Jordan RFI questionnaire 15 Nov 2022 SB.docx
DOCX document 23 KB Posted
- Attached to
- Design and Construct Secure Storage Facilities / Muwaffaq Salti AB, Jordan / Request for Information
- Solicitation number
- FY23-Jordan-SSF-Construction-SB
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI JORDAN 15 NOV 2022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information Questions -Jordan Secure Storage Facility
1. Is your firm interested in a Design-Build Construction Contract in Jordan? The magnitude of project size is between $2-$8 million. If no, stop. If yes, continue with the questions below.
2. Do you have experience in Design-Build Construction Contracts?
3. How feasible will it be for your firm to travel to the specific site location multiple times if required?
4. What are the challenges or risks you see for your firm working in Jordan? What would you do to overcome these challenges or risks? What challenges or risks does your firm either anticipate, or have already experienced working in Jordan?
5. Do you have experience in constructing a Secure Storage Facility (SSF) or similar type construction for the secure storage of highly sensitive United States Government material and equipment?
6. Do you have experience installing Electronic Security System / Intrusion Detection Systems (ESS/IDS)? Installation includes commissioning, which would be subject to inspection and certification by the Defense Technology Security Administration (DTSA).
7. Do you have experience in implementing a Contractor Quality Control Systems (CQCS) Plan as part of the construction contract, with an independent CQCS team to inspect, test, monitor, commission and control all aspects of quality control during construction?
8. This project has a relatively short turnaround time. How adaptable are you to an accelerated schedule?
9. How soon could your firm begin work in Jordan if awarded this requirement?
10. Do you have on staff engineers from a variety of disciplines who would be able and willing to travel to Jordan for several weeks at a time?
11. Do you have someone on staff who speaks/reads/writes Arabic that would be a part of the on-site construction team?
12. Is your firm capable of obtaining the necessary passport and visas to bring not only US personnel but third country nationals into Jordan to work on-site for a long-term basis?
13. Is there any other information of interest that your firm would like the Government to know?
14. What type of Small Business categories does your firm have within the applicable NAICS code?