JOFOC_19UK5621D0009.pdf
PDF 137 KB Posted
- Attached to
- Hotel Rooms in Support of a VIP Visit
- Solicitation number
- 19UK5621D0009
- Issued by
-
Department of State US Embassy London
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reference DOSAR 606.303-2
SBU - CONTRACTING AND ACQUISITIONS
JUSTIFICATION AND APPROVAL
FOR OTHER THAN FULL AND OPEN COMPETITION, PRICE JUSTIFICATION (JOFOC)
ACQUISITION OF HOTEL ACCOMMODATIONS IN SUPPORT OF SENIOR HIGH LEVEL USG
VIP VISIT
1. I recommend that the Department of State use other than full and open competition for the acquisition of hotel rooms for this VIP visit. The estimated cost is £245,000.00
GBP / $347,900.00 USD (ROE $1.42)
2. Nature and/or description of the action being approved.
Senior High Level USG Principal traveling with a delegation inclusive of support elements in: Security, Communications, Logistics and Operations.
3. A description of the supplies or services required to meet the agency’s needs.
Hotel accommodation at the Hyatt Regency London The Churchill Hotel.
4. An identification of the statutory authority permitting other than full and open competition.
[ X ] 41 U.S.C. 253 (c) (2), FAR 6.302-2; Unusual and Compelling Urgency;
(Based on the available time and urgency of the requirement as detailed below)
Security concerns prohibit sufficient advanced notification of VIP travel to allow for sufficient time to conduct full and open competition. The Department of State can only communicate with the staff at Posts abroad when authorization is given due to security concerns. They have an extremely short turnaround time when authorization has been granted for negotiations to commence and site selections to be finalized with both the local vendors and Posts before the actual Senior High Level USG VIP visit occurs. Security and logistical teams make determinations during the site survey as to which hotels are most suitable for the Senior High Level USG VIP and his traveling staff to remain overnight.
Consideration of the Senior High Level USG Principal and the location are taken into consideration as a determining factor.
The types of events, meetings, locations and availability of venues to support the Senior High Level USG VIP and the delegation are often times designated by the host countries.
Unique requirements for communications support are under severe time limitations and always a determining factor in the selection process as its capacity to be augmented to the unique requirements necessary to support certain Senior High Level USG Principals.
Many of the arrangements for hotel and transportation are often not confirmed until just before the actual visit. In addition to supporting a large delegation within a short time frame, last minute and frequent changes of itineraries for supporting personnel often result in significant changes in how Posts work with the vendors. With the exception of a few trips, contracts are not permitted to be signed until the Department of State (Post) has written confirmation from all supporting agencies, which enables collection of funds from said agencies in the event of cancellation. This results in an unusual and compelling urgency in accordance with 41 U.S.C. 253 (c) (2), FAR 6.302-2.
Multiple sources for providing accommodation are being utilized in support of this visit. The additional sources in London which will be used include:
Intercontinental Hotel Grosvenor House Hotel
5. A demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited.
Security and logistics are the Department of State’s primary considerations when procuring hotel rooms. The Department of State must be able to provide a safe and secure environment for VIP visitors. Frequently VIP visits are not announced or confirmed in sufficient time to conduct a competition, creating an urgent and compelling need. At other times, the security requirements and/or requirements of the host country government limit the acquisition to one or a small number of predetermined hotels.
[ X ] The VIP visit information was not available in sufficient time thereby creating an urgent and compelling need.
[ ] The host country government requires the use of this/these hotel(s).
[ X ] The proposed contractor has the following unique qualifications which meet the Department of State’s security and logistical requirements.
[ ] Set-back (hotel is safe distance from the street)
[ ] Location (able to secure building, travel route; distance to and from event)
[ ] Size and number of rooms (able to house everyone in one hotel) [ ] Conference facilities (adequate space for meetings, press conferences) [ ] Communications (able to install equipment/lines, command center) [ X ] Accommodating to security needs
6. A description of efforts made to ensure that offers are solicited from as many potential sources as is practicable.
Due to urgency and exception in FAR 25.401(a)(5) this solicitation cannot be posted but the JOFOC will be published in FedBizOpps.
No one hotel had sufficient accommodation to cover the needs of the entire visit, and so the following hotels are also being used in addition to this company:
Intercontinental Hotel Grosvenor House Hotel
7. A determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.
Rack rates of the hotels to be used for this requirement, along with rack rates for hotels of a similar star rating and location were gathered during the market survey and in comparing the rates offered and the rack rates, it is determined that the prices offered by The Churchill Hotel for this requirement are fair and reasonable and comparable with alternative accommodation in London for this time of year and for a requirement of this size.
8. Any other facts supporting the use of other than full and open competition.
None
9. A listing of sources, if any, that expressed, in writing, an interest in the acquisition.
None
10. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required.
Post will consider competing some IDIQ hotel contracts, for base (and option years, if possible.
CERTIFICATIONS
I certify that the information in this justification is accurate and contains complete data necessary to support the recommendation for other than full and open competition to the best of my knowledge and belief.
Date: 06/01/2021 P. Ngo Director
I certify that this justification is accurate and complete to the best of my knowledge and belief. Based on my assessment, I conclude that other than full and open competition is justified and the proposed price is fair and reasonable.
C. Adamson Date: 06/01/2021 Contracting Officer
File details come from the government source that posted it. Updated .