Justification FAR Part 13 (JandA) 1_Redacted (1).pdf
PDF 402 KB Posted
- Attached to
- Rename Signs Lee
- Solicitation number
- W91QF525CA027
About this file
This is a FAR Part 13 Justification and Approval document for simplified procedures for certain commercial items related to sign installation and services at Fort Lee, Virginia. The procurement involves providing skills, knowledge, and materials to install new lettering and back panels on various signs throughout the installation, including 7 gate entry signs, 14 entry requirements signs, 5 primary building signs, 1 secondary building sign, 12 standard street signs, 5 overhead street signs, and 1 ceremonial sign for Lee Avenue.
The requirement stems from a Department of Defense directive to redesignate Fort Gregg-Adams back to Fort Lee, effective June 11, 2025, in honor of Medal of Honor recipient Private Fitz Lee. The procurement is being conducted as a sole source acquisition under FAR 13.501(a)(1)(ii) due to the urgent timeline mandated by FRAGO 1 to HQDA EXORD 154-25, which requires implementation no later than August 31, 2025. The requiring activity is the Directorate of Public Works Operations & Maintenance Division at Fort Lee, while the contracting activity is the Mission Installation Contracting Command-Fort Lee. The document indicates this is a new requirement with no procurement history, and the total cost includes options per FAR 52.217-8. Market research was conducted based on material values and previous redesignation processes to align with current costs.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI//SP-PROCURE//FEDCON
Control Number:
CUI//SP-PROCURE//FEDCON
JUNE 2025
FAR Part 13 Justification and Approval Simplified Procedures for Certain Commercial Items
1. Requiring Activity: Directorate of Public Works Operations & Maintenance Division
– Facilities Structures Branch, 825 19th Street Fort Lee, VA 23801
2. Contracting Activity: Mission Installation Contracting Command-Fort Lee of 1830 Quartermaster Road, Building 7124 Fort Lee, VA, 23801-1606.
3. Description of Action: Fort Lee DPW has been tasked with the renaming of the Fort. Signs are required to be changed from Fort Gregg-Adams to Fort Lee. This is required per the HQ Department of the Army for redesignation to Fort Lee Effective June 11 2025.
4. Description of Supplies/Services: Provide skills, knowledge and materials to install new lettering and back panels on (7) gate entry signs, (14) entry requirements signs, (5) primary building signs, (1) secondary building sign, (12) standard street signs,
(5) overhead street signs, and (1) Ceremonial sign for the naming of Lee Ave.
5. Authority Cited: Title 41 U.S.C. §1901(e)(2) as implemented in FAR 13.501(a)(1)(ii), sole source (including brand name) under the authority of the simplified procedures for certain commercial items.
6. Reason for Authority Cited: Pursuant to FAR 13.501(a)(1) sole source (including brand name acquisitions conducted under simplified acquisition procedures are exempt from the requirements in part 6.
a. Background: Fort Lee is located in Virginia, Prince George County, consists of approximately 5907 acres and 440 buildings. The population base consists of approximately 22,750 military, Government civilians, and Contactor personnel, as well as 5450 resident family members.
b. Impact if not approved: The base will not be in accordance to the memo to rename the base.
7. Efforts to Obtain Competition: Currently, due to FRAGO 1 to HQDA EXORD 154- 25 ISO Base Redesignation.
a. (U) INSTALLATION SENIOR COMMANDERS, FORT BRAGG, FORT
BENNING, FORT PICKETT, FORT HOOD, FORT GORDON, FORT LEE, FORT
POLK, FORT RUCKER, AND FORT ANDERSON-PINN-HILL (WITH THE
DESIGNATION OF FORT A.P. HILL). 1.A. (U) [CHANGE TO READ] THE
SECRETARY OF DEFENSE (SECDEF) DIRECTED THE ARMY TO
REDESIGNATE FORT LIBERTY AS FORT BRAGG IN HONOR OF PFC
ROLAND L. BRAGG, FORT MOORE AS FORT BENNING IN HONOR OF SGT
CUI//SP-PROCURE//FEDCON
JUNE 2025
FRED G. BENNING, FORT BARFOOT AS FORT PICKET IN HONOR OF 1LT
VERNON W. PICKETT, FORT CAVAZOS AS FORT HOOD IN HONOR OF COL
ROBERT B. HOOD, FORT EISENHOWER AS FORT GORDON IN HONOR OF
MSG GARY I. GORDON, FORT GREGG-ADAMS AS FORT LEE IN HONOR OF
PVT FITZ LEE, FORT JOHNSON AS FORT POLK IN HONOR OF GEN JAMES
H. POLK, FORT NOVOSEL AS FORT RUCKER IN HONOR OF CPT EDWARD
W. RUCKER, AND FORT WALKER AS FORT ANDERSON-PINE-HILL (WITH
DESIGNATION OF FORT A.P. HILL IN HONOR OF LTC EDWARD HILL, FIRST
SERGEANT ROBERT A. PINN, AND PVT BRUCE ANDERSON. THE
HONOREES SERVED WITH GREAT DISTINCTION WITH THE UNITED
STATES ARMY AND THE SECDEF ACKNOWLEDGES EACH
INSTALLATION’S STORIED HISTORY OF SERVICE TO THE UNITED STATES
OF AMERICA. THE ARMY SHALL TAKE ALL NECESSARY STEPS AND
APPROPRIATE ACTIONS TO IMPLEMENT THESE SECDEF DECISIONS.
b. (U) [ADD] THE SECRETARY OF DEFENSE (SECDEF) DIRECTED THE ARMY
TO REDESIGNATE FORT GREGG-ADAMS TO FORT LEE, VIRGINIA — TO
HONOR MEDAL OF HONOR RECIPIENT PRIVATE (PVT) FITZ LEE FOR HIS
HEROISM DURING THE SPANISH-AMERICAN WAR. DURING A COASTAL
ASSAULT IN CUBA, PVT LEE VOLUNTARILY DISEMBARKED UNDER
DIRECT ENEMY FIRE TO RESCUE WOUNDED COMRADES FROM THE
BATTLEFIELD, EARNING THE MEDAL OF HONOR FOR HIS CONSPICUOUS
GALLANTRY.
c. (U) MISSION. [CHANGE TO READ] EFFECTIVE IMMEDIATELY, HEADQUARTERS, DEPARTMENT OF THE ARMY, EXECUTES THE SECDEF
DIRECTIVES TO REDESIGNATE FORT LIBERTY AS FORT BRAGG, FORT
MOORE AS FORT BENNING, FORT BARFOOT AS FORT PICKETT, FORT
CAVAZOS AS FORT HOOD, FORT EISENHOWER AS FORT GORDON, FORT
GREGG-ADAMS AS FORT LEE, FORT JOHNSON AS FORT POLK, FORT
NOVOSEL AS FORT RUCKER, FORT WALKER AS FORT ANDERSON-PINN-
HILL (WITH THE DESIGNATION OF FORT A.P. HILL, AND COMPLETES THE
IMPLEMENTATION NOT LATER THAN 31 AUGUST 2025 TO PROVIDE A
PERMANENT AND LASTING HONOR TO PFC BRAGG, SGT BENNING, 1LT
PICKETT, COL HOOD, MSG GORDON, PVT LEE, GEN POLK, 1LT RUCKER,
PVT ANDERSON, 1SG PINN, LTC HILL AND ALL OTHER DEPARTMENT OF
THE ARMY MILITARY AND CIVILIAN PERSONNEL WHO SERVED AT THESE
BASES WITH VALOR AND DISTINCTION.
d. Effective competition: Due to the directive above the required time frame, skills and prior experience with the resignation process it is not feasible to obtain full and open completion for the requirement.
e. Subcontracting competition: None.
8. Actions to Increase Competition: At this time, it is not possible to compete this acquisition on a full and open basis due to the nature of the requirement.
CUI//SP-PROCURE//FEDCON
JUNE 2025
9. Market Research: Research was complete based on market value of materials to be use and verification of pervious redesignation processes that align with current cost.
10. Interested Sources: At this time, no other sources have written to express an interest in this requirement. Due to the pace at which the project is required to be completed.
11. Other Facts: N/A
a. Procurement history. This is a new requirement. Therefore there is no procurement history.
b. Other facts. N/A
File details come from the government source that posted it. Updated .