This is a Justification and Approval (J&A) document for other than full and open competition due to unusual and compelling urgency at the James H. Quillen VA Medical Center in Mountain Home, TN. The document justifies sole-source award to Taylor Construction Services, LLC for emergency repairs to hurricane-damaged soffits on Building 160.

The scope includes removal and replacement of approximately 3,500 square feet of damaged aluminum linear soffit system and hat channels on the South/Southwest face of Building 160, caused by Hurricane Helene. The contractor will install new heavier gauge structural steel hat channels and a Rockfon Planar Linear Panel System to match existing components. The period of performance is 120 calendar days from Notice to Proceed, with an estimated cost of $1,040,000. The VA is using FAR 6.302-2 (Unusual and Compelling Urgency) as the authority, citing immediate safety concerns from dangling components 75 feet above grade and potential catastrophic roof failure that could make the building uninhabitable. The building houses critical hospital functions including domiciliary patients, mental health clinic, primary care, and the main kitchen.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAPG Part 806.3 OFOC Page 1 of 5 Revision: 03 Effective Date: 04/15/24 Acquisition ID#: 36C249-25-AP-0217

DEPARTMENT OF VETERANS AFFAIRS

Justification and Approval (J&A) For

Other Than Full and Open Competition (>SAT)

Acquisition Plan Action ID: 36C249-25-AP-0217

1. Contracting Activity: Department of Veterans Affairs, VISN 9, Network Contracting Office (NCO) 9, James H. Quillen VA Medical Center (Mountain Home), 2237 #-621-25-1- 5117-0001.

2. Nature and/or Description of the Action Being Processed: Mountain Home has an urgent need to repair hurricane damage to soffits and replace affected components. Recent storms and high winds brought about by Hurricane Helene severely damaged a large portion of the building 160 soffit located on the South/Southwest face of the building. It is recommended that all the linear soffits and backing hat channel in the damaged areas are removed and replaced with new to match existing. Removal and replacement of existing hat channels with heavier gauge equivalent size hat channel, with reduced spacing, and new hat channel screws are required. This should address future wind loading needs and extend the useful life of this building system.

Mountain Home is proposing a new, Firm Fixed Price (FFP) contract be awarded to Taylor Construction Services, LLC for the emergency repair to soffits and affected components.

3. : The scope of work for project # 621-25-102 consists of providing all equipment, materials, labor, superintendence, safety, quality control, and administrative oversite to perform work safely and promptly for VA Project # 621-25-102 Emergency Repair Building 160 Soffit at the James H. Quillen VA Medical Center, Mountain Home, TN. The project will include:

a. Removal of existing aluminum linear soffit system and hat channels used to attach to structure. Soffit area is approximately 3500 sf, but contractor should verify exact quantities prior to bidding.

b. Provide and install new heavier structural steel hat channel conforming to AISI S240-

#12 x 1- -tapping sheet screws. Confirm Fasteners size and type with manufacturer.

c. Provide and install NEW replacement soffit system components matching existing.

Existing linear soffit system by Rockfon - Planar Linear Panel System, Open Reveal Panel Round Edge (RND) w/ filler strips (NOT integral), and closure caps and trim.

Instal -zinc coated, self-tapping sheet screws or as recommended by manufacture. Match existing color and layout.

d. Contractor to provide all access platforms and equipment, fall protection, roof protection, construction fencing/barriers, signage, and the like. Construction shall be safely performed in accordance with the latest revision of OSHA 1926 and other local requirements.

VHAPG Part 806.3 OFOC Page 2 of 5

Acquisition ID#: 36C249-25-AP-0217

The Period of Performance shall be 120 calendar days from Notice to Proceed. The total cost of this requirement is estimated at $1,040,000.00.

4. Statutory Authority Permitting Other than Full and Open Competition:

( ) (1) Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements per 41 USC §3304(a)(1) as implemented by FAR 6.302-1;

( x ) (2) Unusual and Compelling Urgency per 41 USC §3304(a)(2) as implemented by FAR 6.302-2;

( ) (3) Industrial Mobilization, Engineering, Developmental or Research Capability or Expert Services per 41 USC §3304(a)(3) as implemented by FAR 6.302-3;

( ) (4) International Agreement per 41 USC §3304(a)(4) as implemented by FAR 6.302-4 ( ) (5) Authorized or Required by Statute per 41 USC §3304(a)(5) as implemented by FAR

6.302-5;

( ) (6) National Security per 41 USC §3304(a)(6) as implemented by FAR 6.302-6;

( ) (7) Public Interest per 41 USC §3304(a)(7) as implemented by FAR 6.302-7;

5.

Acquisition Requires the Use of the Authority Cited Above (applicability of authority):

Due to Hurricane Helene, one half to two thirds of th soffit area was ripped away from its roof supports. Material has fallen away from the building s structure, landing on lower roofs, and or blown into adjacent parking lots and roads. Upon investigation by the facilit s engineering office, the remainder of the South/Southwest soffit areas showed similar failure. It has been determined that aluminum linear soffit system screws have pulled out of the metal hat channel backing supports used to attach the building soffits to the structure.

The nearby area has undergone many changes including a two-phased construction of a 4-story parking structure to the southwest of building 160. Due to the orientation of building 160, the normal northeast wind patterns, and the new parking structure, it is likely this combination that has created a wind tunnel effect that has placed sustained wind loading in excess of the building original design and as a result the soffits only on the Southwest/Southeast faces of building 160 have shown this damage.

Failure to correct this issue could subject the main roof structure to uplift forces from the wind that are above design limits. This could lead to catastrophic failure of the main roof system and make the entire building uninhabitable. This building houses the domiciliary patients, mental health clinic, primary care, and the main kitchen for the hospital. If we were to lose this building all of these functions would be lost.

This procurement action is classified as an EMERGENCY due to the fact that existing soffit system component are dangling from the structure more than 75 feet above the surrounding grade and many other areas in this location are showing similar signs of failure. These conditions are a major safety issue and could lead to lose of life or property.

6. Description of Efforts Made to ensure that offers are solicited from as many potential sources as deemed practicable: Taylor Construction Services (TCS) is the only source being solicited at this time due to the unusual and compelling urgency of this specific requirement. All routine non-emergency requirements are and will continue to be publicized and competed amongst SDVOSB entities.

VHAPG Part 806.3 OFOC Page 3 of 5

Acquisition ID#: 36C249-25-AP-0217

7. Determination by the Contracting Officer (CO) that the Anticipated Cost to the Government will be Fair and Reasonable: Only one source is being solicited due to the unusual and compelling urgency of this requirement. The CO anticipates determining the price to be fair and reasonable based on a comparison to previous award prices for similar projects (listed below) which were determined fair and reasonable either by competition or comparison to Independent Government Cost Estimate (IGCE). The IGCE for this requirement is $1,040,000.00.

Contract Number

Project Number

Description Award

Amount Award Date

36C24923C0098 621-22-115 Replace Buildings 160 & 77 Lower

Roofs $1,559,268.00 8/24/2023

36C24922C0078 621-21-115 Replace Bldg. 204 Roof Phase 2 $866,000.00 5/19/2022

36C24922C0052 621-22-112 Replace Bldg. 77 Roof $677,250.00 3/11/2022

36C24921C0062 603-18-301 Replace Roofs Phase 1 $2,113,112.00 5/13/2021

36C24919D0061 / 36C24921N0388

626A4-18-103 Replace Roofs Bldgs. # 11 & 107 -

ACY

$1,598,713.00 3/26/2021

8. Description of the Market Research Conducted and the Results, or a Statement of the Reasons Market Research Was Not Conducted: Due to the unusual and compelling urgency of this requirement, the proposed source for this action is TCS. Taylor meets the eligibility criteria outlined in VAAR 819.7003(DEVIATION), is active in sam.gov and VetCert, and is represented as small for the applicable NAICS code, 238170-Siding Contractors with a small business size standard of $19M. No further market research was conducted because Taylor was found responsible and is a SDVOSB. TCS is located approximately 20 miles from the Mtn Home VAMC. The Contracting O Representative and CO are familiar with TCS and know they are reputable and have a good work record.

9. Any Other Facts Supporting the Use of Other than Full and Open Competition: None.

10. Listing of Sources that Expressed, in Writing, an Interest in the Acquisition: Not applicable.

11. A Statement of the Actions, if any, the Agency May Take to Remove or Overcome any Barriers to Competition before Making subsequent acquisitions for the supplies or services required: Market Research was conducted on the VetBiz database and the Dynamic Small Business Search (DSBS) for all SDVOSB entities in Tennessee and its bordering states. For NAICS 238170-Siding Contractors, VetBiz revealed 59 SDVOSB entities and DSBS revealed 153 SDVOSB entities. But, due to the nature of this requirement, and staff, this procurement needs to be procured as a sole source emergency requirement. By awarding as quickly as possible, the hurricane damage can be repaired and replaced, whereby preventing injury to persons or further damage to the facility. The initial market research conducted for this requirement can be utilized for future competition for similar future acquisitions if they arise.

12. Reguirements Certification: I certify that the requirement outlined in this justification is a 'Bona Fide Need of the Depat1ment of Veterans Affairs and that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and belief.

KEVIN

MILLIKEN

Dlgltally signed by KEVIN

MIWKEN

Date: 2024.11.12 13:03:27 -<l5'00'

Kevin R. Milliken Chief Engineer James H. Quillen VA Medical Center Mountain Home, TN

Date

13. Aeerovals in accordance with the VHAPM Part 806.3 OFOC SOP:

a. Contractin,2 Officer Certification (!eguired}: I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.

VANCE

ROSEBUSH

Dlgltally signed by VANCE

ROSEBUSH

Date: 2024.11.1213:15:17 -06'0 0'

Vance Rosebush Date Contracting Officer Construction Network Contracting Office (NCO) 9

11/12/2024

b. One Level Above the Contractin,2 Officer - Branch Chief {Reguired over SAT but '.not exceedin&, $7S0K}: I certify the justification meets requirements for other than full and open competition.

Dlgltally signed by DEAN

DEAN REGAZZI ::��4.11.1223:12,44

Dean J. Regazzi Branch Chief Construction

-06'00'

Network Contracting Office (NCO) 9

Date

c. Division Chief: I certify the justification meets requirements for other than full and open competition.

Digitally signed by ICENNE'TH KENNETH HOOKS HODl<S

Date: 2024.11.19 07'.29:11 .(16'00'

Kenneth N. Hooks, Jr.

Division Chief Division B - Specialty Support Network Contracting Office (NCO) 9

VHAPG Part 806.3 OFOC Revision: 03 Effective Date: 04/15/24 Acquisition ID#: 36C249-25-AP-0217

Date

Page 4 of5

VHAPG Part 806.3 OFOC Page 5 of 5

Acquisition ID#: 36C249-25-AP-0217

d. Director of Contracting: I certify the justification meets requirements for other than full and open competition.

Susan F. Nagel Date Director of Contracting Network Contracting Office (NCO) 9

e. VHA RPO HCA Review and Approval: I have reviewed the foregoing justification and find it to be complete and accurate to the best of my knowledge and belief and recommend approval (if over $75 million) or approve ($750K to $75 million) for other than full and open competition.

Daryl A. Berg Date Executive Director Regional Procurement Office Central

11/25/2024