JOFOC_68HERW26P0239.pdf

PDF 310 KB Posted

Attached to
Provide Seawater System Maintenance
Solicitation number
Sole_Source_JOFOC_68HERW26P0239
Issued by
Not on record

About this file

This is a Justification for Other than Full and Open Competition document filed by the U.S. Environmental Protection Agency's Office of the Chief Procurement Officer, Water, Tribal, and Science Division.

The EPA is procuring operations and maintenance services for an agency-owned laboratory seawater pumping and holding system located in Newport, Oregon. The system provides raw and filtered seawater to laboratories for various research projects at the Hatfield Marine Science Center. The period of performance consists of a 12-month base year plus four 12-month option years. Operating and maintenance expenses are allocated based on proportional usage and seawater delivery, currently apportioned at 88% to Oregon State University and 12% to the EPA, with adjustments as necessary. The contracting officer has determined the anticipated cost to be fair and reasonable based on complete cost analysis using previous history and Contracting Officer's Representative knowledge.

This acquisition qualifies as a single source procurement under FAR 6.103-1(b)(1) because Oregon State University is the only reasonable source available. The justification cites a 1988 agreement between EPA and Oregon State University that provided land at the Marine Science Center for EPA to construct a coastal research facility. In exchange, EPA agreed to build a library for the Center and construct the seawater system. Although owned by EPA, the seawater system is an integral part of the Hatfield Marine Science Center, which is under University control, making Oregon State University the sole source for operations and maintenance. No market research was conducted, no competing sources expressed interest, and no actions are planned to remove barriers to competition for subsequent acquisitions. The justification was signed by Contracting Officer Paige Long on September 28, 2026.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Environmental Protection Agency

Justification for Other than Full and Open Competition

This is a single source acquisition, pursuant to the requirements of RFO 12.102(a): For acquisitions valued at or below the simplified acquisition threshold (SAT), document the decision that only one source is available and the basis of the decision, in accordance with RFO

FAR 6.103(a), see 10 U.S.C. 3204 and 41 U.S.C. 3304.

1. Contracting Activity: Environmental Protection Agency; Office of the Chief

Procurement Officer; Water, Tribal, and Science Division.

2. Nature and/or description of the action: This procurement provides operations and maintenance for the agency-owned laboratory seawater pumping and holding system in

Newport, OR. The period of performance is a 12-month base plus four 12-month option years.

3. Description of the Supplies or Services: This system provides raw and filtered seawater to laboratories for various research projects. The operating and maintenance expenses are based upon proportional usage and seawater delivered which is currently 88% OSU and

12% EPA and adjusts as necessary.

4. Authority: [Check appropriate exception.]

Exception (* = abbreviated) FAR Cite

[x ] Single Source FAR 6.103-1(b)(1)

5. Describe how the contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited: The EPA and Oregon State University entered into an agreement in 1988 which provided land at the Marine Science Center for the Agency to construct a coastal research facility. In return for this land acquisition, EPA agreed to build a library for the Center and construct the seawater system. Although owned by the

EPA, the seawater system is an integral part of the Hatfield Marine Science Center which is part of the Oregon State University system and such is under control of the University, thus making the Oregon State University the only reasonable source available.

6. Describe the efforts made to ensure that offers are solicited from as many potential sources as practicable: N/A

7. The contracting officer determines that the anticipated cost to the Government will be fair and reasonable: A complete analysis of costs using previous history and COR knowledge concludes that the cost is fair and reasonable.

8. Description of the market research conducted (see FAR Part 10). If no market research was conducted, state the reasons: This is a sole source requirement based on an existing agreement between the Hatfield Marine Science Center (HMSC) and the US

EPA for the operation of an agency-owned seawater system that is located on the HMSC

Campus, owned by the University of Oregon.

9. Other facts supporting the use of other than full and open competition.

N/A

10. List sources that expressed, in writing, an interest in the acquisition. If no sources expressed an interest in writing, indicate such. N/A

11. Include a statement of the actions, if any, the Agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required. N/A

12. Contracting officer certification that the justification is accurate and complete to the best of the contracting officer's knowledge and belief.

X Paige Long

Contracting Officer

2026-09-28T08:32:09-0400
PAIGE LONG