER RUN AGGR. NO. 25
OR 26
TON
8.000
ATTD
0200 315SD20-0005
ASPHALT CONCRETE TY. IM-
19.0D CONST
TON
1,048.000
0210 315SD20-0008
ASPHALT CONCRETE TY. SM-
9.5D CONST
TON
1,283.000
0220 315SD20-0011
ASPHALT CONCRETE TY. BM-
25.0D CONST
TON
2,568.000
0230 315SD20-0015
RUMBLE STRIP CYLINDRICAL
ASPHALT
LF
3,941.000
0240 315SD20-0016
LIQUID ASPHALT COATING
(RUMBLE STRIP)
SY
578.000
0250 315SX20-0011
SAW-CUT ASPH CONC NS
SAW-CUT ASPH CONC (FULL
DEPTH)
LF
6,100.000
0260 402SX20-0002
TEMP SUPPORT OF
EXCAVATION ..
LUMP SUM _________._____LUMP SUM
ATTD
Schedule of Items Page: 4
Proposal ID: C0000119463C01 0220-033-858,M501
Order No.: K69
Oversight/State Project No.:
Federal Project No.: STP-033-2(065)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0270 501SD20-0004
UNDERDRAIN UD-4 LF
55.000
0280 502SD20-0053
MEDIAN STRIP MS-1 SY
296.000
0290 502SD20-0056
MEDIAN STRIP MS-1A SY
400.000
0300 502SX20-0006
PAVED DITCH MOD. PG-2A SY
570.000
0310 505SD20-0009
REMOVE EX. GUARDRAIL
TERMINAL
EA
2.000
0320 505SD20-0011
GUARDRAIL GR-MGS1 LF
288.000
0330 505SD20-0013
GUARDRAIL GR-MGS1, 9'
POST
LF
725.000
0340 505SD20-0017
GUARDRAIL TERMINAL GR-
MGS2
EA
1.000
0350 505SD20-0019
GUARDRAIL HEIGHT
TRANSITION GR-MGS4
EA
3.000
0360 505SD20-0059
MEDIAN BARRIER MB-3 LF
50.000
0370 505SD20-0073
REMOVE EXISTING
GUARDRAIL
LF
453.000
0380 505SX20-0044
SP. DES. GR.BR.ATTACH BR-
GR BR-GR-12A
EA
1.000
ATTD
0390 505SX20-0044
SP. DES. GR.BR.ATTACH BR-
GR BR-GR-3D
EA
1.000
ATTD
Schedule of Items Page: 5
Proposal ID: C0000119463C01 0220-033-858,M501
Order No.: K69
Oversight/State Project No.:
Federal Project No.: STP-033-2(065)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0400 505SX20-0058
GUARDRAIL MEDIAN
BARRIER TERMINAL GR-9
EA
1.000
0410 508SD20-0004
DEMO. OF PAVEMENT
FLEXIBLE
SY
2,501.000
0420 511SD20-0001
ALLAYING DUST HR
800.000
0430 512SD20-0003
TRAFFIC BARRIER SERVICE
MB-11A
LF
3,316.000
0440 512SD20-0007
IMPACT ATTEN.SER. TY. 1 TL-
3, >=40 MPH
EA
3.000
0450 512SD20-0013
TYPE 3 BARRICADE 8' EA
2.000
0460 512SD20-0014
TEMPORARY SIGN SF
1,200.000
0470 512SD20-0023
TRUCK MOUNTED
ATTENUATOR
HR
960.000
0480 512SD20-0024
GROUP 2 CHANNELIZING
DEVICES
DAY
16,575.000
0490 512SD20-0025
PORT.CHANGEABLE MESS.
SIGN
HR
1,344.000
0500 512SD20-0026
ELECTRONIC ARROW BOARD HR
10,800.000
0510 512SD20-0027
FLAGGER SERVICE HR
360.000
0520 512SD20-0029
WARNING LIGHT TY. B DAY
540.000
Schedule of Items Page: 6
Proposal ID: C0000119463C01 0220-033-858,M501
Order No.: K69
Oversight/State Project No.:
Federal Project No.: STP-033-2(065)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0530 512SD20-0042
ERADICATE LINEAR PVMT
MRKG
LF
5,844.000
0540 512SD20-0044
TEMP. PAVE. MARKER 1 WAY EA
168.000
0550 512SD20-0046
TEMP. PVMT MRKG TY. A, 4" LF
6,080.000
0560 512SD20-0062
TEMP. PVMT MRKG TY. D, CL.
III, 6"
LF
6,874.000
0570 512SD20-0063
TEMP. PVMT MRKG TY. D, CL.
III, 8"
LF
3,550.000
0580 513SD20-0001
MOBILIZATION LUMP SUM _________._____LUMP SUM
0590 514SD20-0001
FIELD OFFICE TY.I MO
9.000
0600 515SD20-0005
FLEXIBLE PAVE. PLANING
ABOVE 2"-4"
SY
8,915.000
0610 517SD20-0001
CONSTRUCTION SURVEYING
CONSTR.
LUMP SUM _________._____LUMP SUM
0620 602SD20-0003
TOPSOIL CLASS B 2" ACRE
0.042
0630 603SD20-0002
TEMPORARY SEED LB
11.000
0640 603SD20-0003
REGULAR SEED LB
13.000
0650 603SD20-0004
OVERSEEDING LB
10.000
Schedule of Items Page: 7
Proposal ID: C0000119463C01 0220-033-858,M501
Order No.: K69
Oversight/State Project No.:
Federal Project No.: STP-033-2(065)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0660 603SD20-0005
LEGUME SEED LB
1.000
0670 603SD20-0006
LEGUME OVERSEEDING LB
1.000
0680 603SD20-0008
HYDRAULIC EROSION
CONTROL PRODUCT TYPE 2
SY
254.000
0690 603SD20-0009
HYDRAULIC EROSION
CONTROL PRODUCT TYPE 3
SY
203.000
0700 603SD20-0014
FERTILIZER NITROGEN - N LB
6.000
0710 603SD20-0015
FERTILIZER PHOSPHOROUS
- P
LB
3.000
0720 603SD20-0016
FERTILIZER POTASSIUM - K LB
3.000
0730 603SD20-0017
LIME TON
0.230
0740 700SD20-0007
REMOVE EXISTING 1 POST
SIGN PANEL
EA
7.000
0750 700SD20-0012
RELOCATE EX. 1 POST GRND
MOUNT SGN PANEL
EA
4.000
0760 700SD20-0037
SIGN POST STP-1, 2 1/2", 12
GAUGE
LF
237.500
0770 700SD20-0038
CONC. FOUND. STP-1, TY. A EA
19.000
0780 701SD20-0001
SIGN PANEL SF
146.000
Schedule of Items Page: 8
Proposal ID: C0000119463C01 0220-033-858,M501
Order No.: K69
Oversight/State Project No.:
Federal Project No.: STP-033-2(065)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0790 702SD20-0011
FLEXIBLE POST
DELINEATOR, SURFACE
MOUNT
EA
14.000
0800 704SD20-0006
TYPE B CLASS I PVMT LINE
MRKG 4"
LF
146.000
0810 704SD20-0007
TYPE B CLASS I PVMT LINE
MRKG 6"
LF
8,383.000
0820 704SD20-0010
TYPE B CLASS I PVMT LINE
MRKG 24"
LF
114.000
0830 704SD20-0032
INLAID PAVEMENT MARKER
ASPHALT
EA
44.000
ATTD
0840 704SD20-0045
PVMT SYMB MRKG THRU
ARROW TY B, CL II
EA
1.000
0850 704SD20-0048
PVMT SYMB MRKG SGL
TURN ARR. TY B CL II
EA
4.000
0860 704SD20-0060
SYMB MRKG LANE
REDUCTION ARR TY B CL II
EA
2.000
0870 704SD20-0061
SYMB MRKG WRONG-WAY
ARROW TY A
EA
2.000
0880 704SD20-0063
SYMB MRKG WRONG-WAY
ARROW TY B CL II
EA
2.000
0890 704SP20-0001
REMOVAL OF SRPM EA
40.000
Section: 0001 _________._____Total:
Total Bid: _________._____
Page
Bid Items Eligible For Fuel Adjustment
C0000119463C01
K69
Contract ID:
Order No.:
Instructions: This form shall be completed in accordance with the Special Provision for Optional Adjustment for Fuel. If you choose to have Fuel Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.
FORM C-21B
Rev 12-21-05
0001 REGULAR BID ITEMSSECTION:
ltem Description Fuel Factor gal/unit Option Item
Number
_______BORROW EXCAVATION 0.290303SD20-
_______SILTATION CONTROL EXCAVATION 0.290303SD20-
_______AGGR. BASE MATL. TY. I NO. 21B 0.600308SD20-
_______CRUSHER RUN AGGR. NO. 25 OR 26 0.400308SX20-
_______ASPHALT CONCRETE TY. IM-19.0D CONST 3.500315SD20-
_______ASPHALT CONCRETE TY. SM-9.5D CONST 3.500315SD20-
_______ASPHALT CONCRETE TY. BM-25.0D CONST 3.500315SD20-
_______DEMO. OF PAVEMENT FLEXIBLE 0.200508SD20-
_______FLEXIBLE PAVE. PLANING ABOVE 2"-4" 0.160515SD20-
Date:
Signature:
(Firm or Corporation)
(Vendor No.)
Bid Items Eligible For Steel Price Adjustment
C0000119463C01
K69
Contract ID:
Order No.:
Instructions: This form shall be completed in accordance with the Special Provision. If you choose to have Steel Price Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.
Rev 12-21-08
FORM C-21C
0001 REGULAR BID ITEMSSECTION:
ltem Description Option Item
Number
_______GUARDRAIL GR-MGS1505SD20-
_______GUARDRAIL GR-MGS1, 9' POST505SD20-
_______GUARDRAIL TERMINAL GR-MGS2505SD20-
_______GUARDRAIL HEIGHT TRANSITION GR-MGS4505SD20-
_______MEDIAN BARRIER MB-3505SD20-
_______SIGN POST STP-1, 2 1/2", 12 GAUGE700SD20-
Date:
Signature:
(Firm or Corporation)
(Vendor No.)
Bid Items Eligible For Asphalt Adjustment within this Project
C0000119463C01
K69
Contract ID:
Order No.:
0001 REGULAR BID ITEMSSECTION:
ltem Description Item
Number
ASPHALT CONCRETE TY. IM-19.0D CONST315SD20-0005
ASPHALT CONCRETE TY. SM-9.5D CONST315SD20-0008
ASPHALT CONCRETE TY. BM-25.0D CONST315SD20-0011
LIQUID ASPHALT COATING (RUMBLE STRIP)315SD20-0016
Determination of Major Items
1C0000119463C01Contract ID:
ltem Description Item
Number
ASPHALT CONCRETE TY. BM-25.0D CONST315SD20-0011
ASPHALT CONCRETE TY. SM-9.5D CONST315SD20-0008
TRAFFIC BARRIER SERVICE MB-11A512SD20-0003
MEDIAN STRIP MS-1A502SD20-0056
Form C-111
Rev. 2-15-11
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
MINIMUM DBE REQUIREMENTS
PROJECT NO: 0220-033-858,M501
FHWA NO: STP-033-2(065)
* * * I N S T R U C T I O N S * * *
THIS FORM CAN BE USED BY THE CONTRACTOR TO SUBMIT THE NAMES OF DBE FIRMS TO BE UTILIZED ON THE PROJECT. THE CONTRACTOR SHALL INDICATE THE DESCRIPTION OF THE CATEGORY (S, M, SP or H) AND THE TYPE OF WORK THAT EACH DBE WILL PERFORM AND THE ALLOWABLE CREDIT PER ITEM(S). ADDITIONAL SHEETS TO SHOW THE ALLOWABLE CREDIT PER ITEM MAY BE ATTACHED IF NECESSARY. PLEASE NOTE: THE AMOUNT OF ALLOWABLE CREDIT FOR A DBE SUPPLIER IS 60% OF THE TOTAL COST OF THE MATERIALS OR SUPPLIES OBTAINED AND 100% FOR A DBE MANUFACTURER OF THE MATERIALS AND SUPPLIES OBTAINED. A CONTRACTOR MAY COUNT 100% OF THE FEES PAID TO A DBE HAULER FOR THE DELIVERY OF MATERIALS AND SUPPLIES TO THE PROJECT SITE, BUT NOT FOR THE COST
OF THE MATERIALS AND SUPPLIES THEMSELVES.
SECTION I:
DBE REQUIREMENT 6.00%
SECTION II:
PERCENT ATTAINED BY BIDDER %
NAME(s) AND CERTIFICATION NO. OF DBE(s) TO BE USED
USED AS
SUBCONTR. (S)
MFG. (M)
SUPPLIER (SP)
HAULER (H)
TYPE OF WORK & ITEM
NO(s)
AMT. OF
ALLOWABLE
CREDIT PER
ITEM
TOTAL: $
Total Contract Value $ X Required DBE % =$
I/WE CERTIFY THAT THE PROPOSED DBE (S) SUBMITTED WILL BE USED ON THIS CONTRACT AS
STATED HEREON AND ASSURE THAT DURING THE LIFE OF THE CONTRACT, I/WE WILL MEET OR
EXCEED THE PARTICIPATION ESTABLISHED HEREON BY THE DEPARTMENT.
By
BIDDER SIGNATURE
By
TITLE DATE
Form C-112 Rev. 3-1-11
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
CERTIFICATION OF BINDING AGREEMENT WITH
DISADVANTAGED BUSINESS ENTERPRISE FIRMS
Project No.: 0220-033-858,M501
FHWA NO: STP-033-2(065)
This form is to be submitted in accordance with the Department’s Special Provision for Section 107.15.
It is hereby certified by the below signed Contractors that there exists a written quote, acceptable to the parties involved preliminary to a binding subcontract agreement stating the details concerning the work to be performed and the price which will be paid for the aforementioned work. This document is not intended to, nor should it be construed to, contain the entire text of the agreement between the contracting parties.
This document does not take the place of, nor may it be substituted for, an official subcontracting agreement in those situations that may require such an agreement. A copy of the fully executed subcontract agreement shall be submitted to the Engineer within fourteen (14) working days after contract execution.
It is further certified that the aforementioned mutually acceptable quote and fully executed subcontract agreement represent the entire agreement between the two parties involved and that no conversations, verbal agreements, or other forms of non-written representations shall serve to add to, delete, or modify the terms as stated.
The prime Contractor further represents that the aforementioned mutually acceptable quote and fully executed subcontract agreement shall remain on file for a period of not less than one year following completion of the prime's contract with the Department or for such longer period as provisions of governing Federal or State law or regulations may require. For purposes of this form, the term Prime Contractor shall refer to any Contractor utilizing a DBE subcontractor, regardless of tier, in which they are claiming DBE credit toward the contract goal.
Contractors further jointly and severally represent that said binding agreement is for the performance of a "commercially useful function" as that term is employed in 49 C.F.R. Part 26.55 (c), (d).
TO BE SIGNED BY THE SUBCONTRACTOR TO THE PRIME CONTRACTOR, AND ANY LOWER TIER
SUBCONTRACTORS HAVING A CONTRACT WITH THE BELOW NAMED DBE FIRM
Prime Contractor:
By:
Signature Title
Date:
First Tier Subcontractor If Applicable:
By:
Signature Title
Date:
Second Tier Subcontractor If Applicable:
By:
Signature Title
Date:
Third Tier Subcontractor If Applicable
By:
Signature Title
Date:
DBE Contractor
By:
Signature Title
Date:
FORMS and SCHEDULE OF ITEMS PRECEDE SPCNs, SPs and SUPPLEMENTAL SPECS.
*CN100-000026-08 GEN. PROJ. REQUIRE., SSS/SPS/SPCNS 4-4-22 (SPCN) 1
CN303-000100-00 AGGREGATE MATERIAL R-7-12-16 (SPCN) 1
CN315-000100-00 SEC. 315.05(C) PLACING AND FINISHING 1-18-17 (SPCN) 2
*CN505-000100-01 IMPACT ATTENUATOR 1-24-19_(SPCN) 2
CN512-000100-00 TABLE V-1, ADT GROUPS 7-12-16 (SPCN) 4
CN704-000200-00 INLAID PAVE. MARKER LOC. AND SPACING 8-11-21 (SPCN) 4
CRUSHER RUN AGGREGATE NO. 25 OR 26 8-10-20 (SPCN) 4
TEMPORARY SUPPORT OF EXCAVATION 10-10-23 (SPCN) 5
*DRUG-FREE WORKPLACE 7-3-19 (SPCN) 6
CQ107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY 5-11-22 6
*SEALING RUMBLE STRIPS IN NEW PAVEMENT 8-29-19 (SPCN) 7
CQ512-000321-00 CONTRACTOR MAINT. OF TEMP. MARKINGS 6-13-17 (SPCN) 7
SP0F0-000100-00 PREDETERMINED MIN. WAGE RATES R-7-12-16 8
SP0F0-000130-02 FHWA 1273—REQ. PROVISIONS, FED-AID 10-3-23 15
SP0F0-000150-01 AFFIRMATIVE ACTION / EEO NOTICE 7-17-17 41
SP102-000120-00 NON-DISCRIMIN. EMPLOY. & CONTRACT. PRACTICES (EO-61) 1-10-17 47
*SP102-000510-02 USE OF DOMESTIC MATERIAL 12-19-18 48
SP107-000110-00 C-45–SWPPP GEN. PERMIT–CONTRACTOR CERTIFICATION R-10-27-16 50
*SP107-000120-00 ELEC. SUBMISSION OF DBE AND PAYROLLS 1-21/20 51
SP107-001510-02 SEC. 107.15 (DBES) 8-18-17 53
*SP107-003000-01 BUILD AMERICA, BUY AMERICA ACT REQS FOR CONSTR MTLS 6-8-23 71
SP108-000110-01 PROG. SCHED. FOR CAT. II PROJECTS 3-21-22 73
*SP109-000100-04 ASPHALT MATERIAL PRICE ADJUSTMENT 6-29-23 91
SP109-000110-00 OPTIONAL ADJUSTMENT FOR FUEL R-7-12-16 92
SP109-000120-01* PRICE ADJUSTMENT FOR STEEL 7-2-19 94
SP109-000130-00 ELECTRONIC WEIGH TICKETS 10-10-19 99
SP505-000100-00 REPLACE G’RAIL, MED. BARRIER & G’RAIL TO BRIDGE 8-4-16 101
SP522-000130-02 TREE REMOVAL TIME OF YEAR RESTRICTION 6-6-22 107
*SP704-000120-00 INLAID PAVEMENT MARKERS 8-26-19 108
SP801-000100-01 LANE CLOSE COORD (LCC)/LANE CLOSE IMPLEMENT (LCI) 9-20-17 111
SEC. 105.06—SUBCONTRACTING (FEDERAL FUNDED PROJECTS) 2-9-17_(SP) 113
SQ107-001300-00 PREVAILING WAGE RATES 10-12-2023 114
SS109-002020-01 SEC. 109—MEASUREMENT AND PAYMENT 5-1-23 118
*SS211-002020-02 SECT 211 – ASPHALT CONCRETE 5-15-23 121
*SS220-002020-01 SEC. 220 – CONCRETE CURING MATERIALS 8-28-20 126
SECTION 223 – STEEL REINFORCEMENT 04/04/2023 127
*SS234-002020-01 SECTION 234 – GLASS BEADS AND RETROREFLECTIVE OPTICS 5-6-22 128
*SS235-002020-01 SECTION 235 – RETROREFLECTORS 5-6-22 129
SS236-002020-01 SECTION 236 – WOOD PRODUCTS 5-14-21 130
*SS246-002020-02 SECTION 246 – PAVEMENT MARKING 5-6-22 134
SECTION 248 – STONE MATRIX ASPHALT CONCRETE 5-26-23 142
SS315-002020-04 SECTION 315 – ASPHALT CONCRETE PLACEMENT 6-16-23 143
SS321-002020-02 SECTION 321 – TRENCH WIDENING 4-4-23 160
*SS407-002020-02 SEC. 407 – STEEL & METAL STRUCT 11-01-22 162
*SS411-002020-01 SEC. 411 – PROT. COAT. OF METAL 11-01-22 164
*SS512-002020-03 SECTION 512 – MAINTAINING TRAFFIC 7-1-22 165
*SS704-002020-02 SECTION 704 – PAVEMENT MARKINGS AND MARKERS 5-6-22 179
SECTION 108.02— LIMITATION OF OPERATION 8-28-23 185
SECTION 105.08 – COOPERATION WITH REGARD TO UTILITIES 10-11-23 187
INSPECT, REMOVE, & RETROREFLECTOR REPLACE FOR EXISTING SRPM 10-10-19 189
TABLE OF CONTENTS FOR PROVISIONS
cn100-000026-08 GENERAL PROJECT REQUIREMENTS, SUPPLEMENTAL SPECIFICATIONS
(SSs), SPECIAL PROVISIONS (SPs) AND SPECIAL PROVISION COPIED NOTES (SPCNs)
This project shall be constructed according to: the plans; the Virginia Department of Transportation Road and Bridge Specifications, dated 2020 and the Supplement thereto, dated 2022; the Virginia Department of Transportation Road and Bridge Standards, dated 2016, with revisions issued online as of the advertisement date for this project incorporated; the 2011 edition of the Virginia Work Area Protection Manual with Revision Number 2.1 incorporated, dated November 1, 2020; the 2009 edition of the MUTCD with Revision Numbers 1 and 2 incorporated, dated May 2012; and the 2011 edition of the Virginia Supplement to the MUTCD with Revision Number 1 dated September 30, 2013; and the Supplemental Specifications, Special Provisions and Special Provision Copied Notes in this contract. The status in the Contract of each of these documents will be according to Section 105.12 of the Specifications.
Special Provision Copied Notes in this contract are designated with “(SPCN)” after the date.
The information at the top and left of each Special Provision Copied Note in this contract is file reference information for Department use only. The information in the upper left corner above the title of each Supplemental Specification and Special Provision in this contract is file reference information for Department use only.
4-4-22 (SPCN)
cn303-000100-00 AGGREGATE MATERIAL shall be the size specified conforming to Section 203 of the Specifications. The aggregate shall be placed at locations shown on the plans or as directed by the Engineer. Aggregate material will be measured in units of tons for the size specified according to Section 109 of the Specifications. Payment will be made at the contract unit price per ton, which bid price shall be full compensation for furnishing, placing, and shaping and compaction, if required.
Payment will be made under:
Pay Item
Pay Unit
Aggregate Material (Size) Ton
5-23-95c; Reissued 7-12-16 (SPCN) https://outsidevdot.cov.virginia.gov/P0JQP/2016_Standard_Specifications/cn303-000100-00.docx cn315-000100-00 SECTION 315.05(c) PLACING AND FINISHING is modified by replacing the third paragraph with the following:
The longitudinal joint in one layer shall offset that in the layer immediately below by approximately 6 inches or more. The joint in the wearing surface shall be offset 6 inches to 12 inches from the centerline of the pavement if the roadway comprises two traffic lanes. The joint shall be offset approximately 6 inches from the lane lines if the roadway is more than two lanes in width. The longitudinal joint shall be uniform in appearance. On all roads except secondary routes, if the offset for the longitudinal joint varies from a straight line more than 2 inches in 50 feet on tangent alignment, or from a true arc more than 2 inches in 50 feet on curved alignment, the Contractor shall seal the joint using a water-proof sealer at no cost to the Department. The Contractor shall recommend a sealant and installation procedure to the Engineer for approval before proceeding. On all roads except secondary routes, if the offset for the longitudinal joint varies from a straight line more than 3 inches in 50 feet on tangent alignment, or from a true arc more than 3 inches in 50 feet on curved alignment, the Engineer may reject the paving. The Engineer will not require offsetting layers when adjoining lanes are paved in echelon and the rolling of both lanes occurs within 15 minutes after laydown.
1-18-17 (SPCN)
cn505-000100-01 IMPACT ATTENUATOR — This work shall consist of replacing damaged impact attenuators, or installing new, by furnishing and installing impact attenuators in accordance with Section 505 of the Specifications and as directed by the Engineer.
Replacement impact attenuators shall be a Type I (Re-Directive Low-
Maintenance) as designated on VDOT’s MASH Provisionally Approved Products
List. Impact attenuators shall be installed in accordance with the manufacturer's specifications and instructions, Standard Drawing IA-LM, and Section 505 of the
Specifications.
If replacing an existing impact attenuator, the Contractor shall inspect the condition of the existing impact attenuator foundation pad for size, thickness, adequacy of reinforcement, slope, cracking, surface wear, shifting, undermining, settling, or other signs of age or deterioration which may be unsuitable for continued use. If any of these conditions are present, the Contractor shall notify the Engineer and request authorization prior to replacing the existing foundation pad.
If the existing foundation pad is suitable for continued use and existing bolt patterns are present, the Contractor shall confirm that installing new bolts will not negatively impact performance of the unit.
Anchor bolts shall be set into holes drilled with rotary impact drills of the sizes recommended by the manufacturer of the attenuator, and as approved by the Engineer. Bolt holes shall be cleaned with a bottle brush before installing the anchor bolts.
The Type I (Re-Directive Low-Maintenance) Impact Attenuator shall be bolted in place according to the attenuator manufacturer’s instructions, but not before the fresh concrete foundation, if applicable, has reached 28-day strength, determined in accordance with Section 217 of the Specifications.
If a transition is required, the appropriate manufacturer’s standard transition shall be used.
https://outsidevdot.cov.virginia.gov/P0JQP/2016_Standard_Specifications/cn315-000100-00.docx https://outsidevdot.cov.virginia.gov/P0JQP/2016_Standard_Specifications/cn505-000100-01.docx
The work site shall be protected according to Section 512 of the Specifications and the VWAPM.
Installers and repair personnel shall be certified by the manufacturer. The Contractor shall submit two copies of the manufacturers’ installation instructions to the Engineer prior to beginning work.
The Contractor shall provide one training session to VDOT personnel at a location selected by the Engineer within the VDOT District where the impact attenuators were installed, when designated as a pay item. The training sessions shall be conducted by a manufacturer’s representative and cover impact attenuator maintenance and repair. The Department may add additional training sessions to be paid for at the unit price bid. Each session shall be structured such that the personnel trained will be able to perform maintenance and repair beginning within one year of the training.
The Contractor shall provide documentation tracing the steel in the finished product back to raw material in accordance with Buy America requirements.
Impact attenuator will be measured in units of each and will be paid for at the
Contract Each price. This price shall include furnishing and installing pad, impact attenuator, and transitions.
Remove existing impact attenuator will be measured and paid for as remove existing guardrail terminal in accordance with Section 505 of the Specifications.
This price shall include removing and disposing of existing impact attenuator.
Site Preparation will be measured and paid for as Guardrail terminal site preparation in accordance with Section 505 of the Specifications.
Maintenance and Repair Training will be measured in units of each and will be paid for at the Contract each price.
Pay Item Pay Unit
Impact attenuator (Type, Speed) Each
Maintenance and Repair Training Each
1-24-19_(SPCN)
cn512-000100-00 TABLE V-1, ADT GROUPS — The Specifications are amended to include the following table:
TABLE V-1
Average Daily Traffic (ADT) Groups
Traffic Group ADT Traffic Group ADT
I 0-9 X 2,000-2,999
II 10-24 XI 3,000-3,999
III 25-49 XII 4,000-4,999
IV 50-99 XIII 5,000-5,999
V 100-249 XIV 6,000-9,999
VI 250-399 XV 10,000-14,999
VII 400-749 XVI 15,000-19,999
VIII 750-999 XVII 20,000-29,999
IX 1,000-1,999 XVIII 30,000-39,999
XIX 40,000 & over
7-12-16 (SPCN)
cn704-000200-00 INLAID PAVEMENT MARKER LOCATION AND SPACING — The Contractor shall not install markers on existing bridge decks Inlaid Pavement Markers shall be installed on new bridge decks where required by the Plans. Inlaid Pavement Markers shall be placed in relation to pavement joints and cracks as follows:
• In existing Asphalt Concrete pavement, new or existing Hydraulic Cement Concrete pavement, and bridge decks, the edge of the groove shall be at least 2 inches from pavement joints and cracks, ensuring that the finished line of markers is straight in accordance with the tolerance for pavement markings specified in Section 704.03 of the Specifications. Offset from the longitudinal joint shall take precedence over straightness of the line of markers.
• In new Hydraulic Cement Concrete pavement or when installed in conjunction with new latex modified microsurfacing or slurry seal treatments, the edge of the groove shall be 2 inches minimum from the surface course pavement joint and 1 inch maximum off alignment from the corresponding pavement marking line. The finished line of markers shall be straight in accordance with the tolerance for pavement markings specified in Section 704.03 of the Specifications. Straightness of the line of markers and alignment with the corresponding pavement marking line takes precedence over offset from the surface course joint. 8-11-21
CRUSHER RUN AGGREGATE NO. 25 OR 26 shall conform to Section 205 of the Specifications and shall be placed at locations shown on the Plans or as directed by the Engineer. Crusher run aggregate No. 25 or
26 will be measured in tons and will be paid for at the Contract ton price. This price shall include furnishing, placing, and compacting.
Crusher run aggregate No. 25 or 26 Ton
8-10-20 (SPCN)
https://outsidevdot.cov.virginia.gov/P0JQP/2016_Standard_Specifications/cn512-000100-00.docx https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2020_Standard_Specifications/cn704-000200-00.docx
TEMPORARY SUPPORT OF EXCAVATION—The Contractor shall determine the methods and means of support required for all loads imposed, including but not limited to the roadway, traffic, traffic barrier, the structure, and loads imposed by construction equipment during the construction of the project.
The approximate limits of temporary support excavation shown on the Plans are for informational purposes only. The Contractor shall be responsible for determining the actual limits and quantities of temporary support excavation.
The Contractor shall prepare and submit working drawings to the Engineer for review 30 days prior to installation in accordance with the requirements of Section 105.10 of the Specifications. The working drawings shall include the plan and profile views, details of sheet piling, walers, rakes, connections, welds, fasteners, all structural members, soldier pile, tiebacks, or other means of support, shall convey how temporary support of excavation will be used during all phases of construction, and shall be prepared stamped, and signed by a Professional Engineer licensed to practice in the Commonwealth of Virginia.
The Department’s review and approval of the Contractor’s working drawings in no way relieves the Contractor of the responsibility of providing quality workmanship on this project, while the roadway is open or closed to the traveling public.
Temporary support of excavation will be paid for at the Contract lump sum price. This price shall include designing, furnishing, installing, and removing temporary support of excavation, excavation, backfill, removing and disposing of surplus material, all materials, equipment, tools, labor, and incidentals necessary to complete the work.
Temporary support of excavation Lump sum
10-10-23 (SPCN)
DRUG-FREE WORKPLACE– The Contractor shall:
• Provide a Drug-Free Workplace for the Contractor’s employees.
• Post in conspicuous places, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the Contractor’s workplace and specifying the actions that will be taken against employees for violations of such prohibition.
• State in all solicitations or advertisements for employees placed by or on behalf of the Contractor that the Contractor maintains a Drug-Free Workplace.
• Include the provisions of the foregoing clauses in every Subcontract or purchase order of over $10,000, so that the provisions will be binding upon each Subcontractor or vendor.
For the purposes of this provision, “Drug-Free Workplace” means a site for the performance of work done in connection with the Contract. The Contractors employees, and those of his Subcontractors, shall be prohibited from engaging in the unlawful manufacture, sale, distribution, dispensation, possession, or use of any controlled substance or marijuana during the performance of the Work.
7-3-19 (SPCN)
cq107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY
Section 107.14(a)1 – Required by §2.2-4201 and §2.2-4311 of the Code of Virginia is replaced with the following:
1. Required by §2.2-4201 and §2.2-4311 of the Code of Virginia: During the performance of this Contract, the Contractor agrees as follows:
a. The Contractor shall not discriminate against any employee or applicant for employment because of race, religion, color, sex, or national origin, age, disability, or other basis prohibited by state law relating to discrimination in employment, except where religion, sex, or national origin is a bona fide occupational qualification reasonably necessary to the normal operation of the Contractor. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause, including the names of all contracting agencies with which the Contractor has contracts of over $10,000.
b. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that such contractor is an equal opportunity employer. However, notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this chapter.
c. If the Contractor employs more than five employees, the Contractor shall (i) provide annual training on the Contractor's sexual harassment policy to all supervisors and employees providing services in the Commonwealth, except such supervisors or employees that are required to complete sexual harassment training provided by the Department of Human Resource Management, and (ii) post the Contractor's sexual harassment policy in (a) a conspicuous public place in each building located in the Commonwealth that the Contractor owns or leases for business purposes and (b) the Contractor's employee handbook.
The Contractor shall include the provisions of subdivisions a, b, and c in every subcontract or purchase order of over $10,000, so that such provisions shall be binding upon each subcontractor or vendor.
Nothing contained in this chapter shall be deemed to empower any agency to require any contractor to grant preferential treatment to, or discriminate against, any individual or any group because of race, color, religion, sex, or national origin on account of an imbalance that may exist with respect to the total number or percentage of persons of any race, color, religion, sex, or national origin employed by such contractor in comparison with the total number or percentage of persons of such race, color, religion, sex, or national origin in any community or in the Commonwealth.
5-11-22 (SPCN)
SEALING RUMBLE STRIPS IN NEW PAVEMENT – Rumble strips cut into new pavement shall be coated with liquid asphalt coating (emulsion) conforming to Section 315.02(e) of the Specifications. The coating process shall conform to Section 315.05(g) of the Specifications.
8-29-19 (SPCN)
CONTRACTOR MAINTENANCE OF TEMPORARY MARKINGS – The second, third, and fourth paragraphs of Section 512.03(k)3 of the Specifications will also apply to Sections 512.03(k)1 and 512.03(k)2 of the Specifications.
6-13-17 (SPCN)
SP0F0-000100-00
Reissued July 12, 2016
PREDETERMINED MINIMUM WAGE RATES
"General Decision Number: VA20230120 01/06/2023
Superseded General Decision Number: VA20220120
State: Virginia
Construction Type: Highway
County: Franklin County in Virginia.
HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction;
bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction;
and other major bridges).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 |
|into on or after January 30, | generally applies to the |
|2022, or the contract is | contract. |
|renewed or extended (e.g., an |. The contractor must pay |
|option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $16.20 per hour (or |
| | the applicable wage rate |
| | listed on this wage |
| | determination, if it is |
| | higher) for all hours |
| | spent performing on the |
| | contract in 2023. |
|If the contract was awarded on|. Executive Order 13658 |
|or between January 1, 2015 and| generally applies to the |
|January 29, 2022, and the | contract. |
|contract is not renewed or |. The contractor must pay all| https://outsidevdot.cov.virginia.gov/P0JQP/2016_Standard_Specifications/SP0F0-000100-00.docx
|extended on or after January | covered workers at least |
|30, 2022: | $12.15 per hour (or the |
| | applicable wage rate listed|
| | on this wage determination,|
| | if it is higher) for all |
| | hours spent performing on |
| | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the
Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/06/2023
ELEC0080-011 12/01/2021
Rates Fringes
ELECTRICIAN, Includes Traffic
Signalization....................$ 30.55 11.51
SUVA2016-056 07/02/2018
Rates Fringes
CARPENTER, Includes Form Work....$ 17.65 0.00
CEMENT MASON/CONCRETE FINISHER...$ 19.94 0.00
IRONWORKER, REINFORCING..........$ 22.71 0.00
IRONWORKER, STRUCTURAL...........$ 27.38 0.00
LABORER: Asphalt, Includes
Raker, Shoveler, Spreader and
Distributor......................$ 15.40 ** 0.00
LABORER: Common or General......$ 14.58 ** 0.00
LABORER: Grade Checker..........$ 15.07 ** 0.00
LABORER: Pipelayer..............$ 13.14 ** 0.00
LABORER: Power Tool Operator....$ 15.69 ** 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 16.44 0.00
OPERATOR: Bobcat/Skid
Steer/Skid Loader................$ 19.16 4.45
OPERATOR: Broom/Sweeper.........$ 14.32 ** 0.25
OPERATOR: Crane.................$ 25.82 0.00
OPERATOR: Drill.................$ 24.66 0.00
OPERATOR: Gradall...............$ 18.65 0.00
OPERATOR: Grader/Blade..........$ 26.13 0.00
OPERATOR: Hydroseeder...........$ 16.64 0.00
OPERATOR: Loader................$ 15.86 ** 0.00
OPERATOR: Mechanic..............$ 20.00 0.00
OPERATOR: Milling Machine.......$ 23.12 3.60
OPERATOR: PAVEMENT PLANER.......$ 17.01 0.00
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 16.79 0.00
OPERATOR: Piledriver............$ 21.83 4.08
OPERATOR: Roller (Finishing)....$ 14.31 ** 0.00
OPERATOR: Roller................$ 14.81 ** 0.00
OPERATOR: Screed................$ 22.13 4.89
OPERATOR: Asphalt Spreader and Distributor..................$ 16.44 0.00
OPERATOR: Bulldozer, Including Utility................$ 17.81 0.00
TRAFFIC CONTROL: Flagger.......$ 11.84 ** 0.00
TRUCK DRIVER : HEAVY 7CY &
UNDER............................$ 15.36 ** 0.00
TRUCK DRIVER: 1/Single Axle
Truck............................$ 15.95 ** 0.00
TRUCK DRIVER: Fuel and
Lubricant Service................$ 18.25 0.00
TRUCK DRIVER: HEAVY OVER 7
CY...............................$ 16.60 0.00
TRUCK DRIVER: MULTI AXLE........$ 17.81 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658
($12.15). Please see the Note at the top of the wage determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or
""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A…