This document is a Justification for Other Than Full and Open Competition (JOFOC) for NASA's Range Operations Contract II (ROC-II) with KBR Wyle Services LLC. NASA Goddard Space Flight Center/Wallops Flight Facility is seeking a six-month sole-source contract extension from August 10, 2025, to February 9, 2026, with a current contract value of $250M. The extension is necessary to maintain continuity of critical range operations, including sounding rocket campaigns, Department of Defense missions, and maintenance of specialized launch and test facilities.

KBR is being awarded the extension due to their unique qualifications as the incumbent contractor, possessing critical heritage knowledge of safety and mission-critical systems. The extension will support ongoing operations for NASA and other customer projects like RocketLab, Antares, and DoD Mission Partners. A notice was posted on Sam.gov from May 15-30, 2025, which received zero responses, and the follow-on Wallops Range Contract (WRC) is currently on hold pending NASA Headquarters review. The contractor will be required to submit updated cost proposals and rate matrices for the extension period, which will be evaluated to ensure fair and reasonable pricing.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev.:4/2023

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

Goddard Space Flight Center/Wallops Flight Facility (GSFC/WFF)

JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION

(JOFOC)

For Range Operations Contract II (ROC-II), Contract 80GSFC19C0013 Extension

– CY7

1. Federal Acquisition Regulation (FAR) 6.303-2(b)(1) – Identification of the agency and the contracting activity, and specific identification of the document as a “Justification for other than full and open competition.”

This document is a justification for other than full and open competition prepared by

National Aeronautics and Space Administration (NASA) Goddard Space Flight Center/Wallops Flight Facility (GSFC/WFF).

The procuring agency is the National Aeronautics and Space Administration (NASA) and the contracting activity is Goddard Space Flight Center/Wallops Flight Facility (GSFC/WFF).

2. FAR 6.303-2(b)(2) – The nature and/or description of the action being approved:

This justification provides the rationale for contracting by other than full and open competition to award a six (6) month sole source extension to contract number 80GSFC19C0013 with KBR Wyle Services LLC for continuation of services under the NASA Range Operations Contract II (ROC-II).

The current ROC-II contract was awarded on August 10, 2019, and expires on August 9, 2025. Award of the follow-on contract, Wallops Range Contract (WRC) is currently on hold and pending further review by NASA Headquarters. This extension will allow time for agency level determination of next steps and evaluation of resources.

The Wallops Range has an extremely busy and often shifting schedule, management of which are vital to the agency, the center, and other federal and private business partners, and customers. This includes sounding rocket campaigns, Department of Defense missions and support, and maintenance and sustainment operations. Successful outcomes for these missions depend on the heritage knowledge of safety and mission critical systems, the management structure, and the personnel with mission specific knowledge currently supporting the Range. The extension being requested will allow continuity of critical operations through this period while the future of the follow-on contract is being evaluated.

3. FAR 6.303-2(b)(3) – A description of the supplies or services required, to meet the

Agency’s needs (including the estimated value):

The ROC-II contract provides Wallops Range operations and maintenance; support services;

training; command, control, communications, information, and computer systems services;

testing, modifying, and installing communications and electronic systems at launch facilities, launch control centers and test facilities; range sustaining engineering services, and ground operations support.

In order to provide current and future support, the ROC-II contract also provides ongoing preventive and corrective maintenance and sustaining engineering tasks to ensure readiness and mitigate the effects of obsolescence of current Range equipment, systems, and infrastructure.

The current contract value is $250M with current obligations of $202,667,752 and an overall task order awarded value of as of modification P00109 and the last task order issued. The Government’s cost estimate for the planned extension is thus an increase in the contract value is not required as this amount can be absorbed within the current available contract ceiling of . The planned extension performance period is August 10, 2025, to February, 9, 2026.

4. FAR 6.303-2(b)(4) – An identification of the statutory authority permitting other than full and open competition:

The statutory authority permitting other than full and open competition is 10 U.S.C.

3204(a)(1), as implemented by FAR 6.302-1(a)(2)(iii)(A) and (B), only one responsible source and no other supplies or services will satisfy agency requirements.

5. FAR 6.303-2(b)(5) – A demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited:

The rationale supporting the use of 10 U.S.C. 3204(a)(1) is only one responsible source and no other supplies or services will satisfy agency requirements as implemented by FAR 6.302- 1(a)(2)(iii)(A) and (B) as further described below.

A sole source award to KBR for a 6-month extension is necessary due to the critical and unique nature of the work being performed under this contract. KBR has the combined training, experience, and expertise to provide uninterrupted continuation of mission critical support as they are the incumbent contractor. Since the functions under the ROC-II contract are to be continued, detailed knowledge of the existing ROC-II requirements greatly aids the contractor’s ability to effectively, and efficiently manage the ongoing tasks, projects, and mission sets in a safe, timely manner during the planned extension period. This will benefit the Government through lower cost and reduced technical and mission risk. KBR is the only source that is qualified to perform this work within the needed time frame due to the immediate need for these services and requirement for uninterrupted continuation of support.

A sole source award to KBR for the contract extension period is necessary due to the need for technical and management continuity for in-process maintenance and sustainment activities, scheduled NASA Sounding Rocket mission support, and support of all NASA customer projects (RocketLab, Antares, DoD Mission Partners) scheduled during the extension period. Lack of support throughout the extension period can result in mission delays or cancellations, precipitating in possible loss of use for critical Government assets, increased safety risk, or increased cost due to mission slips.

The main goal of the ROC-II contract is to provide Wallops Range operations and maintenance; support services; training; command, control, communications, information and computer systems services; testing, modifying and installing communications and electronic systems at launch facilities, launch control centers and test facilities; range sustaining engineering services, and ground operations support. It takes unique skills and abilities to support NASA missions and customers, while understanding the specialized assets and equipment deployed all over the world requiring specific training and certifications to operate. The incumbent contractor has the workforce with the demonstrated capability of executing the complex nature of ROC-II contract.

6. FAR 6.303-2(b)(6) – A description of the efforts made to ensure that offers are solicited from as many potential sources as practicable, including whether a notice was or will be publicized as required by Subpart 5.2 and, if not, which exception under 5.202 applies:

A notice to the Government Point of Entry (GPE) website (Sam.gov) was published on May 15, 2025, in accordance with FAR Subpart 5.2. This posting informed potential sources of NASA’s intent to award this sole-source extension to KBR. The results of this synopsis are summarized in Section 10 below.

7. FAR 6.303-2(b)(7) – A determination by the contracting officer that the anticipated cost to the Government will be fair and reasonable:

The Contractor will be required to submit a cost proposal to be evaluated and negotiated by the Government for the proposed extension period. There are currently no CY7 rates (direct labor, indirect rates, or fee rates) in the ROC-II contract. KBR will be required to submit an updated rate matrix as part of their proposal package for the proposed extension period. Prior to execution of the formal contract modification extending the ROC-II contract a proposal analysis will be performed to ensure that all proposed rates and any agreed to pricing is fair and reasonable. The proposed costs will be evaluated by the Contracting Officer, Contracting Officer Representative, Technical Management, and Resource Analyst to determine that the direct labor rates, skill mix, other direct costs, indirect costs, and fees are fair and reasonable.

8. FAR 6.303-2(b)(8) – Description of the market research conducted, and the results, or a statement of the reasons market research was not conducted:

An analysis was performed and review of current General Services Administration Schedules and the NASA Office of Procurement Strategic Sourcing Repository (NFS 1805.70) for existing contracts capable of meeting the requirements as defined in the SOW and found no schedule available that meets our requirements. Formal market research was not conducted for this requirement, as this would be a duplication of effort already conducted for the new

WRC contract which is currently on hold. There is no known company that can establish the necessary processes, controls, specific management structure, and historical technical knowledge in the allotted time frame and for the minimal duration required without an unacceptable delay to mission critical support and cost impact to the Government.

9. FAR 6.303-2(b)(9) – Any other facts supporting the use of other than full and open competition:

None.

10. FAR 6.303-2(b)(10) – A listing of the sources, if any, that expressed an interest in writing in the acquisition:

A notice of NASA’s intent to award this sole-source action was synopsized on the GPE website (Sam.gov) per FAR Subpart 5.2 (See Section 6 above). The synopsis was posted for 15 days from May 15, 2025, to May 30, 2025, the government received zero (0) responses.

11. FAR 6.303-2(b)(11) – A statement of actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required:

The Agency planned a follow-on acquisition that was conducted as a competitive full and open procurement that was put on hold.

Range Operations Contract II (ROC-II) Extension – CY7

JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION

SIGNATURE PAGE

Technical Representative: I certify that the facts presented in this justification are accurate and complete.

Nick Maxim Technical Representative, ROC-II COR

Contracting Officer: I hereby certify that the above justification is complete and accurate to the best of my knowledge and belief.

Aaron Case Contracting Officer

John Maxim Digitally signed by John Maxim Date: 2025.05.19 11:41:02 -04'00'

Aaron Case Digitally signed by Aaron Case Date: 2025.05.19 11:43:08 -04'00'

File details come from the government source that posted it. Updated .