About this file

This document is an Invitation to Bid (ITB) issued by the City of Bridgeport, Connecticut, specifically the Department of Public Purchases, for painting services at the JFK School Campus Swimming Pool Room. The project involves removing acoustic panel material, painting ceiling and beams, and painting walls, with work scheduled to be completed during the first week of Summer Break, tentatively June 14, 2025. The bid opening is set for May 6, 2025, at 2:00 pm, with a mandatory walkthrough on April 17, 2025, at 10:00 am. Bidders must submit one original, one copy, and one electronic version via thumb drive, with all submissions required to be made through the OpenGov procurement portal.

The bid requires a lump sum price that must include all costs, including labor, materials, equipment, transportation, and incidental expenses. A ten percent bid bond or certified check is mandatory for bids $50,000 or more, with specific requirements for Minority Business Enterprises (MBE). The City of Bridgeport encourages MBE, Women Business Enterprises (WBE), and City-Based Businesses (CBB) to submit proposals, with certifications required at the time of bid submission. Bidders must provide various documentation, including contractor's license, surety certification, compliance officer designation, good standing certification, MWBE utilization form, lead time for equipment and supplies, and a tentative work schedule. The bid price will remain firm and valid through October 31, 2025.

View the file

Other files

File Type Posted
Construction_Project_Insurance_Rider.docx DOCX document
Construction_Contract_JFK_School_Painting.docx DOCX document
0._GENERAL_CONDITIONS_-_FINAL_REV._JAN_2025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID

BMB037255

JFK SCHOOL CAMPUS _PAINTING OF SWIMMING

POOL ROOM WALLS & CEILING

CITY OF BRIDGEPORT

DEPARTMENT OF PUBLIC PURCHASES

999 BROAD STREET

BRIDGEPORT CT 06604

Submission Deadline:

Tuesday, May 6, 2025 by 2:00 pm

Table Of Contents

1. Introduction

2. Bid Information

3. Statement of Work

4. Pricing

5. Submission Deadlines

6. Terms and Conditions

7. Vendor Questionnaire

Attachments:

A - 0._GENERAL_CONDITIONS_-_FINAL_REV._JAN_2025

B - Construction Contract_JFK School Painting

C - Construction Project Insurance Rider

1. Introduction

The City of Bridgeport seeks bids for JFK School Campus _Painting of Swimming Pool

Room Walls & Ceiling.

The requirements of this bid are outlined in greater detail under Bid Information Section.

The selected awardee must meet all municipal, State and Federal practices and requirements.

Please note the City of Bridgeport encourages Minority business enterprises (MBE), Women business enterprises (WBE) and City-based businesses (CBB) to submit proposals. MBE, WBE or CBB State and/or City certification(s) showing the vendor’s current M/WBE and/or CBB status must be included as part of the proposal package at the time of submission for such status to be considered. For details, please see City Ordinance 3.12.130D

1.1. City Background

Bridgeport, the most populous city in Connecticut and the fifth-most populous in New England, is situated in eastern Fairfield County at the mouth of the Pequonnock River on Long Island

Sound. With a population of 148,654 in 2020, it is 60 miles from Manhattan and 40 miles from

The Bronx, forming part of the New York metropolitan area. The city borders Trumbull to the north, Fairfield to the west, and Stratford to the east. Bridgeport is a significant part of the

Greater Bridgeport Planning Region and the Bridgeport-Stamford-Norwalk-Danbury metropolitan statistical area, the second largest in Connecticut.

Since the early 21st century, Bridgeport has seen extensive redevelopment in its downtown and other neighborhoods. Bridgeport is home to several educational institutions, including the

University of Bridgeport, Housatonic Community College, Paier College, and part of Sacred

Heart University, as well as the state's only zoo, Connecticut's Beardsley Zoo. The city is also nicknamed "Park City" for its 35 public parks, covering 1,300 acres, including two large parks.

Despite not being headquartered in the city, over a dozen Fortune 500 companies are based in the metropolitan area shared with Stamford.

Bridgeport is a culturally vibrant city with three museums, numerous parks, and significant venues like Seaside Park, the Total Mortgage Arena, and the Hartford HealthCare Amphitheater.

The Barnum Museum and Connecticut's Beardsley Zoo are notable attractions, enhancing the city's cultural and recreational appeal. Recognized for its diversity, Bridgeport is consistently ranked among the 25 most ethnically and culturally diverse cities in the United States.

2. Bid Information

The Invitation to Bid (ITB) is to obtain pricing information for JFK School Campus _Painting of

Swimming Pool Room Walls & Ceiling

The City of Bridgeport reserves the right to reject any bid when the product information submitted with the bid is incomplete.

Bid price submitted shall be firm fixed and valid through October 31, 2025.

All pricing submitted shall be furnished and delivered to the following address: 999 Broad

Street Bridgeport, CT 06604.

All inquiries regarding this bid must be presented in writing and may be posted directly on the procurement portal, OpenGov. The cut-off date for questions is 2:00pm on Wednesday, April

23,2025. All answers will be reponded to by 2:00pm, Friday, April 25, 2025

No work or deliveries shall be performed under the contract award until the purchase order has been issued by the purchasing department.

3. Statement of Work

3.1. Project Description

Provide painting services for the JFK School Campus Pool Room.

Contractor and workers must be capable, experienced, and licensed/certified to perform all services.

The lump sum price proposal must reflect all costs for which the BOE will be responsible, including all labor, materials, equipment (owned or rented), overtime, transportation, and necessary hand tools required by the trade, as well as any other expenses of having the workers on the job site.

Regardless of exceptions taken, Contractors shall provide pricing based on the requirements and terms set forth in the Scope of Work. Pricing must be all-inclusive and cover every aspect of the description of Work. If there are additional costs associated with the Work, they must be added to this proposal. If there are exclusions to this work, they must be added to this proposal.

3.2. Scope of Work

Ceiling & Beams

Set up and Remove scaffolding system as needed

Scrape and remove all loose paint

Patch any damaged areas

Protect sprinkler pipes, not to be painted

Paint 2 coats of one color, color to be determined by BPS staff

Ensure any paint flakes, chips, or any debris is removed from pool prior to completion of work

Work with BPS staff to ensure pool area is conditioned/heated/cooled properly during prep and painting operations

Acoustic Panel Material Removal

Demo remaining acoustic panel material and brackets

Patch any areas damaged due to removal, including filling holes

Remove all materials and debris to be discarded

Paint Walls

Scrape and remove loose paint, repair if needed

Paint 2 coats, one color, color to be determined by BPS staff

3.3. Schedule, Timeline, and Milestone Tracking

Walkthrough, Thursday, April 17, 2025, 10:00am at JFK, 700 Palisade Avenue, Main Office

Questions due by 2:00pm on April 23, 2025

Answers will be posted by 2:00pm on April 25, 2025

Bid Opening Date: May 6, 2025 @ 2:00pm

Note: Work to be completed during the first week of Summer Break, Tentatively June 14, 2025,

4. Pricing

JFK SCHOOL PAINTING OF SWIMMING POOL ROOM WALLS & CEILING

****LUMP SUM MUST INCLUDE BOND(S)****

Line Item Description Unit of Measure Unit Cost

1 Remove acoustical panel material & brackets & Paint

Ceiling and Beams

LUMP SUM

2 ALTERNATE 1 Paint Walls LUMP SUM

5. Submission Deadlines

5.1. Contacting the City of Bridgeport

The exclusive means by which all prospective respondents may obtain ITB packages, direct inquires, request and receive addenda and supplemental information, and submit proposals shall be through the City of Bridgeport’s bidding platform.

The City of Bridgeport has made it possible for vendors to view our solicitations, download bid packages and ask questions, free of charge.

Instructions to do so are as follows:

1. Go to the procurement portal, OpenGov

2. Click on any bid you see. It will take you that bid’s page.

3. On the right-hand side of the page, click on Register now for free!

4. After you register, you'll be able to view/download or ask questions on any bid you have interest in.

If you have any trouble registering on the procurement portal, please email OpenGov at procurement-support@opengov.com

Addenda Notification: Respondents are required to register on the procurement portal, OpenGov. Once the respondent has completed registration, they will receive addenda notifications in their email. Ultimately, it is the sole responsibility of each respondent to periodically check the site for any addenda.

General Information: All inquiries regarding this bid must be presented in writing and may be posted directly on the procurement portal, OpenGov.

5.2. Submission Instructions

All submissions must be submitted via the procurement portal.

Special Submission Circumstances: The procurement portal, OpenGov, is the electronic bid submission process of choice for City of Bridgeport purchases. In the event, a bidder is unable to submit electronically through the city’s procurement portal, bids can be submitted, by mail, as outlined below. Non-electronic submissions are accepted on an exception only basis.

Submission: ONE (1) ORIGINAL, ONE (1) COPY AND ONE (1) ELECTRONIC VIA

THUMBDRIVE MUST BE SUBMITTED.

Sealed submissions must be received and time-stamped by the Department of Public Purchases prior to ITB closing time. No submission received after closing time will be considered. The opening will be in the City of Bridgeport Department of Public Purchases’ Conference Room. To ensure proper handling and avoid misdirected delivery, please mark your ITB envelope as follows:

BMB037255 – JFK School Campus _Painting of Swimming Pool Room Walls & Ceiling

Mail your submissions to:

Laura DeMoura City of Bridgeport Department of Public Purchases https://procurement.opengov.com/governments/9328203/projects/160367/manage

2nd floor, 999 Broad Street Bridgeport, CT 06604

ITB submissions are due:

Tuesday, May 6, 2025 2:00pm Eastern Standard Time (EST)

5.3. Compliance

Certificates of Insurance: Certificates of insurance will be required from the awarded contractor prior to the commencement of any work and shall be furnished to the Department of

Public Purchases, Margaret E. Morton Government Center, Second Floor, 999 Broad Street, Bridgeport, Connecticut 06604 and must be shown to the City of Bridgeport as an additional insured with thirty (30) days’ notice for cancellation or non-renewal of policy. A copy of the endorsement insurance will also be required for this project.

No Conflicts| Disclosure: the awarded contractor must accurately complete and submit the No

Conflicts/Disclosure Form when it receives a Notice of Intent to Award. Failure to submit the No

Conflicts within three (3) business days of receipt of the Notice of Intent may result in the loss of the award.

Non-Collusion Affidavit: all bidders must accurately complete and submit non-collusion affidavits with all bids or bids will be considered non-responsive.

Addendums: all bidders shall check the procurement portal regularly to see if any addendums are issued.

Contract Award Requirements: the contract award will require that the successful will require that the successful vendor have a valid SAM, DUNS, CT, and Federal Tax ID numbers prior to commencing work.

Late Submissions: The City of Bridgeport will not assume responsibility if a submission is misdirected, or its delivery is delayed. The city will not accept late submission. It shall be the sole responsibility of the submitter to pay for any type of delivery service charge, and to see that the Office of the Purchasing Agent receives his/her submission on time. The clock used shall be the Purchasing Agent’s official date and time stamp clock. The City does not assume financial responsibility for late deliveries by the U.S. Postal System or any other delivery service.

Expenses: The City shall not be responsible for and/or shall not pay any costs associated with the preparation, submission, or presentation of any submission, or costs incurred by the responding firms during the interview and negotiations phase of the solicitation process

Information and Materials: Any information or materials submitted to this ITB shall become the property of the City of Bridgeport and will not be returned. All submitted materials will be available for public review.

Dates: Please keep in mind dates are estimates only and are subject to change.

5.4. Reservation of Rights

This solicitation is for an “Invitation to Bid (ITB) only”. This invitation to bid is not to be construed as a specific proposal or an offer to buy any products or services. Notwithstanding anything else herein to the contrary, the City expressly reserves all rights in its sole discretion and in the best interests of the City at any time prior to the selection of a preferred respondent and purchase order:

Bid Rejection: The City of Bridgeport reserves the right to reject any and all bids in whole or in part or to accept any bid, in its sole discretion if doing so deemed to be in the best interest of the

City of Bridgeport. This includes the right to reject any or all bids or to decline to make an award. Further, the City of Bridgeport reserves the right to make an award to more than one bidder or make awards not based solely on low bid when time is of the essence.

MSDS: The City of Bridgeport may request MSDS (Material Safety Data Sheets) or additional product information and literature or samples on any brands or products proposed as equivalents to those listed herein prior to award or to be included with shipment.

Tax Delinquency: The City of Bridgeport reserves the right to ensure bidders are not delinquent on any City real estate and personal property taxes, ate the time of bid opening.

Purchase Order - Contract Award: The City of Bridgeport reserves the right to award a purchase order to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the City of Bridgeport in terms of cost. Other factors such as lead time, equipment, availability and other factors specified in this solicitation may be considered.

Bid Dates: The City of Bridgeport reserves the right to modify any dates other terms of the ITB upon posting notice.

Liability: the City of Bridgeport is not liable to any Respondent for damages of any type, however arising.

5.5. Additional Bid Requirements

Title: vendors are prohibited from assigning, transferring, conveying, subletting, or otherwise disposing of the ultimate contract award or its rights, title or interest therein or its power to execute such agreement to any other person, company or corporation without the prior consent and approval in writing by the City.

Taxes: bidders should not include any taxes in their quotation for which the city is not liable. The City of Bridgeport will issue tax-exempt certificates covering the work upon request.

Minority and Buy Local: The City of Bridgeport Minority and Buy Local Program Ord.

3.12.130 E, may be applicable to this project.

Minority Business Enterprise (MBE) and, or as a City Based Business (CBB): In conjunction with this invitation, certifications of the vendors current MBE and, or CBB status must be included as part of the bid package at the time of the bid submission. Consistent with the terms of City Ordinance 3.12.130 no submission either MBE or CBB certification will be accepted when such certifications(s) is, are not submitted as part of the bid package at the time of bid submission. For MBE | CBB certification information, please contact Mr. Jason

Chandersingh, Special Project Coordinator, Small & Minority Business Resource Center at (203)

576-7110, jason.chandersingh@bridgeportct.gov

6. Terms and Conditions

6.1. Terms and Conditions

All City of Bridgeport contracture terms, conditions, and requirements apply.

6.2. Payment Terms

Detail the payment schedule and any conditions for payment.

6.3. Warranty and Support

Specify any warranty and support requirements.

6.4. Openness of Procurement Process

Written responses, other discussions, correspondence, and all other pertinent records shall be handled as public records in compliance with State and Federal open records statutes and regulations.

6.5. Errors and Omissions

Once a response is submitted, the City of Bridgeport may consider requests by any contractor to correct errors or omissions but shall retain sole discretionary authority to determine the outcome of such a request.

6.6. Collusion

By offering a response to this ITB the supplier certifies that no attempt has been made or will be made by the consultant to induce any other person or firm to submit or not to submit a proposal for the purpose of restricting competition. All persons interested in this project, principal or principals being named therein, and no other person have an interest in this project or in the

Agreement which they may participate in. No person or agency has been employed or retained to solicit or secure this Agreement upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, excepting legitimate employees or established commercial agencies maintained by the consultant for the purpose of doing business. All firms interested in this project (including the firm's employees, representatives, agents, lobbyists attorneys and subconsultants) will refrain, under penalty of disqualification, from direct or indirect contact for the purpose of influencing the selection or creating bias in the selection process with any person who may play a part in the selection process, including the evaluation panel and other administrative staff. The policy is intended to create a level playing field for all potential firms; assure that contract decisions are made in public and to protect the integrity of the selection process.

6.7. Suspension and Debarment

mailto:jason.chandersingh@bridgeportct.gov

The City will not participate in contracts with parties that have been debarred, suspended or excluded from Federal assistance programs per 2 CFR part 180 and part 1532 and 40 CFR part

31.35. Further, the respondent is required to verify that the respondent, or its principals, as defined at 49 CFR 19.995, or affiliates, as defined at 49 CFR 29.905, are excluded or disqualified as defined at 49 CFR 29.40 and 29.945

The respondent is required to comply with 49 CFR 29, Subpart C and must include the requirement to comply with 49 CFR 29, Subpart C in any lower-tier covered transaction it participates in.

By signing and submitting its bid or proposal, the respondent or proposer certifies as follows:

The certification in this clause is a material representation of fact relied upon by the City if it is later determined that the respondent or proposer knowingly rendered an erroneous certification, in addition to remedies available to the City the Federal Government may pursue available remedies, including but not limited to suspension and/or debarment. The respondent or proposer agrees to comply with the requirements of 49 CFR 29, Subpart C while this offer is valid and throughout the period of any contract that may arise from this offer. The respondent or proposer further agrees to include a provision requiring such compliance in its lower-tier covered transactions.

7. Vendor Questionnaire

1. Federal I.D. Number or Social Security Number:*

*Response required

2. Confirmation*

Pursuant to and in compliance with your Invitation To Bid relating thereto, the submitter states that he has examined the Contract Documents and the site of the work, and that he understands the purport and magnitude of the work intended, and the undersigned hereby offers to furnish all plant, materials, supplies, equipment, labor, and other facilities and things necessary or proper for or incidental to, the proper construction of the work, and to construct the said work in strict accordance with the Contract Documents and such detailed directions, plans, and drawings as may be furnished from time to time during the progress of construction by the Engineer at the following unit and lump sum prices which prices include all incidental work, viz.

☐ Please confirm

*Response required

3. Contractor's License Number*

*Response required

4. BID BOND: *

Bidder must Include with the submitted bid, a CURRENT CERTIFED ten (10%) percent bid bond or a certified check made payable to the City of Bridgeport with their bid submission if the bid is $50,000.00 or more, except for bids from MBE’s, for which a bid bond is required on bids that are $100,000 or more. Bid bonds must reference the current project. Certification showing the vendor’s current MBE status must be included as part of the submission package at the time of submission for such status to be considered.

*Response required

5. Contractor's Certification of Surety*

Please download the below documents, complete, and upload.

• Contractor's_Certification_...

*Response required

6. Contractor's Designation of Compliance Officer*

Please download the below documents, complete, and upload.

• Contractor's_Designation_of...

*Response required

7. Contractor's Good Standing Certification*

Please download the below documents, complete, and upload.

• Contractor's_Good_Standing_...

*Response required

8. Contractor's MWBE Utilization Form*

Please download the below documents, complete, and upload.

• Contractor's_MWBE_Utilizati...

*Response required

9. Please provide lead time for equipment & supplies. Please include the Number of Days to procure and deliver the material needed to complete the work*

*Response required

10. Attach tentative work schedule.*

*Response required

11. No Conflicts/Disclosure Form (Signed and notarized)**

Please download the below documents, complete, and upload.

*Response required

12. WAGE RATE CERTIFICATION FORM*

Please download the below documents, complete, and upload.

• contractorswagecertificatio...

*Response required https://government-project.s3.us-west-2.amazonaws.com/115403/e5aa1a6f-6b99-4f8f-af4f-c380ae23d501_Contractor%27s_Certification_of_Surety.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4INCPVO2D%2F20250425%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250425T125348Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJT%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQDmVOcvfejbsm2TTwVIimgIYcw%2BeOxACT4CMs%2BQGpclKgIgenaPFqVoTLpCqxmM5heRhxuMdmMjKPgyjZYZjxKlLaEqgwUILRACGgw4OTIzNjQ2ODc2NzIiDOG3nDH5DWuXFFCADSrgBAQ%2F7hf9zqpd6pvTd61wryTB4ivd9YOO7ety5WIco%2F3mBzSWCM%2BA9gvF2Migb3uMfF%2B4QfrHa%2FKUmGX%2FhD2VRxAWWeAvzXIezFVrdQ6iayOx5XJqO8Qs2kmINq24XIDOOSzmf3hNfNHljaSpgHH5H8%2By%2FAyiz4ElRAYC11EE4USCADnka2Cl40cRV0rgk5P7S3PM7bDMqzIMNQTQ2jledttsucgE2iAbRlZNhAH3N52P%2B8Q8EnybT%2Fa3CdQxv11CuPajELgMmqBJsaFDqvt3lTyym0KnfPmXKD9FAubJU2RQ7lWntB5bQmGdr%2Bnw9fjfBwi3x8mrisb2lXL1xSrPzfsgfjJ%2FyuXFaehPrAUBs1s2FIONHSBpPi5xZs4xb%2B5%2FM2bqbnCmf55VyqgnA%2BlJfiEVqyQypEulQ5BAc4qp94bnWr6%2BaxSVCtqWJQMfMfcGrjlYUDkiTnrnfc%2BbyCelDWvOpchArUR9Pitn6vJbiRERV%2BLClj%2F0DCdqtOU5bQADS6nF3IDRAC2a2KYkG1%2Bp2ZE9h7JPgvw3%2F98b74zm0UrO9DzYTjMACP2qI1fjMEKpNzpQVfbrRR%2B6J4RisorrGz0queqnfhlaiUDzLoCEzvBegacj11WANrrUO9ThXEp9TPYRBZUgZtg2bs%2BB4zHwIB1JIpGdEXWlsiS4Eb8R2v0ybhuEof9KC5GfAmYJTNc3%2ByymhVN%2FpZ3Baxzr5HUYq%2Ftf89kQ0jEVSLQMWGFTGdHTtt18B6t9eR2E0C7Q7j90wDYk6iF2GgTj6Gq%2FKEbKQgsxPwC1BiC987G5x0IdxaibMMntrcAGOpsBPPg2uT0B8S7BcS8IVJyMl4OIq0otn0EO1TxiQi9DiveI1ayE8b2YRIYkcLdqHEbk3rQVivBJZ%2B3H828yLqG39Q2J4Yfvh5HwNpk3NQYMy2rUIk6z%2B5SZvDnLt1FnDoYKVOblVW23Fj5ey%2BTcFt9ZIivMaNV%2B4U6Fn3A4b2XipBiEQZd05%2FuhfEV0XU9JCJolBmN5NL5nEqFfll0%3D&X-Amz-Signature=bf8a0439df2440d0001dd59e7c7702bcc53c1c7b8f299051ed997a52e5dca07f&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_Certification_of_Surety.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/75efbd30-4945-4f69-a730-84ce2633da7b_Contractor%27s_Designation_of_Compliance_Officer.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4INCPVO2D%2F20250425%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250425T125348Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJT%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQDmVOcvfejbsm2TTwVIimgIYcw%2BeOxACT4CMs%2BQGpclKgIgenaPFqVoTLpCqxmM5heRhxuMdmMjKPgyjZYZjxKlLaEqgwUILRACGgw4OTIzNjQ2ODc2NzIiDOG3nDH5DWuXFFCADSrgBAQ%2F7hf9zqpd6pvTd61wryTB4ivd9YOO7ety5WIco%2F3mBzSWCM%2BA9gvF2Migb3uMfF%2B4QfrHa%2FKUmGX%2FhD2VRxAWWeAvzXIezFVrdQ6iayOx5XJqO8Qs2kmINq24XIDOOSzmf3hNfNHljaSpgHH5H8%2By%2FAyiz4ElRAYC11EE4USCADnka2Cl40cRV0rgk5P7S3PM7bDMqzIMNQTQ2jledttsucgE2iAbRlZNhAH3N52P%2B8Q8EnybT%2Fa3CdQxv11CuPajELgMmqBJsaFDqvt3lTyym0KnfPmXKD9FAubJU2RQ7lWntB5bQmGdr%2Bnw9fjfBwi3x8mrisb2lXL1xSrPzfsgfjJ%2FyuXFaehPrAUBs1s2FIONHSBpPi5xZs4xb%2B5%2FM2bqbnCmf55VyqgnA%2BlJfiEVqyQypEulQ5BAc4qp94bnWr6%2BaxSVCtqWJQMfMfcGrjlYUDkiTnrnfc%2BbyCelDWvOpchArUR9Pitn6vJbiRERV%2BLClj%2F0DCdqtOU5bQADS6nF3IDRAC2a2KYkG1%2Bp2ZE9h7JPgvw3%2F98b74zm0UrO9DzYTjMACP2qI1fjMEKpNzpQVfbrRR%2B6J4RisorrGz0queqnfhlaiUDzLoCEzvBegacj11WANrrUO9ThXEp9TPYRBZUgZtg2bs%2BB4zHwIB1JIpGdEXWlsiS4Eb8R2v0ybhuEof9KC5GfAmYJTNc3%2ByymhVN%2FpZ3Baxzr5HUYq%2Ftf89kQ0jEVSLQMWGFTGdHTtt18B6t9eR2E0C7Q7j90wDYk6iF2GgTj6Gq%2FKEbKQgsxPwC1BiC987G5x0IdxaibMMntrcAGOpsBPPg2uT0B8S7BcS8IVJyMl4OIq0otn0EO1TxiQi9DiveI1ayE8b2YRIYkcLdqHEbk3rQVivBJZ%2B3H828yLqG39Q2J4Yfvh5HwNpk3NQYMy2rUIk6z%2B5SZvDnLt1FnDoYKVOblVW23Fj5ey%2BTcFt9ZIivMaNV%2B4U6Fn3A4b2XipBiEQZd05%2FuhfEV0XU9JCJolBmN5NL5nEqFfll0%3D&X-Amz-Signature=c52ea73fab3f9ddd289b34ca53cf6fa8d37e649c4ed8168b9603de23aef2d2a5&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_Designation_of_Compliance_Officer.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/8d9bf061-767f-4716-a5fe-0d8d8ec81783_Contractor%27s_Good_Standing_Certification.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4INCPVO2D%2F20250425%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250425T125348Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJT%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQDmVOcvfejbsm2TTwVIimgIYcw%2BeOxACT4CMs%2BQGpclKgIgenaPFqVoTLpCqxmM5heRhxuMdmMjKPgyjZYZjxKlLaEqgwUILRACGgw4OTIzNjQ2ODc2NzIiDOG3nDH5DWuXFFCADSrgBAQ%2F7hf9zqpd6pvTd61wryTB4ivd9YOO7ety5WIco%2F3mBzSWCM%2BA9gvF2Migb3uMfF%2B4QfrHa%2FKUmGX%2FhD2VRxAWWeAvzXIezFVrdQ6iayOx5XJqO8Qs2kmINq24XIDOOSzmf3hNfNHljaSpgHH5H8%2By%2FAyiz4ElRAYC11EE4USCADnka2Cl40cRV0rgk5P7S3PM7bDMqzIMNQTQ2jledttsucgE2iAbRlZNhAH3N52P%2B8Q8EnybT%2Fa3CdQxv11CuPajELgMmqBJsaFDqvt3lTyym0KnfPmXKD9FAubJU2RQ7lWntB5bQmGdr%2Bnw9fjfBwi3x8mrisb2lXL1xSrPzfsgfjJ%2FyuXFaehPrAUBs1s2FIONHSBpPi5xZs4xb%2B5%2FM2bqbnCmf55VyqgnA%2BlJfiEVqyQypEulQ5BAc4qp94bnWr6%2BaxSVCtqWJQMfMfcGrjlYUDkiTnrnfc%2BbyCelDWvOpchArUR9Pitn6vJbiRERV%2BLClj%2F0DCdqtOU5bQADS6nF3IDRAC2a2KYkG1%2Bp2ZE9h7JPgvw3%2F98b74zm0UrO9DzYTjMACP2qI1fjMEKpNzpQVfbrRR%2B6J4RisorrGz0queqnfhlaiUDzLoCEzvBegacj11WANrrUO9ThXEp9TPYRBZUgZtg2bs%2BB4zHwIB1JIpGdEXWlsiS4Eb8R2v0ybhuEof9KC5GfAmYJTNc3%2ByymhVN%2FpZ3Baxzr5HUYq%2Ftf89kQ0jEVSLQMWGFTGdHTtt18B6t9eR2E0C7Q7j90wDYk6iF2GgTj6Gq%2FKEbKQgsxPwC1BiC987G5x0IdxaibMMntrcAGOpsBPPg2uT0B8S7BcS8IVJyMl4OIq0otn0EO1TxiQi9DiveI1ayE8b2YRIYkcLdqHEbk3rQVivBJZ%2B3H828yLqG39Q2J4Yfvh5HwNpk3NQYMy2rUIk6z%2B5SZvDnLt1FnDoYKVOblVW23Fj5ey%2BTcFt9ZIivMaNV%2B4U6Fn3A4b2XipBiEQZd05%2FuhfEV0XU9JCJolBmN5NL5nEqFfll0%3D&X-Amz-Signature=7011a7b336de1a9d2d15558da4c956683619356460245213dd8016f766eb3d88&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_Good_Standing_Certification.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/a2e401a8-0a6b-4dee-8b6c-a19d3aab26eb_Contractor%27s_MWBE_Utilization_Form.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4INCPVO2D%2F20250425%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250425T125348Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJT%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQDmVOcvfejbsm2TTwVIimgIYcw%2BeOxACT4CMs%2BQGpclKgIgenaPFqVoTLpCqxmM5heRhxuMdmMjKPgyjZYZjxKlLaEqgwUILRACGgw4OTIzNjQ2ODc2NzIiDOG3nDH5DWuXFFCADSrgBAQ%2F7hf9zqpd6pvTd61wryTB4ivd9YOO7ety5WIco%2F3mBzSWCM%2BA9gvF2Migb3uMfF%2B4QfrHa%2FKUmGX%2FhD2VRxAWWeAvzXIezFVrdQ6iayOx5XJqO8Qs2kmINq24XIDOOSzmf3hNfNHljaSpgHH5H8%2By%2FAyiz4ElRAYC11EE4USCADnka2Cl40cRV0rgk5P7S3PM7bDMqzIMNQTQ2jledttsucgE2iAbRlZNhAH3N52P%2B8Q8EnybT%2Fa3CdQxv11CuPajELgMmqBJsaFDqvt3lTyym0KnfPmXKD9FAubJU2RQ7lWntB5bQmGdr%2Bnw9fjfBwi3x8mrisb2lXL1xSrPzfsgfjJ%2FyuXFaehPrAUBs1s2FIONHSBpPi5xZs4xb%2B5%2FM2bqbnCmf55VyqgnA%2BlJfiEVqyQypEulQ5BAc4qp94bnWr6%2BaxSVCtqWJQMfMfcGrjlYUDkiTnrnfc%2BbyCelDWvOpchArUR9Pitn6vJbiRERV%2BLClj%2F0DCdqtOU5bQADS6nF3IDRAC2a2KYkG1%2Bp2ZE9h7JPgvw3%2F98b74zm0UrO9DzYTjMACP2qI1fjMEKpNzpQVfbrRR%2B6J4RisorrGz0queqnfhlaiUDzLoCEzvBegacj11WANrrUO9ThXEp9TPYRBZUgZtg2bs%2BB4zHwIB1JIpGdEXWlsiS4Eb8R2v0ybhuEof9KC5GfAmYJTNc3%2ByymhVN%2FpZ3Baxzr5HUYq%2Ftf89kQ0jEVSLQMWGFTGdHTtt18B6t9eR2E0C7Q7j90wDYk6iF2GgTj6Gq%2FKEbKQgsxPwC1BiC987G5x0IdxaibMMntrcAGOpsBPPg2uT0B8S7BcS8IVJyMl4OIq0otn0EO1TxiQi9DiveI1ayE8b2YRIYkcLdqHEbk3rQVivBJZ%2B3H828yLqG39Q2J4Yfvh5HwNpk3NQYMy2rUIk6z%2B5SZvDnLt1FnDoYKVOblVW23Fj5ey%2BTcFt9ZIivMaNV%2B4U6Fn3A4b2XipBiEQZd05%2FuhfEV0XU9JCJolBmN5NL5nEqFfll0%3D&X-Amz-Signature=5d3e0dd0169cb342e8f4ae5ad7a35ee270ee48f24c4dd705298613aefbe36f9e&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_MWBE_Utilization_Form.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/160367/a4c3e8c9-be87-4f44-9ad5-053b7087fd10_contractorswagecertification.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4INCPVO2D%2F20250425%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250425T125348Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJT%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQDmVOcvfejbsm2TTwVIimgIYcw%2BeOxACT4CMs%2BQGpclKgIgenaPFqVoTLpCqxmM5heRhxuMdmMjKPgyjZYZjxKlLaEqgwUILRACGgw4OTIzNjQ2ODc2NzIiDOG3nDH5DWuXFFCADSrgBAQ%2F7hf9zqpd6pvTd61wryTB4ivd9YOO7ety5WIco%2F3mBzSWCM%2BA9gvF2Migb3uMfF%2B4QfrHa%2FKUmGX%2FhD2VRxAWWeAvzXIezFVrdQ6iayOx5XJqO8Qs2kmINq24XIDOOSzmf3hNfNHljaSpgHH5H8%2By%2FAyiz4ElRAYC11EE4USCADnka2Cl40cRV0rgk5P7S3PM7bDMqzIMNQTQ2jledttsucgE2iAbRlZNhAH3N52P%2B8Q8EnybT%2Fa3CdQxv11CuPajELgMmqBJsaFDqvt3lTyym0KnfPmXKD9FAubJU2RQ7lWntB5bQmGdr%2Bnw9fjfBwi3x8mrisb2lXL1xSrPzfsgfjJ%2FyuXFaehPrAUBs1s2FIONHSBpPi5xZs4xb%2B5%2FM2bqbnCmf55VyqgnA%2BlJfiEVqyQypEulQ5BAc4qp94bnWr6%2BaxSVCtqWJQMfMfcGrjlYUDkiTnrnfc%2BbyCelDWvOpchArUR9Pitn6vJbiRERV%2BLClj%2F0DCdqtOU5bQADS6nF3IDRAC2a2KYkG1%2Bp2ZE9h7JPgvw3%2F98b74zm0UrO9DzYTjMACP2qI1fjMEKpNzpQVfbrRR%2B6J4RisorrGz0queqnfhlaiUDzLoCEzvBegacj11WANrrUO9ThXEp9TPYRBZUgZtg2bs%2BB4zHwIB1JIpGdEXWlsiS4Eb8R2v0ybhuEof9KC5GfAmYJTNc3%2ByymhVN%2FpZ3Baxzr5HUYq%2Ftf89kQ0jEVSLQMWGFTGdHTtt18B6t9eR2E0C7Q7j90wDYk6iF2GgTj6Gq%2FKEbKQgsxPwC1BiC987G5x0IdxaibMMntrcAGOpsBPPg2uT0B8S7BcS8IVJyMl4OIq0otn0EO1TxiQi9DiveI1ayE8b2YRIYkcLdqHEbk3rQVivBJZ%2B3H828yLqG39Q2J4Yfvh5HwNpk3NQYMy2rUIk6z%2B5SZvDnLt1FnDoYKVOblVW23Fj5ey%2BTcFt9ZIivMaNV%2B4U6Fn3A4b2XipBiEQZd05%2FuhfEV0XU9JCJolBmN5NL5nEqFfll0%3D&X-Amz-Signature=c6274f5ceeac9f9e3f6bf7ac55d7eae94e4860cb33d2598ec0ffb5b50e9733da&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22contractorswagecertification.pdf%22&x-id=GetObject

File details come from the government source that posted it. Updated .