EIC Cryogenic Interface Cans
Solicitation number
JSA-26-S100926
Issued by

About this file

This is a Sources Sought Notice from Jefferson Lab (JLab) seeking sources for fabrication and delivery of 13 Cryogenic Interface Cans (CIC) for the Electron Ion Collider (EIC) 591 MHz Single Cell Cryomodule project. The notice is soliciting vendors with experience in cryogenic component manufacturing, specifically those capable of meeting key requirements including ASME code compliance, welding and brazing expertise, and specialized fabrication techniques for cryogenic systems.

Key requirements include performing welds with ASME qualified personnel, using Gas-Tungsten-Arc Welding (GTAW), constructing components with multi-layer insulation, and maintaining stringent cleanliness standards. The vendor must be able to handle complex fabrication involving internal piping, heat exchangers, and minimal leak rate requirements. Interested vendors must submit detailed information by November 5, 2025, including company details, business status, technical capabilities, and proposed fabrication timeline. JLab intends to award a firm fixed price subcontract to the vendor providing the best value to the EIC 591 SC project.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EIC Cryogenic Interface Cans - Sources Sought Notice Page 1

October 14, 2025

Sources Sought Notice EIC Cryogenic Interface Cans

JSA-26-S100926

Jefferson Lab (JLab) is seeking sources for fabrication and delivery of Cryogenic Interface Cans in support of the Electron Ion Collider (EIC) 591 MHz Single Cell Cryomodule (591 SC). Jefferson Lab is a nuclear physics research facility under contract to the U.S.

Department of Energy.

We intend to award a firm fixed price subcontract to the offeror that will provide the Best Value to the EIC 591 SC project for this requirement. The successful offerors will be selected through a process that will consider price and capability of vendors who respond to this Sources Sought notice in order to determine which vendors will be sufficiently competitive to submit proposals for the above package.

If your company has experience with similar projects, can meet the key requirements noted below and you are interested in competing for award, please register for this requirement on the Jefferson Lab Solicitation Bulletin Board (Solicitation Bulletin Board). To be considered, please submit all information requested on the attached page. In addition, we encourage all interested vendors to submit comments and/ or questions you may have whether they be business or technical.

Please email the information requested to: ckim@jlab.org no later than 4:00 PM Eastern Standard Time on November 5, 2025. If you have any questions, you may contact the undersigned at 757-269-6225, or e-mail ckim@jlab.org (preferred).

Regards, Charlie Kim Subcontracting Officer

Attached:

1. Required Information

2. Cryogenic Interface Can Top Assembly Drawing

3. Summary

4. Statement of Work https://misportal.jlab.org/ul/bus_ops/ mailto:ckim@jlab.org mailto:ckim@jlab.org

EIC Cryogenic Interface Cans - Sources Sought Notice Page 2

EIC Cryogenic Interface Cans

JSA-26-S100926

All interested vendors must submit all of the following information by the due date stated on the Sources Sought Notice.

1. Complete the following:

Company Name: ________________________________________________________________

Address: ________________________________________________________________________

Point of Contact (Printed Name): ____________________________________________________

Telephone: ____________________________________Email: ________________________

2. Business Status: (NAICS Code 332999, Size Standard 750 employees.) Please check all that apply:

Small Business Small Veteran-Owned Business Large Business Small Disadvantaged Business Small Woman-owned Business Organization for the Handicapped HUBZone Small Business Nonprofit Organization Foreign Business Concern

3. Total number of years your company has been in business performing this type of work: _______.

4. Key Requirements:

a. All welds must be performed and inspected by ASME qualified personnel.

b. All construction is to be to the latest relevant ASME Codes (No “U” Stamp required)

c. Experience with cryogenic piping fabrication and QA/QC (cold shock, pressure test and helium leak check)

d. The Cryogenic Interface Cans host ten cryogenic control valves, hence, experience with building cryogenic valves is favorable.

e. Experience with multi-layer-insulation (MLI) work, copper welding/brazing, 300 series stainless shell machining and welding are necessary.

5. Provide any comments or questions your company may have.

6. Provide the estimated amount of time that would be needed to complete a formal proposal response.

7. Provide your estimated schedule to complete the project after award.

Jefferson Lab is seeking preliminary technical and budgetary data only. This is not an order or a formal request for proposal. This request for information does not commit Jefferson Lab to pay any costs incurred by you in connection with the information gathering effort. The information we are requesting is strictly for preliminary planning purposes and for the identification of potential sources to foster a competitive environment. While your comments may be reviewed by others in the process, Jefferson Lab will not release the company name to others without your concurrence.

1 9 JL0188048 SPACER, CAV2 ELBOW PIPING - 11

1 8 JL0188050 ELBOW ASSEMBLY KIT, CAV1 - 9

1 7 JL0188026 TOP PLATE ASSEMBLY - -

1 6 JL0188059 INTRUMENTATION ASSEMBLY KIT - -

1 5 JL0188047 SPACER, CAV1 ELBOW PIPING - 11

1 4 JL0188032 THERMAL SHIELD ASSEMBLY - -

2 3 JL0188049 CENTRALIZER, ELBOW THERMAL

SLEEVE - -

1 2 JL0188299 ELBOW ASSEMBLY KIT, CAV2 - 9

1 1 JL0188041 CRYOGENIC INTERFACE CAN

WELDMENT - -

QTY

REQD

ITEM

NO.

PART OR

IDENTIFYING NO.

NOMENCLATURE

OR DESCRIPTION

MATERIAL

SPECIFICATION NOTES

PARTS LIST

CODE

BPVC

PS-EIC-24-001

FOR JLAB INTERNAL USE ONLY

PRESSURE/VACUUM CLASS

PRESSURE SYSTEMS NUMBER

SEE ES&H MANUAL CHAPTER 6151 FOR PRESSURE

AND VACUUM SYSTEMS SAFETY SUPPLEMENT AND

WELDING AND BRAZING SUPPLEMENT

WELD

CLASS

E

REV

D

THIRD ANGLE PROJECTION

E E

H

F

H

OTHERWISE

of Energy

SCALE

TOLERANCES ARE:

DWG. NO.

DRAWN

United States

.XXX \

MACHINED

F

EACH SHEET OF MULTI-SHEET DRAWINGS SHALL ALWAYS HAVE THE SAME REVISION LEVEL.

DATE/REVISER

UNLESS

SURFACES

NOTED

C

A

DESCRIPTION

MATERIAL

REV.

.XX \

SHEET OF

.X \

ZONE

DATE

G

DO NOT SCALE DRAWING

A

1USED ON ASSY NO.

SIZE

B

DIMENSIONS ARE IN INCHES.

FINISH

UNLESS OTHERWISE SPECIFIED

Department

Newport News

B

C

REVISION HISTORY

Virginia

G

DEBURR & BREAK ALL SHARP EDGES

FRACTIONS DECIMAL ANGLES

D

DIM & TOL PER ASME Y14.5-2018.

EIC - 591 MHz SC 2CAV CRYOMODULE FIRST ARTICLE

CRYOMODULE

CRYOGENIC INTERFACE CAN

TOP ASSEMBLY

1:6 JL0188021 4

SEE PARTS LIST

JONATHAN SMITH 2025-09-25

1/8 .1 .01 .005

.50`

JL0188025

1. FABRICATE PER STATEMENT OF WORK JL0188025-SOW.

2. PROCESS PIPING WELDING IN ACCORDANCE WITH ASME B31.3.

LEAK CHECK IN ACCORDANCE WITH JLAB SPECIFICATION: 11141-S-0029.

3. VACUUM / AIR BOUNDARY WELDING IN ACCORDANCE WITH BPVC.

LEAK CHECK IN ACCORDANCE WITH JLAB SPECIFICATION: 11141-S-0033.

4. CLEAN AND HANDLE PER GENERAL LAB SPECIFICATION: 11141-S-0035.

5. COMPLETE JOINT PENETRATION WITH JOINT GEOMETRY OPTIONAL.

6. BRAZE OR WELD. PQR/BQR, PQR AND BPQ/WPQ SHALL SHOW STRENGTH OF

JOINT AT LEAST STRONGER THAN THE WEAKER BASE MATERIAL.

CHOOSE BRAZE ALLOY MELTING POINT WISELY TO AVOID DAMAGING OTHER

JOINTS.

7. INTERPRET WELDING AND NONDESTRUCTIVE EXAMINATION SYMBOLS PER

ANSI/AWS A2.4.

8. PARTS TO BE CONDITIONED FOR SAFE HANDLING. REMOVE ALL BURRS

AND SHARP EDGES.

9. SHIP AS LOOSE ITEMS.

10. PROTECT ALL SEALING SURFACES FOR SHIPPING.

11. WIND ALUMINUM WIRE ON BOTH SIDES OF THE SPACER(S) AS MECHANICAL

STOPS.

12. APPROXIMATE TOTAL WEIGHT - 2900 LBS

NOTES:

EXPLODED ISOMETRIC

NOT TO SCALE P

RELIMINARY

8 6 4 35 27

C

D

E

F

G

H

A

B

8 6 4 357 1

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

E

REV.

A

B

D

E

F

G

H

C

1:6 JL0188021 2 4

JL0188025

104.38

44.19 50.19

35.00

15.28R

76.06

41.75

9.85

17.50

94.38

16.51

13.02 1.70

11.5213.01

20.29

7.70

2X 6.25

38.38

24.00

10.30

13.80

3.00

PRELIMINARY

D

E

F

G

H

A

B

8 6 4 357 1

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

E

REV.

A

B

D

E

F

G

H

C

1:4 JL0188021 3 4

JL0188025

ISOMETRIC VIEWS

FOR REFERENCE ONLY

SCALE: 1:4

D

E

F

G

H

A

B

8 6 4 357 1

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

E

REV.

A

B

D

E

F

G

H

C

1:6 JL0188021 4 4

FRONT VIEW BACK VIEW

24.00

6.89

.38

VACUUM

TIGHT

OJP

.38

VACUUM TIGHT

OJP

.11

3X

.25 2.0-4.0

6.89

VACUUM TIGHT

CJP

VACUUM TIGHT

CJP

2 2 8

REF

REF

REF

REF

REF

REF

REF

REF

REF

REF

.25 2.0-4.0

-JL0188025

SRF-07-FM-003 SRF OPS Word Document Template, R3 Page 1 of 2

1 Introduction

This document serves as an abridged summary of the work required for the production of the EIC 591

MHz Single Cell Cryomodule Cryogenic Interface Can (CIC). Complete scope and requirements will be detailed in document JL0188025-SOW.

This document package contains preliminary design information provided for reference only. Final design is subject to revision. As part of the ongoing development process we welcome feedback and suggestions which may improve performance or manufacturability of the CIC.

2 Production Requirements

2.1 Material Specifications

2.1.1 Certified Mill Test Reports are required for all vendor-supplied components.

2.1.2 No magnetic materials or carbon steel are permitted as part of the final CIC assembly.

2.2 Welding and Brazing

2.2.1 Vendor shall submit welding/brazing procedure qualifications (WPQ’s/BPQ’s), welding/brazing procedure specifications (WPS’s/BPS’s) and procedure qualification records (PQR’s) in accordance with ASME BPVC Sec. IX. Personnel conducting testing of welds shall be certified in accordance with ASME BPVC Sec. V.

2.2.2 Vendor shall develop weld maps for all weldments of the Cryogenic Interface Can. In-process weld records shall document for each weld the WPS, welder, inspector, and dates.

2.2.3 Vendor shall supply qualifications for all welders and weld inspectors.

2.2.4 All welding shall be done by the Gas-Tungsten-Arc Weld (GTAW) method. Manufacturer shall ensure that no entrapped gases, fluxes, pits, cracks, or like imperfections are left in the heat affected zones. All edges shall be rounded, and burrs removed from all seams, joints, and welded areas.

2.3 Pressure Systems

2.3.1 The design pressure for the CIC Vacuum Shell is 33 psig. The design pressure for the CIC

Process Piping is 165 psig. This design will require the Seller and any subcontractors to follow the ASME BPVC requirements including pressure testing of the completed CIC assembly. JLAB is not requiring the Seller to “U“ stamp the CIC.

2.4 Multi-Layer Insulation

2.4.1 All surfaces that operate below room temperature during normal operation shall be thermally protected with multi-layer reflective insulation (MLI). This material consists of alternating single layers of spun-bonded polyester spacer and radiation reflectors.

2.5 Cleanliness

Summary of EIC 591 Cryogenic Interface Can Production Requirements

Document Number: N/A Effective Date: 26 Sept, 2025

Revision Number: N/A Periodic Review Date: N/A

Document Owner: Matt Weaks Department Owner: SRF Operations

SRF-07-FM-003 SRF OPS Word Document Template, R3 Page 2 of 2

2.5.1 Cleaning of internal surfaces of piping, vessels, valves, and devices shall meet requirements for normal refrigeration and/or cryogenic equipment not exposed to liquid air or oxygen. The subcontractor shall submit cleaning procedures for JLAB approval prior to fabrication.

2.5.2 No anti-seize compounds, oils, or other materials that may cause outgassing are permitted within the vacuum space.

2.6 Instrumentation

2.6.1 Each CIC houses multiple Cernox temperature sensors, each of which bears its own serial number which must be tracked and recorded through installation.

2.6.2 Wires connecting these sensors shall be well protected and clearly labeled.

2.6.3 Sensors must be protected from damage, excessive temperature, and electrical currents.

3 Testing Requirements

3.1 Pressure Testing

3.1.1 All internal piping and the external vacuum shell shall be pressure tested per ASME BPVC &

B31.3 rules.

3.2 Cold Shock Testing

3.2.1 All components considered to be part of the helium circuit shall undergo a minimum of 3 cycles cooling to Liquid Nitrogen temperatures (~77K) and warming back to Room Temperature

(>285K)

3.2.2 Each CIC houses two (2) brazed aluminum plate-fin heat exchangers, these heat exchangers are subject to restrictions on maximum cooldown rate, and maximum temperature difference across streams. Vendor must develop a procedure to ensure these restrictions are not exceeded during cold shock testing.

3.3 Helium Leak Testing

3.3.1 Final helium leak testing shall be performed following cold shocks and pressure testing.

3.3.2 All piping shall be helium leak tested after final assembly to a maximum leakage rate of

2∙10 -10 mBar*Liter/sec.

3.3.3 The Vacuum Shell shall be helium leak tested after final assembly to a maximum leakage rate of 1∙10 -9 mBar*Liter/sec.

3.3.4 A calibrated leak located at the furthest accessible point from the leak detector shall be used to prove system sensitivity

3.4 Valve Testing

3.4.1 Each CIC hosts ten (10) cryogenic control valves.

3.4.2 Each valve shall be tested to ensure leak tightness, ability to achieve full stroke length, and that the valve assemblies are free of binding, jamming or misalignment.

3.4.3 JLab will supply a set of valve actuators and a valve controller for the purpose of valve testing.

3.5 Instrumentation Testing

3.5.1 Vendor shall test each sensor for proper function and confirm no damage or short to ground.

Electrical resistance of each sensor shall be compared to allowable range, and results shall be submitted to JLab.

3.6 Test Fixturing

3.6.1 Vendor shall produce test caps for each CIC which serve to seal the vacuum shell while allowing access to the process piping for testing purposes

JL0151901-SOW, R1 Print Date:10/6/2025 Page 1 of 16

Table of Contents 1 Acronyms

2 Introduction

3 Scope

4 Procurement Officer’s Technical Representative (TR)

5 Applicable Documents

6 Deliverables

7 Government-Furnished Equipment and Material (if applicable)

8 Delivery Schedule

9 After Award of Contract

10 Meetings

11 Inspection and Test Plan

12 Subcontractor Instructions

13 Preparation for Delivery

14 Release and Revision History

15 Approvals

1 Form Information

2 Form Release and Revision History

3 Form Approval

Statement of Work for EIC Cryomodule Cryogenic Interface Cans Document Number: JL0188025-SOW Date: DD Mmm YYYY

Revision Number: - Project: EIC

Author: Matt Weaks Department Owner: SRF Ops

JL0151901-SOW, R1 Print Date:10/6/2025 Page 2 of 16

1 Acronyms

Use this section to define any acronyms that are in the document

• 591 SC – 591 MHz Single Cell Cryomodule

• ARO – After Receipt of Order

• ASME – American Society of Mechanical Engineers

• BNL – Brookhaven National Lab

• BPQR – Braze Procedure Qualification Record

• BPS – Braze Procedure Specification

• CEBAF – Continuous Electron Beam Accelerator Facility

• CIC – Cryogenic Interface Can

• CM – Cryomodule

• CMM – Coordinate Measuring Machine

• CMTR – Certified Material Test Report

• CR - Combined Return

• EIC – Electron Ion Collider

• EIC – Electron Ion Collider

• HX - Heat Exchanger

• NCR – Non-Conformance Report

• PO – Procurement Officer

• PO# - Purchase Order Number

• PS - Primary Supply

• RFQ – Request for Quote

• SA - Sub-Atmospheric

• SOW – Statement of Work

• TJNAF – Thomas Jefferson National Accelerator Facility

• TR – Technical Representative

• WPQR – Welding Procedure Qualification Record

• WPS – Welding Procedure Specification

2 Introduction

Thomas Jefferson National Accelerator Facility (TJNAF) is a nuclear physics research laboratory seeking production of thirteen (13) Cryogenic Interface Cans (CIC) for use on the Electron-Ion Collider (EIC)

Project. The CIC is an essential component of the EIC 591 MHz Single Cell Cryomodules (591 CS) which serves as an interface between the cryogenic helium transfer lines and the 591 SC module. The CIC hosts cryogenic piping, valves, reliefs, etc. servicing cryogenic helium at temperatures as low as 2

Kelvin.

The CIC is considered a part of the EIC 591 SC’s pressure boundary, therefore construction of the CIC shall adhere to the latest relevant ASME Codes and will be subject to requirements for cleanliness, magnetic hygiene, leak tightness, and dimensional tolerance. No “U” Stamp is required.

The construction of the CIC poses a particular challenge due to the complexity of the internal piping, the need for installation of Multi-Layer Insulation (MLI), the inclusion of 2 plate-fin aluminum heat exchangers, and a minimal leak rate requirement across many welds.

JL0151901-SOW, R1 Print Date:10/6/2025 Page 3 of 16

3 Scope

This Statement of Work (SOW) describes the minimum requirements necessary to fabricate the

Cryogenic Interface Can assemblies for TJNAF in support of the EIC 591 MHz Single Cell Cryomodule production.

Within this document, references and engineering drawings with labels of EIC, Jefferson Laboratory

(JLab) or the company Jefferson Science Associates, LLC (JSA), shall refer to the buyer, “TJNAF.”

The “subcontractor” shall refer to the manufacturer and/or subcontractor performing the scope of work described here and in all applicable documentation. The subcontractor is responsible for delivering components in conformance with the requirements of this SOW. TJNAF will work with the subcontractor to correct non-conformities with minimal impact on cost and schedule. The subcontractor is encouraged to recommend changes to the scope of work which improve Cryogenic Interface Can performance, reduce cost, or take advantage of the subcontractor’s unique capabilities. TJNAF will work with the subcontractor to evaluate the proposed changes and if determined to be acceptable, incorporate them into the purchasing documents.

3.1 Deliverables to JLab

3.1.1 Cryogenic Interface Can Assemblies as per this specification and drawing JL0188025.

3.1.2 Testing Caps (SCOPE NOT YET DEFINED)

3.1.3 All Documentation as stated in Section 6.2.9 and summarized in Table 3 shall be provided as specified.

3.2 Subcontractor Furnished Materials and Equipment.

3.2.1 Subcontractor shall provide all labor to assemble, test and supervise outsourcing fabricated parts.

3.2.2 All materials except Government Furnished Materials shall be provided by subcontractor, including all consumables and raw materials.

3.2.3 All fixtures, assembly and test equipment, or any facility required to execute the fabrication of the Cryogenic Interface Can assemblies.

3.3 Government Furnished Materials (GFM) by JLab.

3.3.1 JLab will furnish certain materials, components, or equipment (“Government-Furnished

Materials” or “GFM”) to the Vendor for use in the performance of this work. The Vendor shall be responsible for the proper handling, storage, and protection of all GFM upon receipt.

3.3.2 The Vendor shall inspect all GFM upon delivery and notify the Buyer in writing within [10] business days of any damage, discrepancies, or nonconformities. Failure to notify within this period shall constitute acceptance of the BFM as-is.

3.3.3 The Vendor shall maintain accurate inventory records of all GFM and shall not use such materials for any purpose other than the performance of this SOW without prior written authorization from JLab.

3.3.4 Any loss or damage to GFM due to Vendor negligence shall be the responsibility of the Vendor.

3.3.5 See Sec. 7 for itemized list of GFM to be supplied by JLab.

JL0151901-SOW, R1 Print Date:10/6/2025 Page 4 of 16

4 Procurement Officer’s Technical Representative (TR)

The TR is a TJNAF employee assigned to interface with the Subcontractor on technical matters after subcontract award. The TR is only authorized to provide technical direction within the scope of the subcontract. Any modification to the scope or terms of the subcontract must be approved in advance by the TJNAF Subcontracting Officer.

After subcontract award, the TR will assist the Subcontractor in the interpretation of technical requirements as outlined in the contract. Any clarification provided by the TR concerning the work to be performed shall not be construed as a change to the subcontract. Only the TJNAF PO is authorized to accept nonconforming work; waive any requirement of this subcontract; or modify any term or condition of this subcontract.

All direction from the TR and the PO shall be provided in writing.

TR Name: Matt Weaks

TR Phone: (757) 269-7649

TR Email: weaksmc@jlab.org

PO Name: Connor Clark / Mitch Laney

PO Phone:

PO Email:

5 Applicable Documents

5.1 No substitutions or deviations from the drawings and specifications may be made without written authorization from the JLAB procurement representative.

The following table lists all technical documents provided by TJNAF.

Document Name Document Number Rev

Vendor Aluminum Cleaning Procedure 11141-S-0028 C

Vendor High Sensitivity Helium Leak Check

Procedure

11141-S-0029 C

Vendor Standard Helium Leak Check Procedure 11141-S-0033 C

Vendor Stainless Steel Cleaning Procedure 11141-S-0034 B

Vendor General Cleaning and Handling 11141-S-0035 B

Superinsulation Installation 75910-0010 -

Superinsulation Low Emissivity Film 75910-0011 -

Superinsulation Low Conductivity Spacer 75910-0012 -

591 SC Cryogenic Interface Can Drawing JL0188025 -

Table 1: Applicable Documents

5.2 The Subcontractor shall be responsible for updating any and all references to codes and other standards to reflect the latest editions and requirements. The subcontractor shall comply with the requirements shown or specified in this document when Codes, Rules, Regulations, Standards, and

Ordinances are not in excess of these requirements. The subcontractor should also list all the codes the equipment(s) are complied with.

5.2.1 American Society of Mechanical Engineers (ASME) B31.3 “Process Piping” Codes and

Regulations.

5.2.2 ASME Boiler & Pressure Vessel Code (BPVC).

5.2.3 American Society for Testing and Materials (ASTM)

mailto:weaksmc@jlab.org

JL0151901-SOW, R1 Print Date:10/6/2025 Page 5 of 16

5.2.3.1 E493, Standard Practice for Leaks Using the Mass Spectrometer Leak Detector in the Inside-

Out Testing Mode

5.2.3.2 E498, Standard Practice for Leaks Using the Mass Spectrometer Leak Detector or Residual

Gas Analyzer in the Tracer Probe Mode

5.2.3.3 E499, Standard Practice for Leaks Using the Mass Spectrometer Leak Detector in the

Detector Probe Mode

6 Deliverables

6.1 Parts

The subcontractor shall provide all components in the quantities listed in CIC Drawing JL0188025 and its associated drawings, as well as Testing Caps per XXXXXX. All components shall meet the requirements of this SOW, and all requirements listed on respective drawings.

Part Name Drawing Number Rev Qty.

591 Cryogenic Interface Can (First Article) JL0188025 - 1

591 Cryogenic Interface Can (Production) JL0188025 - 12

Testing Caps (First Article) - 3

Testing Caps (Production) - 36

Table 2: List of Manufactured Parts to be delivered by Subcontractor.

6.2 Requirements

6.2.1 Welding and Brazing

6.2.1.1 See Sec. 12.1 for Welding and Brazing Requirements.

6.2.2 Control Valves

6.2.2.1 It should be noted that installation of the control valve seat requires custom tooling.

Vendor shall produce their own tool. If needed, JLAB may provide information on the tooling currently in use at JLAB. Some known risks include dropping the valve seat before tightening it, the seat cross-threading the mating adapter, and valve stem misalignment with respect to the housing. Vendor shall verify that the male stem can be inserted smoothly and the top mounting flanges should match with no gaps.

6.2.2.2 Vendor shall test all completed valve assemblies in the final assemblies to ensure leak tightness, ability to achieve full stroke length, and that the valve assemblies are free of binding, jamming or misalignment.

6.2.3 Pressure Systems Requirements

6.2.3.1 The design pressure for the CIC is 33 psig. This design will require the Seller and any subcontractors to follow the ASME BPVC requirements including pressure testing of the completed CIC assembly. JLAB is not requiring the Seller to “U“ stamp the CIC. Structural analysis of the CIC has been performed to show that the CIC design is compliant with the

ASME BPVC requirements and can be reviewed upon request. Should the vendor perform independent analysis to meet their internal requirements, JLAB may provide information on boundary and loading conditions.

6.2.3.2 Piping

The piping inside the CIC shall be fabricated, inspected, and tested in accordance with

ASME B31.3 for normal fluid service. The piping circuits are identified in Appendix XXXXX.

CIC cryogenic piping MAWPs at room temperature are as follows:

JL0151901-SOW, R1 Print Date:10/6/2025 Page 6 of 16

• Supply piping 165 psig

• Return Sub-Atmospheric piping 75 psig

• Cool-down bypass/primary relief 165 psig

• Combined Return Piping 165 psig

6.2.4 Testing

The contractor shall submit detailed cold shock, pressure test and leak check procedures for approval by JLAB as part of the bid package. It is at the Seller’s discretion whether to perform tests at component or subassembly level or not. Cold shock, pressure test and leak test at final assembly level for all CIC assemblies is mandatory.

6.2.4.1 Pressure Test

1. The Seller shall perform pressure tests on all cryogenic circuits and the CIC final assemblies.

2. See Sec. 11.1 for details.

6.2.4.2 Cold Shock:

3. All internal components of the CIC are to undergo a minimum of 3 cycles from room temperature to liquid nitrogen temperatures (~77K), back to room temperature.

4. See Sec 11.2 for details.

6.2.4.3 Helium Leak Test:

1. Specific helium leak check requirements and rates are noted on relevant drawings.

2. Unless otherwise specified, cryogenic pipes inside the CIC are required to have a helium leakage not exceeding 2.0 × 10 -10 atm*cc/sec. CIC air to vacuum boundary shall not have a leak rate greater than 1.0 × 10 -9 atm*cc/sec.

3. Exception to these leak rates shall be approved by JLAB.

4. See Sec 11.3 for details.

6.2.5 Multi-Layer Insulation

1. All surfaces that operate below room temperature during normal operation shall be thermally protected with multi-layer reflective insulation (MLI). This material consists of alternating single layers of spun-bonded polyester spacer and radiation reflectors.

2. See Sec 12.3 for details

6.2.6 Cleanliness

Refer to Section 12.3 for full details of cleaning requirements.

1. Surfaces shall be cleaned at stages of fabrication such that dust, oils and other contaminants are removed prior to final assembly and preparation for delivery to

JLAB.

2. Seller may submit their own cleaning specifications for JLAB’s approval.

6.3 Technical Documentation Package

6.3.1 All Welding & Brazing Documentation as described in Sec 12.1

6.3.2 Quality Assurance Manual

The subcontractor shall provide TJNAF with a written quality assurance (QA) manual and/or description of the QA program used for this procurement, delivered as part of the proposal.

This written document shall include, but is not limited to the following:

• Quality management (organizational structure, responsibilities, and interfaces)

• Personnel training and qualifications

JL0151901-SOW, R1 Print Date:10/6/2025 Page 7 of 16

• Quality improvement (deviation identification and prevention, corrective action, lessons learned)

• Document and record control

• Work process control

• Design control

• Procurement control

• Inspection and acceptance testing (equipment maintenance and calibration)

• Program assessment (internal or external)

6.3.3 All Documentation as noted in Sec 12.5 and Table 3

7 Government-Furnished Equipment and Material (if applicable)

• Heat exchangers made per drawing JL0155152. Each Cryogenic Interface Can requires two heat exchangers.

• Cernox® temperature sensors and associated vendor documents. Each CIC requires 32 Cernox temperature sensors.

• 24VDC Valve Actuators (For testing of valves, to be returned to JLab on conclusion of this contract)

• 24VDC Valve Controller (For testing of valves, to be returned to JLab on conclusion of this contract)

JL0151901-SOW, R1 Print Date:10/6/2025 Page 8 of 16

8 Delivery Schedule

Table 3 lists the desired delivery schedule for the Cryogenic Interface Cans

Description When Required TJNAF Approval

Fabrication Timeline With Proposal Required

Exceptions/Deviations With Proposal Required

Quality Assurance Plan/Manual With Proposal N/A

Dimensional Inspection Plan With Proposal Required

Cold Shock Procedure With Proposal Required

Pressure & Leak Check Procedures With Proposal Required

Cleaning and Handling Procedures With Proposal Required

Drawing Package(s), including all weld maps. 10 Business Days prior to

Production Readiness Review

Required

Inspection and Test Plan 10 Business Days prior to

Production Readiness Review

Required

Weld/Braze Inspector Qualification 10 Business Days prior to

Production Readiness Review

Required

WPS/BPS, PQR, WPQ/BPQ 10 Business Days prior to

Production Readiness Review

Required

Non-Conformance Report Within 7 days of each occurrence

Required

Valve Inspection Report 10 Business Days prior to shipping review.

Required

Shipping Plan 10 Business Days prior to shipping review.

Required

CMTRs 10 Business Days prior to shipping review.

N/A

Weld Inspection Reports 10 Business Days prior to shipping review.

N/A

Non-Destructive Examination Reports 10 Business Days prior to shipping review.

N/A

Pressure & Leak Test Reports 10 Business Days prior to shipping review.

N/A

Instrumentation Test Reports 10 Business Days prior to shipping review.

N/A

Cold Shock Reports 10 Business Days prior to shipping review.

N/A

Dimensional Inspection Report(s) 10 Business Days prior to shipping review

N/A

Table 3: Delivery Schedule

9 After Award of Contract

9.1 The subcontractor and TJNAF will agree on a date for a hybrid (remote/in-person) PRR to be held in a meeting room at the subcontractor facility. This meeting shall be considered at the same meeting referenced in section 10.2.

9.2 The subcontractor shall make their facility available for regular visits from TJNAF representatives with appropriate notice.

10 Meetings

JL0151901-SOW, R1 Print Date:10/6/2025 Page 9 of 16

10.1 Kick-Off Meeting/Technical Exchange Meeting(s)

• A Kick-Off meeting shall be held to discuss any open issues with the subcontract requirements and to clarify any uncertainties prior to start of development work.

• The date of the kick-off meeting will be determined between JLAB and the subcontractor. The expectation is that the kick-off meeting is held within four (4) weeks of the Subcontract award date

10.2 Production/Work Readiness Review(s) (PRR)

• The Production/Work Readiness Review(s) are to serve as a Final Design Review (FDR) prior to the start of any fabrication work or the start of service.

• All requested drawings and procedures must be submitted to JLAB 48 hours ahead of any scheduled PRR.

• Subcontractor shall be prepared to present the design and any supporting documents including drawings, procedures, timelines, and calculations.

• Any documents that the Subcontractor must present prior to production/service start shall be ready.

10.3 Pre-Inspection Meeting(s)

• Prior to any fabrication subject to inspection by a qualified authority a meeting shall be held to allow JLab representatives/inspectors to review the requirements and expectations of the inspection.

10.4 In Progress Surveillance/Hold Point

• JLAB holds the right to establish surveillance or hold points deemed necessary to receive updates on the contract or to audit/witness Subcontractor processes.

• First Article (FA) Hold Point: The Subcontractor shall obtain JLAB’s written approval or waiver on the FA before continuing with fabrication of the production heat exchangers.

10.5 Pre-Shipping Review

• Subcontractor shall submit all required CMTRs, Inspection/Test Reports, Weld/Braze Records, Maps, Certifications, etc, to JLAB prior to shipment/Pre-Shipping Review.

• Subcontractor shall provide JLAB with 10 business days advance notice of the shipment date to allow for travel arrangements to the contractor’s site for inspection prior to shipment.

11 Inspection and Test Plan

11.1 Pneumatic Pressure Test.

1. All pneumatic pressure tests shall observe ASME B31.3 & BPVC rules.

2. The subcontractor shall submit for approval by JLAB a detailed procedure for pressure testing prior to fabrication for approval.

3. The subcontractor shall use clean dry air, nitrogen, or helium for all pneumatic pressure tests.

4. Pneumatic pressure tests are to be performed prior to helium leak checks.

5. All internal piping shall be pneumatically pressure tested after final assembly. Vendors are encouraged to perform pressure tests of sub-assemblies to ensure quality.

6. The vacuum shell shall be pneumatically pressure tested after final assembly.

11.2 Cold Shock:

JL0151901-SOW, R1 Print Date:10/6/2025 Page 10 of 16

11.2.1 Definition of Cold Shock: Cooling all process lines to a cryogenic temperature at or near the temperature of liquid nitrogen at atmospheric pressure (77 K).

11.2.2 At least 3 cool down then warm up thermocycles shall be carried out on each circuit. It is the responsibility of the subcontractor to determine the safe and proper rate of cooling (or warming) the process lines.

• The Cryogenic Interface Can(s) each house two brazed aluminum plate-fin aluminum heat exchangers, the cool-down/warm-up requirements for the heat exchangers listed in &AZ-PFHE-B-MU 1001 (EN) are to be adhered to during the cold shock testing.

11.2.3 Cold Shock is to be performed prior to helium leak check.

11.2.4 Subcontractor shall submit the Cold Shock Test procedure(s) to JLAB for approval as part of the proposal package. The cold shock procedure shall ensure that all components considered to be part of the cryogenic circuit reach steady state liquid nitrogen temperature.

11.3 Helium Leak Test:

11.3.1 Subcontractor shall adhere to 5.1 Helium Leak Check specifications (11141-S-0029 Rev. C &

11141-S-0033 Rev. C) and the following specific requirements.

11.3.2 The subcontractor shall perform the following specified testing.

1. The completed Cryogenic Interface Can Assembly shall be vacuum leak checked, after the cold shock and pressure test, in accordance with ASTM E498 requirements.

2. Total leakage for any circuit to insulating vacuum shall not exceed 2 x 10 -10 mbar*liter/sec.

3. Total leakage from insulating vacuum to air shall not exceed 1 x 10 -9 mbar*liter/sec.

4. Exception to these leak rates shall be approved by JLAB.

11.3.3 Subcontractor shall submit the Helium Leak Test procedure for JLAB approval as part of Proposal package.

11.3.4 Pneumatic pressure test and Cold shock are to be performed prior to helium leak check.

11.4 Instrumentation:

11.4.1 After installation, vendor shall check all sensors to ensure proper function. First, check each lead against another lead or the ground to make sure there is no short circuit. Then, measure the electrical resistance of the sensor and compare to the allowable resistance range that will be provided by JLAB.

11.4.2 Each CIC has two 32-pin feedthroughs. These feedthroughs need to be leak checked to a leak rate less than 1.0 × 10-9 atm*cc/sec. Any feedthroughs which fail leak tests shall be returned for repair/replacement.

11.5 Control Valve Testing

11.5.1 Vendor shall test all completed valve assemblies in the final assemblies to ensure leak tightness, ability to achieve full stroke length, and that the valve assemblies are free of binding, jamming or misalignment.

Measurement Nominal Value

Helium Leak Test (Internal) 2•10 -10 mBar*L/sec

Helium Leak Test (Vacuum Shell) 1∙10 -9 mBar*L/sec

Pressure Test (Supply Piping) 165 psig

Pressure Test (Sub-Atmospheric Return) 165 psig

Pressure Test (Combined Return Piping) 165 psig

Pressure Test (Vacuum Shell) 33 psig

Table 5: Nominal Test Values

JL0151901-SOW, R1 Print Date:10/6/2025 Page 11 of 16

12 Subcontractor Instructions

The subcontractor is required to build, test, procure and deliver the items as specified in section 6. All deliverables shall be free of burrs, scratches, dents and fluids. The deliverables shall be structurally sound and uniform in shape. All applicable documents must be adhered to. Any conflict or ambiguity in these requirements must be brought to the attention of the JLAB procurement officer prior to any work being done or cost being incurred by JLAB.

Note: If subcontractors to the prime subcontractor are employed, it is the responsibility of the prime subcontractor to ensure all requirements set forth herein are abided by the subcontractors. All required documentation applicable to subcontractors shall be submitted to JLAB.

12.1 Welding and Brazing

Vendor shall submit welding/brazing procedure qualifications (WPQ’s/BPQ’s), welding/brazing procedure specifications (WPS’s/BPS’s) and procedure qualification records (PQR’s) in accordance with

ASME BPVC Sec. IX. Personnel conducting testing of welds/brazes shall be certified in accordance with

ASME BPVC Sec. V.

12.1.1 Welding shall be performed using the Gas-Tungsten-Arc Welding (GTAW) method. Manufacturer shall ensure that no entrapped gases, fluxes, pits, cracks, or like imperfections are left in the heat affected zones. All edges shall be rounded, and burrs removed from all seams, joints, and welded areas.

1. Observe ASME BPVC Section VIII, Division 1, UHA-51 rules on impact tests, weld filler material and Ferrite Number (FN) requirements.

2. Seller shall also observe the welding preparation and dimensional control standards set forth in ASME B16.25 code and perform the welding specimen mechanical tests as stated in ASME Boiler & Pressure Vessel code, Section IX, QW-141.

12.1.2 Manufacturer shall provide evidence of welder qualifications in welding of process piping in accordance with ASME B31.3 para. 328.2, which refers to ASME BPVC, Section IX.

12.1.3 Stainless steel welding filler metal shall be 316L. Each heat of filler metal used in production shall have a Ferrite Number (FN) not greater than 10.

12.1.4 Copper shield welding shall be performed with Inert Gas Shielding such that no entrapped gasses, fluxes, or general pits remain in the heat affected zones.

12.1.5 As noted on drawings, the sequence of brazing and selection of brazing allows shall be such that a later braze does not risk un-brazing of previous joints.

12.1.6 Manufacturer shall also observe the welding preparation and dimensional control standards set forth in ASME B16.25 code and perform the welding specimen mechanical tests as stated in

ASME Boiler & Pressure Vessel code, Section IX, QW-141.

12.1.7 All expendable tooling (saw blades, files, cutters, grinding wheels, wire brushes, grinding burrs, etc.) used in the manufacture of the Cryogenic Interface Can shall be unused at the start of the process and shall not have come in contact with or contain carbon steel.

12.1.8 Vendor shall develop weld maps for all weldments of the Cryogenic Interface Can. In-process weld records shall document that on which component, (quote the weld identification on the corresponding weld map) a certain weld is done following which WPS, by which welder

JL0151901-SOW, R1 Print Date:10/6/2025 Page 12 of 16

(signature or stamp), on what date, weld inspector’s name, inspection date and signature. Refer to 6.2.9.7 for submission requirement.

12.1.9 Post cleaning of welds and brazes is required to leave the surface in a bright finish condition with no trace of solvents residue. The manufacturer shall identify the cleaning process used to remove the residue as part of the proposal package. Manufacturer's cleaning procedure shall clearly demonstrate that the requirements of Section 12.3 will be met or exceeded.

12.2 Instrumentation

12.2.1 There are a total of 32 Cernox sensors in each Cryogenic Interface Can. Cernox sensors have their own serial numbers, which must be recorded after installation and associated with the location information. Wires connecting to the sensors shall be well protected and labeled to facilitate identification. Refer to XXXX drawing for sensors wiring details and names of the sensors. Each wire shall be labeled with the corresponding sensor’s identification number, such as “te43_a” & “te43_b” for the pair of sensors mounted on the Surge Tank.

12.2.2 Each Cernox has a set of lead wires approximately 7-foot long. The wires are to be heat-sunk to nearby 2K or 50K surfaces for a linear length of 4-6 and ~ 12 inches, respectively. The 2.1.4 drawing shows wire cold intercept details.

12.2.3 Cernox wires shall not be soldered to the feedthrough pins. Feedthroughs shall not be installed during pressure tests. Feedthroughs may be shipped as loose items.

12.2.4 All Cernox temperature sensors and feedthroughs shall be inspected per Sec. 11.4

12.3 Multi-Layer Insulation

All surfaces that operate below room temperature during normal operation shall be thermally protected with multi-layer reflective insulation (MLI). This material consists of alternating single layers of spun-bonded polyester spacer and radiation reflectors.

1. Installation of MLI shall conform to JLAB specification 75910-0010.

a. 2K/5K surfaces required 12-24 layers of MLI to be applied.

b. 50K/85K surfaces require 45-60 layers of MLI to be applied.

c. Any exception shall be approved by JLAB.

1. Seller shall ensure protection of MLI during welding to prevent damage, burning or excessive heating. Any such protective material shall be removed prior to final assembly unless the material is vacuum compatible and does not interfere with pipe movements. JLab approval is required for all materials left in place for final assembly.

2. Double Aluminized Mylar (DAM) shall conform to JLAB specification 75910-0011.

3. Polyester spacer material shall conform to JLAB specification 75910-0012, Spun-

Bonded Polyester (Reemay Corp. product number 2250.)

12.3.1 MLI shall be constructed into blanket subassemblies where specified.

1. The seller shall assemble all MLI blankets at their own facility.

2. Fabrication shall be done in a designated area that is oil and grease free as well as free of airborne dust.

3. Blanket application shall be performed on clean, oil-free, grease-free surfaces per

CEBAF specification 11141-S-0037.

4. Thermal shields require 45-60 layers on the warm side.

12.3.2 Barber Pole Wrapping

1. This technique is required where application of pre-constructed blankets is not practical, most often on individual piping runs. Alternate layers of DAM and spacer are spirally wrapped with approximately 25% overlap along the axis of the piping run.

2. All 2K piping and thermal heat station straps shall be wrapped in this fashion.

JL0151901-SOW, R1 Print Date:10/6/2025 Page 13 of 16

3. Shield piping is either left bare within the shield boundary or covered with MLI if not enclosed within the shield.

12.3.3 Heat station straps require MLI and must be individually wrapped.

12.4 Quality Assurance Provision (QAP)

The subcontractor shall provide JLAB with a written quality control tracking system prior to subcontract award. This written document shall include, but is not limited to, the following:

12.4.1 Inspection and sign-off of raw material certifications.

12.4.2 Periodic inspection and sign-off of processes performed throughout fabrication.

12.4.3 Inspection and sign-off of dimensional tolerance checks.

12.4.4 Inspection and sign-off of adherence to JLAB specifications.

12.4.5 Provision for unannounced access to fabrication location and process by identified JLAB personnel for purpose of conducting quality control audits.

12.4.6 Each brazed or welded joint, interior or exterior shall be examined by at least one form of

Nondestructive Testing (NDT) in compliance with the ASME B31.3 code. Any exceptions must be approved by JLAB.

12.4.7 All inspections shall include date, time, name of examiner/inspector, and signature.

12.4.8 Creation of a Non-Compliance Report (NCR) for any item that fails to meet the given specifications.

12.5 Documentation

12.5.1 Vendor shall neatly organize the documents to be submitted for final acceptance. Table of contents, checklists, summary tables are recommended. The format of documentation package shall be discussed with JLAB after award. Digital documents vs paper copies are preferred.

12.5.2 Copies of WPS/BPS, the PQRs being used, and the WPQ/BPQ for the WPS/BPS’s being used shall be provided to JLAB as part of the bid package.

12.5.3 Copies of certified qualifications in accordance with ASNT SNT-TC-1A or equivalent for personnel performing visual examination and leak checking NDE of welds shall be provided to

JLAB as part of the bid package.

12.5.4 Production timeline for fabrication, starting from time of award running through F.O.B. JLAB.

Following JLAB approval of timeline and contract award, it is the responsibility of the contractor to comply with and meet dates specified in approved timeline. This timeline shall be provided to JLAB as part of the bid package.

12.5.5 Seller’s general Quality Assurance and Quality Control manuals shall be submitted as part of the bid package. The general QA/QC manuals shall address at a minimum the following elements: training and qualifications, improvement process, documents and record control program, control of procedures, design control, procurement control, inspection and test program and management assessment program. Templates of travelers, procedures, sign-off forms, etc. shall be submitted. In addition, a Project specific Quality Assurance Provision (QAP) as stated in section 4.0 shall be provided after award prior to production.

12.5.6 Certified mill test reports (CMTR) of all raw materials used to fabricate deliverables shall be provided to JLAB prior to the final acceptance of deliverables by JLAB. These material certifications shall include all processes and tests with grade and composition being clearly identifiable. A summary table linking the CMTRs and components shall be supplied to JLAB.

12.5.7 Copies of all in-process inspection and test reports shall be provided to JLAB prior to the final acceptance of deliverables by JLAB. These include weld maps, in-process weld report, pressure test report, cold shock report, leak check report, final dimensional inspection report, temperature sensors check-out report and any other reports derived from the project specific

QAP.

12.5.8 Records of CERNOX temperature sensors serial numbers, corresponding locations and the hosting CIC serial number shall be provided to JLAB prior to the final acceptance of deliverables by JLAB.

12.6 Cleanliness

JL0151901-SOW, R1 Print Date:10/6/2025 Page 14 of 16

12.6.1 Subcontractor shall adhere to Sec. 5.1 cleaning and handling specifications (11141-S-0028 Rev.

C, 11141-S-0034 Rev. B, 11141-S-0035 Rev. B) and the following specific requirements.

12.6.2 Cleaning of internal surfaces of piping, vessels, valves, and devices shall meet requirements for normal refrigeration and/or cryogenic equipment not exposed to liquid air or oxygen. The subcontractor shall submit cleaning procedures for JLAB approval prior to fabrication.

12.6.3 All flux residues from brazed or soldered connections, all weld spackle and slag, and all foreign particles shall be removed from the process side surfaces. Visual inspection under bright light shall indicate no moisture, rust, foreign matter, film or accumulation of oil, grease or paint.

12.6.4 Cleaned internal surfaces shall have sufficient protection to maintain the established cleanliness.

12.6.5 MLI shall be protected during assembly, no fingerprints, oils or dust shall be allowed to remain on any surface of the MLI.

12.6.6 No anti-seize compounds shall be used on any assemblies that can be removed by normal handling procedures.

12.6.7 No anti-seize compounds shall be used within the vacuum space that could cause outgassing.

Silver plating and/or the use of dissimilar metals is recommended.

12.7 Serialization & Marking

12.7.1 Serialization

1. CIC Assemblies shall be serialized per SRF-09-PR-002 and the serial numbers (SN) shall be used on all related vendor documents. The SN serves as the main index information to locate vendor supplied technical documentations associated with a certain Cryogenic Interface Can.

2. Any loose parts shall be delivered in sealed bags labeled with their drawing number and CIC top assembly SN.

12.7.2 Marking

1. The Seller shall inscribe all parts with clear markings (0.25" high characters) such that a visual inspection will provide traceability and fast identification. Identification applies to the smallest mechanically removable component. At a minimum, the markings shall include the drawing part or identifying number. The markings may also include identification of the component’s source (i.e. contractor / subcontractor), material specification, and any other information that will allow for immediate recognition of said components and their source. Purchased parts are excluded from this requirement

12.7.3 Nameplate

1. Each CIC assembly shall have a nameplate bearing the assemblies serial number, date of manufacture, and approximate weight.

Serialize parts using the following format:

XXXXXX-R-SSS

Where:

XXXXXXXXXX = Part Number

R = Drawing Revision

SSS = Serial number of the part

For Example: The ninth “Widget” (JL0031415 Rev-B) fabricated shall be marked:

JL0031415-B-009

JL0151901-SOW, R1 Print Date:10/6/2025 Page 15 of 16

• Adjust the format to use just the serial number if the part is too small for the full number

• If the part is too small for any engraving, ensure that that the packaging is properly labeled with the serial number

12.8 Reporting Requirements

Item Description Frequency Delivery Format Due by

Weekly Update

NCR Reporting

GFM Issues

PRR Meeting

Pre-Ship Meeting

Table 6: Reporting requirements

12.9 Measurement and Test Equipment

12.9.1 The subcontractor shall have a measuring and test equipment program to control and calibrate the accuracy of measurement and test equipment used. The system shall include, as a minimum, prescribed calibration interval, source of calibration and a monitoring system to ensure adherence to calibration schedules. Documentation records in support of this requirement shall be readily available to TJNAF if requested.

13 Preparation for Delivery

13.1 Shipping Preparation

13.1.1 All deliverables, including documentation, shall be catalogued and submitted to JLab prior to shipment.

13.1.2 Shipping documentation must accompany the products such that JLAB receiving personnel clearly understand the contents and can match delivery to a purchase order.

13.1.3 All flanges, connections and openings are to be blocked off, and the Cryogenic Interface Can

(Including all piping, process lines, and insulating vacuum) are to be pressurized to 2-3 psig with clean dry nitrogen.

1. An analog pressure gauge shall be installed on each Cryogenic Interface Can for the purpose of monitoring pressure.

2. Each Cryogenic Interface Can shall be shipped with three (3) total test caps which serve to seal the insulating vacuum space and provide connections to each process line for testing purposes.

13.2 Packaging

13.2.1 Packaging shall be such that no damage is incurred during transit. This shall include weather protection and the closure of all open pipes with test plugs or removable caps.

13.2.2 The packaging shall be such that the equipment remains stable and upright during all phases of transportation and handling. The center of gravity shall be considered in the packaging design to prevent tipping or shifting. The packaging shall be capable of withstanding typical transportation loads and vibrations without compromising the integrity or orientation of the equipment

13.2.3 The packaging shall be designed to allow safe and secure handling using a standard forklift or other typical…

This is the start of the file's text. The full file is on GovTribe.