JFOC_GS01T13BKD1008.pdf
PDF 407 KB Posted
- Solicitation number
- GS01T13BKD1008
- Issued by
-
GSA Federal Acquisition Service
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION
Contract GS01T13BKD1008
Region 1 RLSA
Applicable FAR Reference: 6.302-1 Only one responsible source and no other supplies or services will satisfy agency requirements.
1. IDENTIFICATION OF THE AGENCY AND THE CONTRACTING ACTIVITY
This justification supports the extension of General Services Administration (GSA)’s Region 1
Regional Local Services Agreement (RLSA) telecommunications contract with TCS of America
Enterprises LLC (TCS America), GS01T13BKD1008. Two of the user agencies with active services on this contract requiring this extension beyond the current end date in order to complete transition to their newly awarded contracts are:
-Department of Homeland Security (DHS), specifically the following components: Customs and Border Protection (CBP), National Law Enforcement Coordination Center (NLECC), Immigration and Customs Enforcement (ICE), Office of the Inspector General (OIG), Transportation Security Agency (TSA), Federal Air Marshall’s Service (FAMS), U.S. Coast
Guard (USCG), U.S. Citizenship and Immigration Service (USCIS), Office of the Under
Secretary for Management (USM), Office of Intelligence & Analysis (I&A), and Office of
Biometrics Management (OBIM), and
-Department of Transportation (DOT), specifically Federal Aviation Administration (FAA)
The respective mission of each agency is noted below:
DHS is responsible for securing the nation's air, land, and sea borders to prevent illegal activity while facilitating lawful travel. The Department relies upon civilian network and internetwork service providers for vital communications services to support and carry out this mission. This mission is accomplished by many different operational and support components to achieve six overarching homeland security missions that make up DHS’s strategic plan which include:
Countering Terrorism and Homeland Security Threats; Securing U.S. Borders and Approaches;
Securing Cyberspace and Critical Infrastructure; Preserving and Upholding the Nation's
Prosperity and Economic Security; Strengthening Preparedness and Resilience; and
Championing the DHS Workforce and Strengthening the Department.
DOT’s mission is to deliver the world’s leading transportation system, serving the American people and economy through the safe, efficient, sustainable, and equitable movement of people and goods. Under the umbrella of DOT’s mission, FAA’s primary aim is to ensure the safety of air passengers, both military personnel and civilians. It promises to ensure that airway passengers reach their destination safely. The mission statement also highlights the efficacy of the aerospace system and makes it the best in the world.
The contracting activity is the General Services Administration (GSA) Federal Acquisition
DocuSign Envelope ID: D344435E-EABC-4AEB-BFE0-8E6077EFABAA
Service (FAS) Information Technology Category (ITC), Office of Acquisition Operations, Interagency Contracts, 1800 F Street NW Washington, DC 20405. This document serves as a justification for other than full and open competition in accordance with FAR 6.302-1, “Only one responsible source and no other supplies or services will satisfy agency requirements”; justified and approved in accordance with FAR 6.303 and 6.304.
2. NATURE AND/OR DESCRIPTION OF THE ACTION BEING APPROVED
The action being approved is to extend the GS01T13BKD1008 contract and any active Task or
Service Orders with TCS America for 12 months, from its current expiration date of May 31, 2025 through May 31, 2026. This extension is necessary so that the agencies served by this contract will be able to conclude their transition to their competitively awarded Enterprise
Infrastructure Solutions (EIS) task orders (see Table 2, in Section 6). Additionally, this extension will align this contract’s expiration date with the expiration dates of GSA’s other legacy telecommunications contracts ending on May 31, 2026.
3. DESCRIPTION OF THE SUPPLIES OR SERVICES REQUIRED TO MEET THE
AGENCY’S NEEDS (including the estimated value)
The extension of the RLSA contract, GS01T13BKD1008, is required to provide services for the agencies in the charts below that receive telecommunications services provided by TCS
America. Specifically, this is for the sole purpose of providing additional time for these agencies to complete their transition to their previously awarded task orders under the EIS contract. The contract extension is not intended to be used for the order of new services.
Contract Ceiling: $45,000,000.00 (no ceiling increase required)
Expenditure to Date: $8,629,466.69
Monthly Cost: $61,982.93
Duration: 12 Months
Total Value of Extension: $743,795.16
LSA Region 1, RLSA Contract: GS01T13BKD1008
Contractor: TCS America
Requiring Agency
Active Service
Instance Records
(SIRs) for Agency
Agency's Anticipated Date for
100% Disconnected
DHS
2,226 05/31/2026
LSA Region 1, RLSA Contract: GS01T13BKD1008
Contractor: TCS America
Requiring Agency
Active Service
Instance Records
(SIRs) for Agency
Agency's Anticipated Date for
100% Disconnected
DOT/FAA 1,471 05/31/2026
Table 1: Service Transition Dates
4. IDENTIFICATION OF THE STATUTORY AUTHORITY PERMITTING OTHER THAN FULL
AND OPEN COMPETITION
The statutory exception to full and open competition is issued under 41 U.S.C. 3304(a)(1) as implemented by FAR 6.302-1, “Only one responsible source and no other supplies or services will satisfy agency requirements”.
5. DEMONSTRATION THAT THE PROPOSED CONTRACTOR’S UNIQUE
QUALIFICATIONS OR THE NATURE OF THE ACQUISITION REQUIRES USE OF
AUTHORITY CITED
5.a. TCS America is the only contractor that can provide these services to these specific agencies for this particular timeframe. TCS America is currently the incumbent contractor for each of the agencies listed above and is providing the listed services. Agencies have awarded their Enterprise Infrastructure Solutions (EIS) task orders in accordance with FAR part 16.505 and are well into their transition off of this TCS America contract and onto their EIS task orders.
This extension is necessary to provide enough time for the physical transition of services to the
EIS task orders. Other contractors provide the same type of service, however, it is not possible to transition the services to any other contractor faster than to the EIS contractor. Competing and awarding an additional contract or task order would create a transition inside of the transition to EIS and would seriously stall agencies’ progress in fully transitioning from this contract to EIS. As such, TCS America is the only contractor source who can continue to serve as the incumbent provider to these agencies while the agencies complete the process of transitioning to their new contracts.
5.b. Specific Demonstration
5.b.1 EIS Task Order Awards
As noted in section 1, user agencies DHS and DOT require an extension of this contract. DHS and DOT have already awarded EIS task orders using competitive procedures. Both of these user agencies are transitioning from services provided on this contract to their competitively awarded EIS task orders.
Department of Homeland Security (DHS) specifically the following components:
Customs and Border Protection (CBP) & National Law Enforcement Coordination Center
(NLECC)
- CBP Task Order 1 #70B04C22F00000130 (CBP TO1) was competed and awarded to Lumen on EIS Contract GS00Q17NSD3006 for Primary Internet Protocol Service (IPS) and other network-related services on April 18, 2022.
- CBP Task Order 2 #70B04C22F00000131 (CBP TO2) was competed and awarded to Core
Technologies on EIS Contract GS00Q17NSD3003 for Secondary IPS and other network-related services awarded on May 30, 2022.
- CBP Task Order 3 #70B04C22F00000132 (CBP TO3) was competed and awarded to AT&T on EIS Contract GS00Q17NSD3000 for Virtual Private Network Service (VPNS) and other network-related services including voice and conferencing services on April 18, 2022.
Office of the Under Secretary for Management (USM), Office of Intelligence & Analysis
(I&A), and Office of Biometrics Management (OBIM)
- USM Task Order 1 #70RTAC21FR00000015 (USM TO 1), was competed and awarded to
AT&T on EIS Contract GS00Q17NSD3000 for HQ Core Data TO for Data Services on January
1, 2021.
- USM Task Order 2 #70RTAC22FR0000115 (USM TO 2), was competed and awarded to Core
Technologies on EIS Contract GS00Q17NSD3003 for Toll-Free Services on September 22, 2022.
Immigration and Customs Enforcement (ICE)
- ICE Task Order 1 #70CTD021FR0000018 (ICE TO1) was competed and awarded to AT&T on
EIS Contract GS00Q17NSD3000 for DHS HQ Core Data on January 6, 2021.
- ICE Task Order 2 #70CTD022FR0000092 (ICE TO2) was competed and awarded to Granite
Telecom on EIS Contract GS00Q17NSD3004 for DHS ICE Traditional Voice Requirements on
August 1, 2022.
Office of the Inspector General (OIG)
- OIG Task Order #70VT1522F00019 (OIG TO1) was competed and awarded to Lumen on EIS
Contract GS00Q17NSD3006 for DHS OIG Network and Data Services on May 25, 2022.
- OIG Task Order #70VT1522F00018 (OIG TO2) was competed and awarded to Lumen on EIS
Contract GS00Q17NSD3006 for DHS OIG Voice on May 23, 2022.
Transportation Security Agency (TSA) & Federal Air Marshall’s Service (FAMS)
- TSA Task Order #70T03022F7667N027 (TSA TO) was competed and awarded to AT&T on
EIS Contract GS00Q17NSD3000 on August 1, 2022.
U.S. Coast Guard (USCG)
- USCG Task Order #HC101321F0196 (USCG TO) was competed and awarded to AT&T on
EIS Contract GS00Q17NSD3000 on August 26, 2021.
U.S. Citizenship and Immigration Service (USCIS)
- USCIS Task Order #70SBUR22F00000084 was competed and awarded to AT&T on EIS
Contract GS00Q17NSD3000 for USCIS Data and Voice Services on June 1, 2022.
Department of Transportation (DOT)
Federal Aviation Administration (FAA)
- FAA Task Order TO# 693KA8-21-F-00083 (FAA TO) was competed and awarded to AT&T on
EIS Contract GS00Q17NSD3000 on February 12, 2021.
5.b.2 Impact of not extending, and forcing user agencies to recompete the services currently provided on the subject contract
The extension of this contract is to support active Service Instance Records (SIRs) for user agencies so that there is not a break in service as they transition to their new EIS task orders. A
SIR typically includes information such as the customer's account number, the type of service
(i.e, analog line, Primary Rate Interface, Centrex line) that has been provisioned, the date and time the service was activated, and any other relevant details that may be needed to manage the service instance.
For example, in the case of a phone service, the SIR might include information about the customer's phone number, the type of plan they are on, and any usage limits or restrictions that apply to their account. Telecommunications service providers use SIRs to keep track of the services they are providing to their customers, to manage billing and invoicing, and to troubleshoot any issues that may arise with the service. SIRs are often integrated with other systems and databases, such as billing systems and network management systems, to provide a comprehensive view of the customer's service experience.
As part of each agency’s transition process, each SIR must first be assessed for implementation of the new service. Most SIRs will then need on-site evaluation of the facilities, wiring, interfaces and configurations to determine the required changes. Where equipment is aging or incompatible, replacement devices need to be ordered (with delayed delivery times due to chip-shortages), installed, and reconfigured.
There are currently over 520,000 active SIRs remaining on all legacy contracts supporting DHS missions, including 2,226 SIRs on GS01T13BKD1008. DOT currently has over 228,000 active
SIRs remaining on all legacy contracts supporting DOT missions, including 1,471 SIRs on
GS01T13BKD1008.
The 2,226 active SIRs provided on this contract support telecommunications for the following
DHS components and their ability to successfully perform their duties without disruption to their missions:
● CBP protects the American people, safeguards our borders, and enhances the nation's economic prosperity. Mission priorities include: countering terrorism;
combating transnational crime; securing the border; facilitating lawful trade and protecting revenue; and facilitating lawful travel.
● ICE's primary mission is to protect national security, public safety and the integrity of the U.S. borders through the criminal and civil enforcement of federal laws governing border control, customs, trade and immigration.
● OIG provides independent oversight and promotes excellence, integrity, and accountability within DHS.
● TSA & FAMS protect the nation's transportation systems to ensure freedom of movement for people and commerce.
● USCG is the Nation's premiere maritime first responder, minimizing loss of life and property by searching for and rescuing persons in distress.
● USCIS upholds America’s promise as a nation of welcome and possibility with fairness, integrity, and respect for all we serve.
● USM is responsible for Department-wide administrative support services and oversight for all support functions, including: IT, budget and financial management, procurement and acquisition, human capital, security, and administrative services.
● I&A’s mission is to equip the Homeland Security Enterprise with the timely intelligence and information it needs to keep the homeland safe, secure, and resilient.
● OBIM provides biometric match, store, share, and analyze services to DHS and mission partners.
The 1,471 active SIRs for the DOT, FAA provided by this contract, provides POTS service to
FAA sites at remote sites. Termination of these services will result in the remote sites not having the ability to communicate outside of the facility. This creates an environment of Safety, Health, and Security risks because there are no other facilities in the general area. Additionally, loss of services could result in having to shut down an FAA Facility, or in a worst case scenario an Air
Traffic Facility having to be shut down because it cannot perform its duty in protecting the air space. Shutting down an Air Traffic Facility would result in a major rerouting of planes, the potential for tremendous flight cancellations, shifting responsibilities for directing air traffic to other facilities, and could potentially have great financial impact.
DHS and DOT have all prepared task order solicitations that defined their requirements and then released those solicitations for fair opportunity in accordance with FAR 16.505. Proposals from EIS vendors were received and evaluated on the basis of cost and technical merit resulting in the award of new EIS task orders to transition all active SIRs off of the current contract. They are in the midst of transitioning to EIS. Additional time is required to complete these massive transition efforts. The fastest, most efficient and only feasible way to successfully transition to the competitively awarded EIS task orders is for the user agencies to be able to focus on the current transition and GSA extending this contract to allow transition completion. If GSA does not extend, and requires the user agencies to reprocure these services on a different contract, the only option the agencies would have is to award sole source contracts to the incumbent contractors because transitioning to another contractor is virtually impossible at this stage. This action would result in a transition within the original transition and would be a tremendous distraction from accomplishing the government's goal while wasting time, resources, and tax-payer money. User agencies estimate that if GSA does not extend, reprocurement efforts
(including creation of solicitation packages, through award and potential protest resolution) for their whole agency would add an additional 12-36 months to their current estimated date for completing transition (May 31, 2026).
To maintain these services, agencies would be required to engage immediately with the incumbent contractors currently providing these services to begin negotiating terms. Agencies would need to craft and obtain approval of justifications for other than full and open competition and begin sole source negotiations, including multiple acquisition packages, solicitations, negotiation of terms, and awards. The newly awarded interim solution contracts might allow for an administrative or back-office transition, which is a transition where the current provider is transitioning the same services from one contract to another to change contract and account numbers. While the administrative transition provided by the interim contract solution could afford agencies further runway to transition legacy services to the originally awarded EIS Task
Orders, it would also represent a complete duplication of the transition effort. The agencies would be conducting a transition inside a transition, performing extensive administrative transition efforts, while conducting the larger transition to the already awarded EIS Task Orders.
Additionally, transitioning to an interim solution would not reduce the timeline to EIS, and in fact, would likely delay the transition of agencies to their competitively awarded EIS task orders.
Based on the factors above, having agencies award interim solution contracts to maintain services is duplicative, administratively burdensome, and cost prohibitive. As both Government and EIS Contractor resources are pulled away to support the interim solutions contract administrative transition, the main EIS transition will become secondary, and progress will stall, further increasing risk on the agency’s services and primary transition activities. This would be a tremendously inefficient and wasteful exercise.
5.b.3 User Agency Justification Factors
This additional time is needed for many different reasons. Each agency identified different justification factors that contributed to delays in transition from GS01T13BKD1008.
DHS
DHS cited COVID-19 pandemic delays, supply chain disruptions, complexities related to modernizing services, delays related to Protest(s) and delayed award of EIS task orders as contributing factors to delays in transition from contract GS01T13BKD1008. Additionally, over a year and a half was spent collecting EIS requirements across DHS in an effort to implement a department-wide solicitation. After months of additional discussion, this strategy was modified so that components were to conduct individual EIS Solicitations. In late March 2020, the DHS components began developing their own EIS Strategy.
The COVID-19 pandemic presented barriers to transition for DHS that could not have been planned for or avoided. The effects of the pandemic continue to cause disruptions to the supply chain and were a major factor for several DHS components. Prior to COVID-19, telecommunication and network services could be provisioned by contractors faster than post-
COVID orders. For instance, a 50 MB Internet Protocol Solution (IPS) in the Continental U.S.
(CONUS) could be delivered in as little as 39 calendar days or as long as 550 days. The average was approximately 169 calendar days. The global chip shortage resulted in delays in the delivery of Cisco 8000 series routers taking up to 12 months in some instances. Service-
Related Equipment (SRE) or Service Enabled Devices (SED) impacted by chip, chassis, or other equipment delays entail 6–12-months of additional time. Delivery of a complete 50 MB solution is now taking 319 calendar days, on average. Additionally, after the award of EIS task orders, site surveys were required. However, workforce shortages due to COVID-19 significantly impacted the Local Exchange Carrier (LEC) support provided to the agency. As a result, there were delays in scheduling site surveys, actual circuit installations, and coordination amongst government local points of contact who were no longer physically located at the sites in some cases. This required the agency and EIS contractor to adjust in scheduling access, escort, deliveries, site surveys and inside wiring/construction, as necessary.
Transforming to a modernized service while transitioning presents an additional set of challenges for the agencies and for the EIS contractors. This means that the agency is not simply reprocuring the services they previously purchased. Instead the service is converted during the transition, such as to replace a legacy service with a newer technology, improved functionality, or expanded reach. Technical complexities due to modernizing include the transitioning of traditional broadband services into a modernized solution.
An example of complexities related to modernizing: In one instance a DHS component is modernizing and transforming via the EIS transition. The DHS component is faced with modernizing their headquarters phone system and field circuit technology type. Additionally, a difficult-to-upgrade tie line is modernizing to a point-to-point telecommunications circuit. The EIS contractor and the DHS component originally planned to transition the current headquarters phone system, circuits, and tie lines as-is; however, DHS later discovered the Local Exchange
Carrier (LEC) would no longer support the circuit technology in use. At the DHS component headquarters, the contractor offered an alternative solution dependent upon access arrangements which the LEC declined to deliver. The DHS component and contractor are now moving forward with an alternative solution, while requiring multiple stakeholder reviews. This significantly lengthened the overall delivery timeline.
There were several protests that affected the award of key EIS task orders in the transition of service from this contract. The USCG TO was protested resulting in a delayed start of the transition for over 230 days. There were two primary protests and five supplemental protests of the TSA TO resulting in a 4-month delay. And finally the post-award protests of USM TO 1 resulted in a 212 day delay that affected USM, CISA, ICE, OBIM and FPS.
Due to the COVID-19 pandemic delays, supply chain disruptions, complexities related to modernizing services, delays related to Protest(s) and delayed award of EIS task orders, DHS requires additional time to minimize impacts to operations for the transition of services. For these reasons, current services from the TCS America must be retained longer to avoid interruption of DHS’ mission execution.
DOT, FAA
DOT, FAA cited complexities related to modernizing services as the major justification factor contributing to delays in transition from contract GS01T13BKD1008. In the transition of services from the Networx, WITS 3, and LSA legacy contracts to the EIS contract, the FAA has experienced major complications in modernizing services. There were lengthy discussions with the contractor about the best way to transform/modernize all services; either begin to transform/modernize right away at award or perform a ”like for like” transition initially and then modernize services later in a second transition (also on the EIS task order). After 8 months of discussion with the EIS contractor, FAA and the contractor agreed to modernize all services at award in order to avoid the FAA having to perform two transitions on the EIS task order, and also prevent the FAA from being in a position of losing services because of the discontinuation of legacy services like TDM. The financial impacts were also a major factor in this decision because during initial transition non-recurring costs (NRC) costs are waived, however the contractor would not guarantee they would honor that commitment during a second transition.
Most FAA services are POTS (Plain Old Telephone Service) lines or PRI (Primary Rate
Interface) services. FAA’s original transformation planning wanted the contractor to propose the most optimal solution on a site-by- site basis by leveraging new technology to combine services into as few solutions as possible rather than replace POTS with dial tone and PRI with IP Flex.
FAA expected the contractor to outline a plan that would leverage the IP Flex to combine different types of services.
FAA has an EIS Task Order, however the EIS contractor has to subcontract to multiple contractors in order to provide FAA with “the last mile” of service. Notices to discontinue TDM services are not being forecasted ahead of time by the existing providers. When issued, FAA and the EIS contractor have to shift focus to “put out these fires” to avoid losing service. In order to do that, FAA needs to transform that disconnected service to modern technology which requires either that the correct interfaces are up to date or that ports/cards are available to facilitate a PRI handoff. Due to the complexities related to modernizing services, FAA requires additional time to minimize impacts to operations for the transition of services. For these reasons, current services from TCS America must be retained longer to avoid interruption of
FAA’s mission execution.
6. DESCRIPTION OF EFFORTS MADE TO ENSURE THAT OFFERS ARE SOLICITED
FROM AS MANY SOURCES AS PRACTICABLE INCLUDING WHETHER A NOTICE WAS
OR WILL BE PUBLICIZED AS REQUIRED BY SUBPART 5.2 AND, IF NOT, WHICH
EXCEPTION UNDER 5.202 APPLIES.
This contract was competed in accordance with FAR Part 15 and resulted in eleven (11) multiple award IDIQ contracts. It was synopsized in accordance with FAR Part 5.2 at that time.
Additionally, the follow-on vehicle to provide the services under this IDIQ contract is EIS.
Transition planning dictates that all agencies using Networx, WITS 3, and Local
Telecommunications contracts will transition to EIS contracts or another vehicle. EIS was also synopsized in accordance with FAR Part 5.2 and awards were conducted with full and open competition in accordance with FAR Part 15 and resulted in nine EIS IDIQ Contracts. TCS
America is not one of the EIS contract holders. Table 2 below provides the dates when each agency awarded their EIS task order(s) and to whom:
Agency EIS Task Order Award Date EIS Contractor
DHS - CBP TO1 04/18/2022 Lumen
DHS - CBP TO2 05/30/2022 Core Technologies
DHS - CBP TO3 04/18/2022 AT&T
DHS - USM, I&A, & OBIM via
USM TO1
01/06/2021 AT&T
DHS - FPS, USM, I&A, & OBIM
via USM TO2
09/22/2022 AT&T
DHS - ICE TO1 01/06/2021 AT&T
DHS - ICE TO2 08/01/2022 Granite
DHS - OIG TO1 05/25/2022 Lumen
DHS - OIG TO2 05/23/2022 Lumen
DHS - TSA TO 08/01/2022 AT&T
DHS - USCG TO 08/26/2021 AT&T
DHS - USCIS TO 06/01/2022 AT&T
DOT - FAA TO 02/12/2021 AT&T
Table 2: EIS Task Order Award Dates
7. DETERMINATION BY THE CONTRACTING OFFICER THAT THE ANTICIPATED COST
TO THE GOVERNMENT WILL BE FAIR AND REASONABLE
The anticipated cost of this 12 month extension is approximately $743,795.16 based on the current total monthly invoicing on this contract. As DHS and DOT continue to progress in transitioning to EIS this number decreases. GSA does not anticipate any significant increase in modern telecommunications CLIN prices for this extension. Our analysis indicates that commercial prices for modern telecommunications services have been consistently falling, making it unlikely that contractors will be able to justify any pricing increases for many services.
Although some older technology services are becoming more expensive, unless a contractor primarily offers these older services, the net effect of these price increases is likely to be offset by the pricing on more modern services. In previous extensions, while there were some price increases, when taken on average, across the contracts, total pricing fell.
Every year GSA updates its commercial telecommunications pricing database using numerous sources. Each month this database is used to calculate the savings recognized by agencies using our telecommunications contracts by comparing prices paid to these commercial prices.
We recently updated the commercial price database for FY23. For comparison purposes only, we ran the fourth quarter FY22 savings using both the FY22 and FY23 commercial prices.
Because FY23 commercial prices had fallen across the board, the overall Q4FY22 savings percentage fell by several percentage points when using the new FY23 commercial prices.
While there are some commercial prices that have increased, these services do not constitute a significant enough portion of the services purchased from GSA to counteract the price decreases on other services.
8. DESCRIPTION OF MARKET RESEARCH CONDUCTED AND THE RESULTS (see part
10) OR A STATEMENT OF THE REASON MARKET RESEARCH WAS NOT CONDUCTED.
GSA conducts market research for network and telecommunication services on a regular basis throughout the year. The research includes assessing vendors' business practices and pricing strategies across the industry. GSA leverages the business intelligence gathered to inform business decisions related to contract establishment and administration as part of its normal business practices. The market research and business intelligence which included customer agency input, industry expertise, and professional publications were leveraged for this effort in order for GSA to make informed decisions about extending the reference contract.
9. OTHER FACTS SUPPORTING THE USE OF OTHER THAN FULL AND OPEN
COMPETITION, such as: When 6.302-1 is cited for follow-on acquisitions as described in
6.302-1(a)(2)(ii), an estimate of the cost to the Government that would be duplicated and how the estimate was derived.
GSA has been working across the Federal community to assist agencies in transitioning into the competitively awarded EIS program. Transition is a long, complex process spanning multiple years. While a number of agencies have or will complete their transitions on time, several require more time. The purpose of this sole source award is to provide such agencies with additional time to complete their transition. GSA is continuing to work with these agencies and has asked OMB to provide assistance in ensuring greater progress with transition. GSA remains committed to ensuring all Federal agencies transition from the Networx, WITS 3 and LSA contracts to EIS.
It would be a duplication of cost and effort to compete a contract to support these agencies requirements when the new contracts have already been competed and awarded (EIS). The purpose of this extension is to allow for that transition to continue and be completed.
Additionally, it is not feasible - nor possible for a different contractor to compete for, be awarded and transition the specific services currently utilized by agencies. Such an effort would require each of these agencies to devote the personnel and resources currently working on transition to the EIS task orders to switch to working on the same effort to award and then transition the existing services to a bridge contract. These same personnel and resources would then have to be immediately switched to implement a completely duplicative transition from the bridge contract to the EIS task orders. Agencies’ schedules for transitioning inventory from this contract to EIS task orders will not allow another transition from a bridge contract.
As mentioned above, the purpose of this extension is not intended to be used for agencies to order new services. All agencies are required to sign a Memorandum of Understanding (MOU) with GSA in order to remain on the Networks Authorized User List (NAUL) and to use the
Networx, Washington Interagency Telecommunications System 3 (WITS 3), and LSA contracts through 31 May 2026. In accordance with the MOU, during this period, “... the Agency will not order any new services or changes and relocation of existing services on any of the expiring
Networx, WITS 3, and Local Service telecom contracts. The only orders the Agency may submit are those to disconnect service. In the event of exigencies that may require the Agency to order service on the expiring contracts, there are six scenarios under which the Agency may request
GSA waive the prohibition:
1. Disaster relief activities;
2. Activities necessary by law, the Constitution, for safety of human life, or for protection of property;
3. Law enforcement operations;
4. Protective functions of the U.S. Secret Service;
5. Counter-terrorism or intelligence-gathering or -dissemination capabilities;
6. Matters related to diversity, equity, inclusion, and accessibility."
10. A LISTING OF SOURCES, IF ANY, THAT EXPRESSED, IN WRITING, AN INTEREST IN
THE ACQUISITION
All interested parties participated in the competition of the EIS contracts by submitting a proposal and nine of them have EIS contracts to continue this work. This extension provides agencies with additional time to complete their transition from this contract to the EIS contracts.
11. A STATEMENT OF ACTIONS, IF ANY, THE AGENCY MAY TAKE TO REMOVE OR
OVERCOME ANY BARRIERS TO COMPETITION BEFORE ANY SUBSEQUENT
ACQUISITION FOR THE SUPPLIES OR SERVICES REQUIRED
The EIS multiple award IDIQ contracts are the follow-on contracts to provide the services currently provided under this contract. GSA conducted a FAR Part 15 full and open competition to award the EIS IDIQ contracts to replace all its legacy telecommunications contracts, inclusive of GS01T13BKD1008. On July 31, 2017, GSA awarded the Enterprise Infrastructure Solutions
(EIS) contract to nine (9) contractors. TCS America was not awarded an EIS contract. The agencies listed in the Table 1 under Section 3 have all awarded or are in the process of awarding their EIS task orders to replace those services listed. All EIS task orders are subject to
FAR Part 16.505 fair opportunity procedures. This extension is required to provide agencies the extra time required for them to transition those services off of this contract to their EIS task order or soon to be awarded task order.
Customer agencies are responsible for their transition from the legacy contracts to EIS and are in various stages of completing transition. GSA has provided significant assistance to agencies in the years since the award of EIS to aid in each phase of the transition. Agencies planning on using the Networx, WITS 3, and LSA contracts extension periods are required to sign a MOU with GSA acknowledging that during the additional time period, agencies will have responsibility to transition all remaining services to EIS or another acquisition solution or implement a contingency plan by May 31, 2026.
GSA has had limited information and visibility into agencies’ transition progress in the past. The
MOU for agencies using extensions from June 1, 2024 through May 31, 2026 requires increased transparency and monitoring on agency transition status. Increased visibility will encourage agencies to transition faster and allow agencies to recognize earlier that contingency plans must be implemented by the customer agency to avoid disconnects after May 31, 2026.
GSA is not a mandatory source for the telecom services and agencies have the option to choose the procurement vehicle that best suits their needs. GSA does not have the authority to hold agencies accountable to meet the agencies’ transition plan deadlines, however, GSA has no intention of considering further extension of this contract. Any further sole source procurement needs will be executed by customer agencies’ Contracting Officers if needed.
Lastly, to minimize or eliminate the need for non competitive extensions in the future, GSA will apply transition lessons learned to all EIS follow on procurement activities.
12. CERTIFICATIONS AND APPROVALS
TECHNICAL PERSONNEL CERTIFICATION:
I certify that the supporting data for this Justification for Other than Full and Open
Competition, was the responsibility of technical or requirements personnel (e.g., verifying the Government’s minimum needs or schedule requirements or other rationale for other than full and open competition). The supporting data provided and which form a basis for the justification have been certified as complete and accurate by the technical or requirements personnel.
___________________________ Date: _______________________
GSA Technical Representative
CONTRACTING OFFICER CERTIFICATION AND APPROVAL:
I certify that this Justification for Other than Full and Open Competition, in accordance with
FAR 6.302-1, is accurate and complete to the best of my knowledge and belief, and that a brand name is justified and reasonably available.
GSA Contracting Officer
Approvals:
Competition Advocate for ITC
9/1/2023
9/6/2023
9/11/2023
Certificate Of Completion Envelope Id: D344435EEABC4AEBBFE08E6077EFABAA Status: Completed
Subject: Complete with DocuSign: #41 GS01T13BKD1008 (TCS America) - R1 RLSA.pdf
Source Envelope:
Document Pages: 14 Signatures: 3 Envelope Originator:
Certificate Pages: 2 Initials: 0 Will Moore
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC) Dublin, Edinburgh, Lisbon, London
1800F F St NW
Washington DC, DC 20405 will.moore@gsa.gov
IP Address: 104.15.233.123
Record Tracking Status: Original
9/1/2023 8:14:08 PM
Holder: Will Moore will.moore@gsa.gov
Location: DocuSign
Security Appliance Status: Connected Pool: FedRamp
Storage Appliance Status: Connected Pool: US General Services Administration Location: DocuSign
Signer Events Signature Timestamp William Moore will.moore@gsa.gov
US General Services Administration
Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style
Using IP Address: 104.15.233.123
Sent: 9/1/2023 8:16:10 PM
Viewed: 9/1/2023 8:16:23 PM
Signed: 9/1/2023 8:16:31 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Marie Rivera marie.rivera@gsa.gov
US General Services Administration
Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style
Using IP Address: 68.3.16.61
Sent: 9/1/2023 8:16:32 PM
Viewed: 9/6/2023 9:13:27 PM
Signed: 9/6/2023 9:13:30 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Marquita Washington marquita.washington@gsa.gov
Director, Governance Division
US General Services Administration
Security Level: Email, Account Authentication (None)
Signature Adoption: Pre-selected Style
Using IP Address: 107.115.17.126
Signed using mobile
Sent: 9/6/2023 9:13:31 PM
Viewed: 9/11/2023 6:10:46 PM
Signed: 9/11/2023 6:11:11 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 9/1/2023 8:16:10 PM
Certified Delivered Security Checked 9/11/2023 6:10:46 PM
Signing Complete Security Checked 9/11/2023 6:11:11 PM
Completed Security Checked 9/11/2023 6:11:11 PM
Payment Events Status Timestamps
| 2023-09-13T13:52:19-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .