Justification.pdf
PDF 279 KB Posted
- Attached to
- NOTICE OF INTENT TO AWARD SOLE SOURCE CONTRACT
- Solicitation number
- M62613-22-Q-0009
- Issued by
-
United States Marine Corps
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Synopsis.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Justification for Other than Full and Open Competition – FAR Part 13 Acquisitions under the SAT
V 1.3 (28 June 2018)
MEMORANDUM TO THE FILE M62613-FY22-SSBN-02
Subj: JUSTIFICATION FOR USE OF OTHER THAN FULL AND OPEN
COMPETITION FOR A FAR PART 13 ACQUISITION UNDER THE SIMPLIFIED
ACQUISITION THRESHOLD
I. BACKGROUND:
1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement (or portion of the requirement to be sole-sourced) is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE:
The Portal Crane, OZ12631H, was manufactured by Sumitomo Heavy Industries Material Handling Systems Co., Ltd. Maintenance and inspection of the crane must be conducted by the manufacturer or its affiliate. We have stored two sets of gantry reducers and motors in our heavy-shop as a spare part, but we have been recommended to overhaul these reducers and motors in case of an emergency. The following service is required to maintain the normal and stable operation since it has been passed 16 years after the first installation of this portal crane.
1. Overhaul two sets of gantry reducers and motors for gantry travel equipment at the reducer manufacture’s factory.
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN
COMPETITION IS BASED ON THE FOLLOWING (select all that apply):
A. ✔ ONLY ONE RESPONSIBLE SOURCE (select all that apply):
1. ✔ RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.
Sumitomo Heavy Industries (SHI) is the copyright holder of blueprints, technical documents, and design specifications of the portal crane. Other companies are unable to provide necessary maintenance and certification as prescribed by the
OEM.
2. ✔ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.
Justification for Other than Full and Open Competition – FAR Part 13 Acquisitions under the SAT
V 1.3 (28 June 2018)
Sumitomo Heavy Industries is the Original Equipment Manufacturer of the crane.
No aftermarket repair parts or services are offered which meet OEM specifications for the crane. SHI installed the crane on MCAS Iwakuni in 2005 and has been contracted since the crane’s inception to provide annual inspections and higher echelon maintenance and repairs.
3. OTHER REASONS.
B. BRAND NAME
Items required must be a brand name, product, or feature of a product, particular to one manufacturer.
C. URGENT AND COMPELLING. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals. Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:
1. Date on which the requirement was first identified:
2. Required delivery date/period of performance:
3. Explanation of why delivery/commencement of services by the date mentioned above is required:
V. CERTIFICATIONS:
A. Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.
MSgt Hedrick, Brandon A. / 253-4814 Name (Printed) / Phone # Date
B. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.
Name (Printed) / Phone # Date
16 Jun, 2022
Joseph Estrella, +81989702577 05 July 2022
File details come from the government source that posted it. Updated .