The document is a set of material specifications from the Massachusetts Bay Transportation Authority (MBTA) Maintenance of Way (MOW) Division related to a state and local contract opportunity. The specifications detail the required materials and processes for 132RE restraining rail joint bar sets, 115RE 24" 4-hole joint bars, and 115RE 36" 6-hole joint bars. The materials must conform to AREMA standards and be inspected by a qualified independent agency prior to shipment. Shipment and delivery details, including advance notification requirements, are provided. Rejected materials will be returned to the supplier at their expense. The related state and local contract opportunity is IFB 128C-24 Joint Bars, with an opening date of 08/09/24, issued by the MBTA for the state of Massachusetts.
The specifications do not include pricing terms, set asides, information on incumbents, funding sources, or other commercial details. The focus is solely on the technical requirements and logistics for delivering the specified joint bar materials to the MBTA Charlestown Rail Shop.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB 128C-24 Joint Bars.pdf | ||
| IFB 128C-24 Insurance requirements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MBTA M.O.W. Division
Material Specification
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
MAINTENANCE OF WAY DIVISION
TRACK MATERIAL SPECIFICATION
132RE Restraining Rail Joint Bar Set with D” Bar
MATERIALS
Each Set to included:
1 – 24” long heavy reinforcing “D” bar to be used in conjunction with standard AREMA, 4 hole, Quenched Carbon steel Joint Bar for new 132# RE section steel rails with a milled base. “D” bar material to meet ASTM A36 Specifications. Bar to be manufactured in accordance with dimensions shown on MBTA, M.O.W. Division Drawing number 330.
1 – 24” toeless, head free bar for 132 lb rail section, track bolts, nuts and washers in quantity as dictated by the specified joint bar length (4 sets). All material and processes shall be in accordance with the current AREMA manual for Railway Engineering, Chapter 4, Part 2 – Specifications for Quenched Carbon Steel Joint Bars. EXCEPT toeless standard bar will include 4 oval hole and no round holes.
Track bolts and nuts material and manufacture shall be in accordance with the current
AREMA Manual, Chapter 4, Part 2 – Specifications for Heat-Treated Carbon Steel Track
Bolts and Carbon Steel Nuts.
DESIGN
This document is for the procurement of 24’ long, 1” thick, heavy reinforcing “D” bar, steel 132 RE joint bar, bolts, nuts, lock washers. Shims, steel 115RE rail and 132RE rails are shown for informational purposes only.
INSPECTION
The bidder shall be responsible for engaging the services of a qualified, independent inspection agency, approved by the Authority, for in-plant inspection of the material specified herein. Services shall include visual inspection and physical measurements of the material, as well as review of the plant records to insure compliance with the plans and specifications. All costs incidental to the inspection services shall be included as part of the bid proposal. Inspection and laboratory reports are to be forwarded to the individual named below for review prior to scheduling the materials for shipment.
April 18, 2013
SUBMITTALS
Prior to fabrication, the fabricator shall submit detailed shop drawings of the restraining rail joint bar to the authority for approval. Submit to:
SHIPMENT
All materials are to be shipped via motor freight to the following location during the hours (8:00 AM to 1:00 PM Monday through Friday), Conformation of delivery time and date must be given at least twenty-four (24) hours in advance during the same business hours. Shipment shall be directed to the following individual:
Supervisor of Yard Services
21 Arlington Avenue
Charlestown, Massachusetts 02129
(617)222-5290
DELIVERY
To be accepted, the rails delivered to the MBTA shall conform to these Specifications in all respects. Material is at the supplier’s risk until accepted at the specified delivery site by an authorized representative of the MBTA. Material rejected for non-compliance with these Specifications will be returned to the supplier wholly at the supplier’s expense.
MBTA Maintenance Of Way 21 Arlington Ave - Building 2
Charlestown, MA 02129
April 18, 2013
M.O.W.
DIVISION
132 RE RESTRAINING RAIL
JOINT DETAILS
qchung Highlight qchung Highlight
Revision Date: 3/24/2021
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
115RE, 24”, 4 Hole, Shaved Joint Bars
115 RE, 4 Hole, Quenched Carbon Steel Joint Bars shall conform to the following specifications in the A.R.E.A. Manual for Railway Engineering Volume 1 in the rail section. Except as Modified in Drawing MBTA 321
1) Chapter 4 Part 3 :
Joint Bar Assembly for 115 RE and 119 RE Rail
Section 3.1 General Characteristics of a Rail joint
Section 3.2 Joint Bars and Assemblies, Figure 4-3-1
Section 3.3 Rail Drillings, Bar Punchings and Bolts, Table 4-3-1 and Figure 4-3-8
Section 3.4 Specifications for quenched Carbon-Steel Joint
Bars, Microalloyed Joint Bars, and Forged Compromised
Joint Bars
4.3.1 – 4.3.14
Joint bars shall be in accordance with the latest edition of the AREMA Portfolio of Trackwork plans for 4 hole joint bars and modified as listed below. Length of bar shall be 24” and hole punching will be following:
A pair of joint bars shall consist of 2 bars, the shaved bar, as shown on MBTA drawing 321, shall have all round holes, and the second bar shall have all oval holes.
Inspection shall be in accordance with the inspection procedures outlined in the AREMA
Manual.
Joint bars shall be stacked neatly on pallets and securely banded with a sufficient number of 2” x 0.05” heavy duty steel bands to prevent the bars from shifting on the pallet while in shipment or being handled upon receipt.
Material shall be delivered via road to the MBTA Charlestown Rail shop, 21 Arlington
Ave, Charlestown, Massachusetts.
Notification of delivery is to be made two (2) business days in advance to rail shop supervisor, (617) 222-5290.
Inspection and testing shall be in conformance with the inspection procedures outlined in the current AREMA Manual, Chapter 4, Part 2.
Revision Date: 3/24/2021
Prior to shipment, the manufacturer or supplier shall submit certified inspection and test reports as required.
Joints shall be wired into matched pairs, palletized and strapped for shipment.
To be accepted, all material specified herein shall conform to these Specifications in every respect. Material is at the supplier’s risk until accepted at the specified delivery site by an authorized representative of the MBTA. Material rejected for non-compliance with these Specifications will be returned to the supplier wholly at the supplier’s expense.
M.O.W.
DIVISION
JOINT BAR DETAILS
FOR 115 RE SECTION RAIL
Revision Date: 3/6/18
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
115RE, 36”, 6 Hole, Joint Bars
115 RE, 6 Hole or 4 Hole Quenched Carbon Steel Joint Bars shall conform to the
MBTA, MOW Drawing number 320 for 6 hole joint bar and number 321 for 4 hole joint bar and also conform to the following specifications in the A.R.E.A. Manual for Railway
Engineering Volume 1 in the rail section.
1) Chapter 4 Part 3 :
Joint Bar Assembly for 115 RE and 119 RE Rail
Section 3.1 General Characteristics of a Rail joint
Section 3.2 Joint Bars and Assemblies, Figure 4-3-1
Section 3.3 Rail Drillings, Bar Punchings and Bolts, Table 4-3-1 and Figure 4-3-8
Section 3.4 Specifications for quenched Carbon-Steel Joint
Bars, Microalloyed Joint Bars, and Forged Compromised
Joint Bars
Section 4.3.1 – 4.3.14
Inspection shall be in accordance with the inspection procedures outlined in the AREMA
Manual.
Joint bars shall be stacked neatly on pallets and securely banded with a sufficient number of 2” x 0.05” heavy duty steel bands to prevent the bars from shifting on the pallet while in shipment or being handled upon receipt.
Revision Date: 3/6/18
Material shall be delivered via rail or road to the MBTA
Charlestown Rail shop
21 Arlington Ave.
Charlestown, Massachusetts 02129
(617) 222-5290.
Notification of delivery is to be made two (2) business days in advance to Rail Shop manager, (617) 222-5290.
Inspection and testing shall be in conformance with the inspection procedures outlined in the current AREMA Manual, Chapter 4, Part 2.
Prior to shipment, the manufacturer or supplier shall submit certified inspection and test reports as required.
Joints shall be wired into matched pairs, palletized and strapped for shipment.
To be accepted, all material specified herein shall conform to these Specifications in every respect. Material is at the supplier’s risk until accepted at the specified delivery site by an authorized representative of the MBTA. Material rejected for non-compliance with these Specifications will be returned to the supplier wholly at the supplier’s expense.
. O~I!I Of)
I- ~ RAIL
T I t 14"R
<i. OF BOLT
NEUTRAL
AXIS
:"I~
-I'" Of)
I" 2
SECT ION
Ñ :"',e
II! '"
11/
II /"
.ft' ,./& "0." (0'."'..' !tI.:" I r 11/6 A ~ If'!:- /1/6 þr
~ ~ t .. ~ . -
- T -
- "J------ - - ~- :1---- ___I_I- ----- _L -'---
PLAN
N
36' l'
'ð è-
~' fo" ~'1 .1 to fo"
\.i!
,,"ß-JIY,~'
ELEVATION
:s N
NOTE'.S:
(/):1"oi"'1'1- &rs +0 be. ;Þ'\ at::c.o~d4Þ'\C~ wi/-t.. CLO-r-e.Ylf- A~6VlA "~peG,'f','C4I-,.OI'1-;' ror QUe.J'lc;.hit-a. a:.,..boÞ\ ~fee.( :JõiÞ'lr BGi"'s .', ~.:1oiYl-f-l!>cu"s fD be.. SJ,D,..f íóe. .ç,rld He4d-(ree-. de-~"'Jh. Bar:s Sl1or.vÞ'l cll"e. ror u'!>e. "'..II'ft, I" e../I,pf/c..ei/ neck-1-1"4e::..1c- hoffs.
'T"~ruu'E
M.O.W. ~;" 320 þ'" I ~IOÑ ISSI4t:
ND.-
TOINT BAR OE.TA/L5
-For II 5 RE. SECTION R-AJ L
/)lr-ecfor- M.O."".
qchung Rectangle
File details come from the government source that posted it. Updated .