About this file
This document is a Justification for an Exception to Fair Opportunity (JEFO) issued by the Naval Air Systems Command (NAVAIR) Headquarters for a modification to an existing contract. The modification involves incorporating Technical Directives (TDs) into a P-8A Poseidon aircraft scheduled for maintenance at AAR Government Services' facility in July 2025. The action is being taken under the existing Indefinite Delivery Indefinite Quantity Multiple Award Contract (IDIQ MAC) N0001924D0109, with AAR as the primary awardee from a competitive solicitation for P-8A Airframe Depot Maintenance and Repair.
The sole-source modification is justified on the grounds of economy and efficiency, as competing the work would create duplicative actions requiring additional disassembly, reassembly, and inspection efforts by the U.S. Navy and Defense Contract Management Agency. The modification will be executed under a Time-and-Materials (T&M) Contract Line Item Number (CLIN) with a predetermined labor hour rate established during the original competitive source selection process. The estimated value of the modification is redacted, but the document indicates the government considers the pricing to be fair and reasonable based on the previously established competitive rates.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D E P A R T M E N T O F T H E N A V Y
N AV A L A I R S YS T E MS C O MM A N D
N AV A L A I R S YSTE MS C O MMA N D H E A DQ U A R T ERS
4 71 23 B USE RO A D, UN I T # I P T
P A TU XE NT R I V E R , MD 2 0 6 7 0 - 1 5 4 7
JEFO Number: 25-0275
JUSTIFICATION FOR AN
EXCEPTION TO FAIR OPPORTUNITY
1. Contracting Activity.
Naval Air Systems Command (NAVAIR) Headquarters
2. Nature and/or Description of Action Being Approved.
Pursuant to Federal Acquisition Regulation (FAR) 16.505(b)(2)(i)(C), this Justification for an Exception to Fair Opportunity (JEFO) authorizes and approves the award of an order modification as a logical follow-on to existing Order N0001924F5017 under Indefinite Delivery Indefinite Quantity Multiple Award Contract (IDIQ MAC) N0001924D0109 awarded to AAR Government Services, Inc. (AAR) Wood Dale, IL on 13 September 2024.
3. (including the estimated value).
The Maritime Patrol and Reconnaissance Aircraft program office (PMA-290) requires the incorporation of Technical Directives (TDs) into P-8A Poseidon aircraft . The specific TDs are . Incorporation of these TDs is required to ensure the aircraft is returned to the Government in the latest configuration.
The estimated value to fulfill the requirements is .
4. Identification of the Justification Rationale (see FAR 16.505(b)(2)) and, if applicable, a Demonstration of the Proposed Contractor's Unique Qualifications to Provide the Required Supply or Service.
Pursuant to FAR 16.505(b)(2)(i)(C), the contract action must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order.
As a result of P-8A Airframe Depot Maintenance and Repair competitive Solicitation N0001924R0002, AAR was awarded one of two IDIQ MACs and concurrently awarded the Primary Awardee for Years 1 through 3 Order which is Order N0001924F5017. At the initial award, the Order procured Phase-In/Stand Up activities and included Option Items of various P-8A airframe depot maintenance and repair services for up to P-8A aircraft. To date, that Order procures airframe depot maintenance and repair services for several P-8A Poseidon aircraft. A pending Order modification will exercise options procuring Planned Maintenance Interval (PMI) Induction, Maintenance Concurrent with PMI, and PMI Over and Above Discrepancies, and Landing Gear Standard Overhaul for P-8A Poseidon aircraft which is in July 2025. Including the procurement of incorporating TDs into aircraft with the pending modification, is a logical follow-on to the Order. Additionally, to compete the fulfillment of the requirements described in paragraph 3 above and award to the other IDIQ MAC contractor would create duplicative actions for the other contractor and the Government to perform. After fulfilling all other depot maintenance and repair requirements for the aircraft, AAR would be required to re-squadron personnel would be required to take del required to disassemble the aircraft and, subsequent to incorporating the TDs, reassemble the aircraft to an airworthiness state. The DCMA with cognizance over the other contractor would be required to inspect and accept the incorporation of the TDs squadron would be required to come out a second time to accept the aircraft delivery. These duplicative efforts would create negative cost and schedule impacts to the Government.
5. A Determination by the Contracting Officer that the Anticipated Cost to the Government will be Fair and Reasonable.
Bulletin TD Compliance Time-and- Materials (T&M) CLIN. The T&M CLIN has a single labor hour rate per year. The rate was established during the overarching competitive IDIQ MAC source selection process. Ultimately, the contractor will be paid for hours applied multiplied by the labor hour rate and actual materials costs incurred toward meeting the requirements in accordance with the contract. Based on the information provided and the prices previously established under adequate competition, the Contracting Officer anticipates the costs to the Government will be fair and reasonable.
6. Any other Facts Supporting the Justification.
None
7. A Statement of the Actions, if any, the Agency May Take to Remove or Overcome any Barriers that Led to the Exception to Fair Opportunity before any Subsequent Acquisition for the Supplies or Services is Made.
For the reasons set forth in Paragraph 4 above, NAVAIR has no plans at this time to offer fair opportunities on subsequent acquisitions of similar supplies or services.
CERTIFICATIONS AND APPROVAL
TECHNICAL/REQUIREMENTS CERTIFICATION
I certify that the facts and representations under my cognizance which are included in this Justification and its supporting acquisition planning documents, except as noted herein are complete and accurate to the best of my knowledge and belief.
LEGAL SUFFICIENCY REVIEW
I have determined this Justification is legally sufficient.
APPROVED
Upon the basis of the above justification, I hereby approve the solicitation of the proposed procurement(s) described herein using other than full and open competition, pursuant to the authority of FAR 16.505 (b)(2)(i)(C).