JCA Apron Rehab _ IFB PLANS.pdf
PDF 15 MB Posted
- Attached to
- Jackson County Airport West Apron Pavement Rehab
- Solicitation number
- PE-67800-NONST-2025-000000013
- Issued by
- Jefferson County, Georgia
About this file
This is a set of construction bid plans from Kimley-Horn and Associates for the Jackson County Airport Apron Pavement Rehabilitation project in Jefferson, Georgia, issued for bid in January 2025. The project involves rehabilitating the airport's transient and terminal aprons, including crack sealing, seal coating, asphalt overlay, installation of new aircraft tie-downs, and pavement marking. The work includes a 1.5-inch asphalt concrete overlay, installation of crack relief interlayer, adjustment of drainage structures, application of P-608 emulsified asphalt seal coat, and restriping of taxiway centerlines and aircraft parking positions. The project requires coordination with ongoing terminal building construction and maintaining airport operations during construction phases.
The project is designed by Kimley-Horn (Project No. 017999000) with survey work by Patterson & Dewar Engineers. The construction includes specific provisions for various aircraft types including Piper PA-28, Diamond DA-42, Cessna Citation, and King Air 350. The work must comply with Georgia Department of Transportation Standard Specifications (2021 Edition) and FAA specifications for electrical items. The project involves extensive safety and phasing requirements to maintain airport operations, including the use of barricades, temporary markings, and coordination with airport management for NOTAMs. Geotechnical investigation reveals pavement thickness varying from 4.0 to 4.75 inches of existing asphalt over 4.0 to 7.0 inches of base material.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 17999000 _ Airport Apron _ Feb 2025 Legal Ad.pdf | ||
| JCA Apron Rehab _ IFB CONTRACT DOCUMENTS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JACKSON COUNTY AIRPORT
APRON PAVEMENT REHABILITATION
JACKSON COUNTY
67 ATHENS STREET
JEFFERSON, GEORGIA 30549
PHONE: (706) 367-1493
CONTACT: TOM STRONG, AIRPORT MANAGER
KIMLEY-HORN AND ASSOCIATES, INC
11720 AMBER PARK DRIVE, SUITE 600,
ALPHARETTA, GA 30009
PHONE: (470) 890-4305
CONTACT: REBECCA M. COLLINS, P.E.
ENGINEER:OWNER: SURVEYOR:
PROJECT OWNER AND CONSULTANT INFORMATION
PATTERSON & DEWAR ENGINEERS
850 CENTER WAY
NORCROSS, GA, 30071
PHONE: (770) 453-1410
CONTACT: ZACH BUFFINGTON, PLS
VICINITY MAP
1" = 1 MILE
LOCATION MAP
1" = 1500'
D ra w in g na m e:
K :\A
TL
_A vi at io n\
_P ro du ct io n\
JC
A
- J ac ks on
C ou nt y
Ai rp or t\0
JC
A
- A pr on
P av em en t R eh ab ilit at io n\
C
AD
\P la nS he et s\ G
-0
-C O
VE
R
.d w g G
-0
Ja n
, 2
1:
am by : S am .M al te
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
PR
EP
AR
ED
F O
R
PR
O
JE
C T
DRAWING NUMBER
PROJECT NO.
DATE
017999000
N o.
IS
SU
AN
C
E
AN
D R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
S D
AT
E
BY
REVIEWED BY RMC
DESIGNED BY SAM
DRAWN BY TPS
GSWCC NO.
(LEVEL II) 0000058034
SHEET TITLE
AP
R
O N
P
AV
EM
EN
T R
EH
AB
IL
IT
AT
IO
N
PR
EP
AR
ED
B Y
01/28/2025
JA
C
KS
O
N C
O U
N
TY
AI
R
PO
R
T
SK
Y H
AR
BO
R W
AY
JE
FF
ER
SO
N
, G A
PH
O N
E:
(7
) 3
-1
K
IM
LE
Y- H
O R
N A
N D
A
SS
O C
IA
TE
S, IN
C
AM
BE
R
P
AR
K D
R
IV
E, S
U
IT
E
AL
PH
AR
ET
TA
, G
EO
R G
IA
PH
O
N E
(7
) 6
-4
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M
IS
SU
ED
F O
R B
ID
-0
1-
COVER
G-000 SHEET 01 of 14
NOTE: ALL MATERIALS USED SHALL BE IN ACCORDANCE WITH GEORGIA
DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS,
CONSTRUCTION OF TRANSPORTATION SYSTEMS, 2021 EDITION, OR BY
SPECIAL PROVISION, EXCEPT FOR ELECTRICAL ITEMS OF WORK, WHICH
SHALL BE IN ACCORDANCE WITH APPLICABLE FAA SPECIFICATIONS.
PROJECT AREAPROJECT AREA
JEFFERSON, GEORGIA
GDOT PID XXXXXX
KIMLEY-HORN PROJECT NO. 017999000
JANUARY 2025
ISSUED FOR BID PLANS
SHEET INDEX
SHEET NUMBER SHEET TITLE DRAWING NUMBER
01 COVER G-000
02 QUANTITIES, GENERAL NOTES, AND LEGEND G-001
03 PROJECT LAYOUT AND SAFETY PHASING PLAN G-101
04 PROJECT LAYOUT DETAILS G-102
05 SURVEY CONTROL AND BORING LOG G-201
06 EXISTING CONDITIONS PLAN C-101
07 GRADING, DRAINAGE AND EROSION CONTROL PLAN C-201
08 PAVING PLAN C-301
09 PROFILES C-302
10 SEAL COAT PLAN C-401
11 MARKING AND STRIPING PLAN (SHEET 1 OF 2) C-501
12 MARKING AND STRIPING PLAN (SHEET 2 OF 2) C-502
13 CONSTRUCTION DETAILS (SHEET 1 OF 2) C-601
14 CONSTRUCTION DETAILS (SHEET 2 OF 2) C-602
D ra w in g na m e:
K :\A
TL
_A vi at io n\
_P ro du ct io n\
JC
A
- J ac ks on
C ou nt y
Ai rp or t\0
JC
A
- A pr on
P av em en t R eh ab ilit at io n\
C
AD
\P la nS he et s\ G
-0
-C O
VE
R
.d w g G
-0
, 2
1:
am .M al te
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
PR
EP
AR
ED
F O
R
PR
O
JE
C T
DRAWING NUMBER
PROJECT NO.
DATE
017999000
N o.
IS
SU
AN
C
E
AN
D R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
S D
AT
E
BY
REVIEWED BY RMC
DESIGNED BY SAM
DRAWN BY TPS
GSWCC NO.
(LEVEL II) 0000058034
SHEET TITLE
AP
R
O N
P
AV
EM
EN
T R
EH
AB
IL
IT
AT
IO
N
PR
EP
AR
ED
B Y
01/28/2025
JA
C
KS
O
N C
O U
N
TY
AI
R
PO
R
T
SK
Y H
AR
BO
R W
AY
JE
FF
ER
SO
N
, G A
PH
O N
E:
(7
) 3
-1
K
IM
LE
Y- H
O R
N A
N D
A
SS
O C
IA
TE
S, IN
C
AM
BE
R
P
AR
K D
R
IV
E, S
U
IT
E
AL
PH
AR
ET
TA
, G
EO
R G
IA
PH
O
N E
(7
) 6
-4
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M
IS
SU
ED
F O
R B
ID
-0
1-
QUANTITIES, GENERAL
NOTES, AND LEGEND
G-001 SHEET 02 of 14
ABBREVIATIONS
AC ASPHALT CONCRETE
ALT ALTERNATE
ARP AIRPORT REFERENCE POINT
BC BEGINNING OF CURVE
BM BENCH MARK
CBR CALIFORNIA BEARING RATIO
CF CUBIC FEET
CL CENTER LINE
CO CLEANOUT
CONC CONCRETE
CMP CORRUGATE METAL PIPE
CTB CEMENT TREATED BASE
CY CUBIC YARD
DIA DIAMETER
DI DROP INLET
DWG DRAWING
E EAST, EASTING
EA EACH
EC END OF CURVE
(E) EXISTING
ELEV, EL ELEVATION
EP EDGE OF PAVEMENT
EQ EQUAL
EX, EXIST EXISTING
FAA FEDERAL AVIATION ADMINISTRATION
FAR FEDERAL AVIATION REGULATION
FG FINISHED GRADE
GA GENERAL AVIATION
GB GRADE BREAK
HP HIGH POINT
ID INSIDE DIAMETER
IE INVERT ELEVATION
L LENGTH
LAT LATITUDE
LF LINEAR FEET
LONG LONGITUDINAL
LS LUMP SUM
LT LEFT
MAX MAXIMUM
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MON MONUMENT
MULT MULTIPLE
MSL MEAN SEA LEVEL
N NORTH, NORTHING
NAD NORTH AMERICAN DATUM
NAVD NORTH AMERICAN VERTICAL DATUM
NO NUMBER
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFF OFFSET
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
PC POINT OF CURVATURE
PCC PORTLAND CEMENT CONCRETE
PI POINT OF INTERSECTION
PL PROPERTY LINE
PC POINT OF CURVATURE
PT POINT OF TANGENCY
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
PVT POINT OF VERTICAL TANGENCY
R RADIUS
RCP REINFORCED CONCRETE PIPE
ROFA RUNWAY OBJECT FREE AREA
ROFZ RUNWAY OBSTACLE FREE ZONE
RP RADIUS POINT
RPR RESIDENT PROJECT REPRESENTATIVE
RPZ RUNWAY PROTECTION ZONE
RSA RUNWAY SAFETY AREA
RT RIGHT
RWY RUNWAY
S SLOPE
SD STORM DRAIN
SEC SECTION
SF SQUARE FEET
SPEC SPECIFICATIONS
STA STATION
STD STANDARD
SWPPP STORM WATER POLLUTION PREVENTION PLAN
SY SQUARE YARD
TOFA TAXIWAY OBJECT FREE AREAS
TOPO TOPOGRAPHY
TOW TOP OF WALL
TSA TAXIWAY SAFETY AREA
TWY TAXIWAY
TYP TYPICAL
VC VERTICAL CURVE
VERT VERTICAL
VSR VEHICLE SERVICE ROAD
1. THE CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL SAFETY REGULATIONS.
2. THE CONTRACTOR'S SUPERINTENDENT SHALL BE ON SITE AT ALL TIMES DURING WORKING HOURS WHILE THIS PROJECT IS IN PROGRESS. THE CONTRACTOR'S SUPERINTENDENT SHALL BE THE DESIGNATED RESPONSIBLE CONTRACTOR REPRESENTATIVE, AND SHALL BE AVAILABLE IN CASE OF EMERGENCIES ON A 24-HOUR
DAILY BASIS.
3. SEE SPECIFICATIONS FOR SAFETY, SECURITY AND OPERATING REQUIREMENTS.
4. THE PROVISIONS OF FAA ADVISORY CIRCULAR 150/5370-2G, "OPERATING SAFETY ON AIRPORTS DURING CONSTRUCTION", APPLY TO THIS PROJECT.
5. CONTRACTOR ACCESS TO WORK AREAS SHALL BE AS NOTED ON THE PLANS. SEE SPECIFICATIONS FOR SECURITY REQUIREMENTS FOR THE USE OF THE AIRPORT GATE.
LOCATIONS OF HAUL ROADS FROM STAGING AREAS SHALL BE AS NOTED ON THE PLANS AND SHALL BE COORDINATED WITH THE AIRPORT SPONSOR TO MINIMIZE
IMPACTS ON THE AIRPORT.
6. ROADS USED AS CONTRACTOR ROUTES WILL BE USED BY OTHER VEHICLES. THE CONTRACTOR SHALL NOT INTERFERE WITH OTHER VEHICLE TRAFFIC AND SHALL YIELD
TO EMERGENCY VEHICLES ALONG ANY OF THE PUBLIC ROADS.
7. THE CONTRACTOR SHALL FURNISH ALL PLANTS, LABOR, MATERIAL, EQUIPMENT, AND TRANSPORTATION NECESSARY TO CONSTRUCT ALL ELEMENTS OF THIS PROJECT AS DESCRIBED IN THE CONSTRUCTION PLANS AND SPECIFICATIONS. THE PROJECT PAY ITEMS ARE INTENDED TO BE INCLUSIVE OF ALL WORK TO BE PERFORMED AS SHOWN IN THESE PLANS. ALL INCIDENTAL WORK TO COMPLETE THE PROJECT, TO THE SATISFACTION OF THE RESIDENT PROJECT REPRESENTATIVE (RPR), SHALL BE
INCLUDED IN THE COST OF PERFORMING THE VARIOUS ITEMS OF WORK.
8. THE RULES, REGULATIONS AND REFERENCE SPECIFICATIONS, ENUMERATED HEREIN, SHALL BE CONSIDERED MINIMUM REQUIREMENTS. THEY SHALL NOT RELIEVE THE CONTRACTOR FROM FURNISHING AND INSTALLING HIGHER GRADES OF MATERIAL AND WORKMANSHIP THAN ARE SPECIFIED HEREIN, OR WHEN SO REQUIRED.
9. THE CONTRACTOR SHALL PAY CLOSE ATTENTION TO THE SAFETY PLANS AND TO THE AIRPORT SAFETY REQUIREMENTS SECTION OF THE SPECIFICATIONS. THESE SHALL
BE STRICTLY ENFORCED.
10. CONSTRUCTION WILL BE IN AIRPORT OPERATIONAL AREAS. ALL RUBBISH AND DEBRIS RESULTING FROM WORK SHALL BE REMOVED FROM THE SITE BY THE
CONTRACTOR AS NEEDED THROUGHOUT THE DAY AND A MINIMUM OF ONCE DAILY.
11. PERMITS: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN AND PAY FOR ALL APPLICABLE PERMITS FOR CONSTRUCTION, CONSTRUCTION RELATED
ACTIVITIES, AND EQUIPMENT.
12. CLOSURES: WHEN CLOSURES ARE REQUIRED, THEY SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS DETAILED IN THE SAFETY PLANS.
13. SURPLUS MATERIAL: UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL REMOVE FROM THE SITE, ALL SURPLUS MATERIAL AND EQUIPMENT BELONGING TO HIM/HER, OR SUBCONTRACTOR'S FORCES AND RESTORE THE SITE TO THE SATISFACTION OF THE RPR.
14. THE CONTRACTOR SHALL ATTEND A PRECONSTRUCTION MEETING PRIOR TO BEGINNING WORK, TO COORDINATE WORK PROCEDURES WITH ALL INTERESTED PARTIES.
THE CONTRACTOR SHALL ALSO ATTEND ALL JOB MEETINGS CALLED BY THE RPR. THE CONTRACTOR SHALL CONTACT A PRIVATE UTILITY LOCATOR AND AIRPORT REPRESENTATIVES TO IDENTIFY UNDERGROUND CABLES, WATERLINES, ETC., PRIOR TO STARTING WORK. A MINIMUM OF 2 BUSINESS DAYS IS REQUIRED FOR
IDENTIFICATION OF AIRPORT UTILITIES.
15. ALL SALVAGEABLE ITEMS REMOVED FROM THE WORK SITE SHALL REMAIN THE PROPERTY OF THE AIRPORT AS DIRECTED.
16. CONTROL: THE CONTRACTOR SHALL SET BASIC REFERENCE LINE AND BENCH MARK GRADE CONTROL FROM WHICH THE WORK IS BUILT. ALL ELEVATIONS ARE BASED ON USGS DATUM. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXTENDING THE CONTROL AND FURNISHING ALL ADDITIONAL STAKING AND MARKING NECESSARY TO ACCOMPLISH THE WORK. THE CONTRACTOR SHALL CAREFULLY PRESERVE ALL CONTROL AND WILL BE RESPONSIBLE FOR THE COST OF RESETTING ANY CONTROL DESTROYED OR DISTURBED DUE TO NEGLIGENCE OR CONSTRUCTION EFFORTS OF THE CONTRACTOR.
17. EXISTING UTILITIES: THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN EXCAVATING IN AREAS OF EXISTING UTILITIES. EXISTING UTILITIES SHALL BE LOCATED (POT HOLED) AND MARKED IN ADVANCE OF EXCAVATION IN ALL AREAS. ANY DAMAGE DONE TO FUNCTIONING UTILITIES SHALL BE REPAIRED IMMEDIATELY BY THE CONTRACTOR AT HIS/HER EXPENSE AND AS DIRECTED. THE LOCATION OF ANY UTILITIES SHOWN ON THE PLANS IS APPROXIMATE ONLY, DEPTHS ARE NOT KNOWN.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING OR REPAIRING ALL DAMAGE TO AIRPORT PROPERTY CAUSED BY HIS/HER FORCES AND HIS/HER
SUBCONTRACTOR'S FORCES.
18. HAUL ROUTES: LOCATION OF HAUL ROUTES ON THE AIRPORT SITE SHALL BE AS SPECIFIED ON THE PLANS OR AS APPROVED BY THE RPR AND/OR AIRPORT OPERATIONS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE OFF-SITE HAUL ROUTES (STATE HIGHWAYS, COUNTY ROADS OR CITY STREETS) WITH THE APPROPRIATE OWNER WHO HAS JURISDICTION OVER THE AFFECTED ROUTE. ON-SITE HAUL ROUTES SHALL BE MAINTAINED BY THE CONTRACTOR AND SHALL BE RESTORED TO THEIR ORIGINAL CONDITION UPON COMPLETION OF BEING USED AS A HAUL ROUTE. THE BEFORE AND AFTER CONDITION OF ON-SITE HAUL ROUTES SHALL BE JOINTLY INSPECTED AND DETERMINED BY THE CONTRACTOR, THE RPR AND AIRPORT REPRESENTATIVES. FENCING, DRAINAGE, GRADING AND OTHER MISCELLANEOUS CONSTRUCTION REQUIRED TO CONSTRUCT TEMPORARY HAUL ROUTES OR ACCESS POINTS ON THE AIRPORT WILL BE THE CONTRACTOR'S TOTAL RESPONSIBILITY AND SHALL BE APPROVED BY THE AIRPORT OPERATIONS PRIOR TO THE WORK. ALL ON-SITE ACCESS ROADS SHALL REMAIN OPEN AND MAINTAINED AT ALL TIMES. PHOTOGRAPHS AND A VIDEO OF THE HAUL ROUTES SPECIFIED BY THE PLANS MUST BE PROVIDED BY THE CONTRACTOR BEFORE AND AFTER CONSTRUCTION TO THE AIRPORT ADMINISTRATION. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO HAUL ROUTES RESULTING FROM
CONSTRUCTION TRAFFIC.
19. HAUL ROUTES ON AIRFIELD PAVEMENT: ALL HAUL ROUTES ACROSS PAVEMENTS SHALL REQUIRE PLACEMENT OF STEEL PLATING PER THE DIRECTION OF THE RPR TO PROTECT EXISTING PAVEMENT. DAMAGE TO PAVEMENTS SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE.
20. CONSTRUCTION LIMITS: ALL CONTRACTOR VEHICLES AND TRAFFIC SHALL REMAIN WITHIN THE DESIGNATED CONSTRUCTION LIMITS OR HAUL ROUTES. ABSOLUTELY NO CONTRACTOR VEHICLES WILL BE ALLOWED ON OTHER ACTIVE MOVEMENT AREAS. CONTRACTOR HAUL ROUTES ACROSS ACTIVE AIRFIELD PAVEMENTS WILL REQUIRE CONSTRUCTION TRAFFIC TO YIELD TO AIRCRAFT SIGNAGE AS COORDINATED WITH AIRPORT PERSONNEL.
21. CONTRACTOR UTILITIES: STAGING AREAS DO NOT HAVE UTILITIES. ANY UTILITIES REQUIRED BY THE CONTRACTOR SHALL BE COORDINATED WITH THE UTILITY
COMPANIES AND SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
22. ASPHALT CONCRETE REMOVAL AND DISPOSAL: ALL ASPHALT PAVEMENT DESIGNATED FOR REMOVAL SHALL BE PULVERIZED. THE RESULTING GRINDINGS SHALL BE
HAULED AND PLACED IN THE LOCATION SHOWN ON THE PLANS.
23. CEMENT CONCRETE WASTE DISPOSAL: ASPHALT AND CONCRETE RUBBLE/WASTE MATERIAL REMOVED FROM THE CONSTRUCTION AREA SHALL BE REMOVED FROM AIRPORT PROPERTY. RUBBLE WILL NOT BE DISPOSED OF IN ANY WASTE AREA SHOWN ON THE PLANS. PAVEMENT/FOUNDATION REMOVAL MATERIALS SHALL BE
DISPOSED OFFSITE OR REUSED UNDER INSTRUCTION OF THE RPR.
24. COORDINATION OF CONSTRUCTION ACTIVITIES: THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING CONSTANT COORDINATION BETWEEN THE SUBCONTRACTORS AND THE RPR. ALL CONSTRUCTION ACTIVITIES PLANNED BY THE CONTRACTOR SHALL BE REVIEWED AND APPROVED BY THE RPR AND AIRPORT
OPERATIONS REPRESENTATIVES.
GENERAL NOTES
1. ALL EXISTING STRUCTURES ENCOUNTERED WITHIN THE ESTABLISHED LINES, GRADES, OR GRADING SECTIONS SHALL BE REMOVED BY THE CONTRACTOR, UNLESS SUCH EXISTING STRUCTURES ARE OTHERWISE SPECIFIED TO BE RELOCATED, ADJUSTED, SALVAGED, ABANDONED IN PLACE, REUSED TO THE WORK OR TO REMAIN IN PLACE.
2. SHOULD THE CONTRACTOR ENCOUNTER AN EXISTING STRUCTURE (ABOVE OR BELOW GROUND) WITHIN THE WORK AREA LIMITS FOR WHICH THE DISPOSITION IS NOT INDICATED ON THE PLANS, THE ENGINEER SHALL BE NOTIFIED PRIOR TO DISTURBING SUCH STRUCTURE. THE DISPOSITION OF EXISTING STRUCTURES SO ENCOUNTERED
SHALL BE DETERMINED BY THE ENGINEER.
3. THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO THE DISCONNECTION, MODIFICATION, AND/OR REMOVAL OF UTILITIES. THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANY CONCERNING PORTIONS OF WORK WHICH MAY BE PERFORMED BY THE UTILITY COMPANY'S FORCES AND PAY ANY RESULTING FEES WHICH ARE TO BE PAID TO THE UTILITY COMPANY FOR THEIR SERVICES. THE CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES ASSOCIATED WITH THE DISCONNECTION, MODIFICATION, RELOCATION, RECONNECTION, AND/OR REMOVAL OF UTILITIES.
4. ELECTRICAL, TELEPHONE, CABLE, WATER, FIBER OPTIC CABLE AND/OR GAS LINES NEEDING TO BE REMOVED AND/OR RELOCATED SHALL BE COORDINATED WITH THE
AFFECTED UTILITY COMPANY.
5. DRAWINGS DO NOT PURPORT TO SHOW ALL EXISTING PUBLIC OR PRIVATE UTILITIES.
6. ANY EXISTING UTILITIES SHOWN ARE NOT TO BE INTERPRETED AS THE EXACT LOCATION, OR AS THE ONLY UNDERGROUND OBSTACLES OR ABOVE GROUND UTILITIES THAT MAY OCCUR ON THE SITE. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND PROCEED WITH CAUTION AROUND ANY SUCH FEATURES. THE CONTRACTOR SHALL GIVE PROPER AND SUFFICIENT NOTICE TO ALL UTILITY COMPANIES REGARDING REMOVAL/RELOCATION OF ALL SERVICE LINES. UNLESS OTHERWISE NOTED ON THE PLANS ALL UNDERGROUND UTILITIES WHICH ARE TAKEN OUT OF SERVICE SHALL BE REMOVED AND THE EXCAVATIONS/TRENCHES BACK FILLED IN ACCORDANCE
WITH PROJECT SPECIFICATIONS.
7. DAMAGE TO ANY EXISTING IMPROVEMENTS AS A RESULT OF THE CONTRACTOR’S OPERATIONS WILL BE REPLACED AT CONTRACTOR’S SOLE EXPENSE AND TO THE
SATISFACTION OF THE ENGINEER.
DEMOLITION GENERAL NOTES
SUMMARY OF QUANTITIES
DD
D D D
D
DD
D D
D
RUNWAY 35 PAPI
RUNWAY 17 PAPI
AIRPORT TERMINAL
CONTRACTOR
HAUL ROUTE CONTRACTOR
STAGING AREA
CENTER
TRANSIENT APRON
A
B D
E
F
N
O P
M
G H
I J
KL
0'
0'
LOW PROFILE BARRICADES TO
BE INSTALLED AT RSA, TYP.
CONTRACTOR-SUPPLIED TEMPORARY CLOSED TAXIWAY
MARKING TO BE PLACED AT ENTRANCE TO RUNWAY, TYP.
NEW AIRPORT
TERMINAL, BY OTHERS
RUNWAY 17-35 (5,010'L X 75'W)
HIGHWAY 82N
AIRPORT RD
LAUREN DR
LYLE FIELD RD
TA
XI
W
AY
B
LYLE FIELD
R
D
TAXIWAY A
HIGHWAY 82N
SKY HARBOR WAY
C
TERMINAL APRON
D ra w in g na m e:
K :\A
TL
_A vi at io n\
_P ro du ct io n\
JC
A
- J ac ks on
C ou nt y
Ai rp or t\0
JC
A
- A pr on
P av em en t R eh ab ilit at io n\
C
AD
\P la nS he et s\ G
-1
LA
YO
U
T
SA
FE
TY
P
H
AS
IN
G
P
LA
N .d w g
G -1
, 2
1:
am
.M al te
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
PR
EP
AR
ED
F O
R
PR
O
JE
C T
DRAWING NUMBER
PROJECT NO.
DATE
017999000
N o.
IS
SU
AN
C
E
AN
D R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
S D
AT
E
BY
REVIEWED BY RMC
DESIGNED BY SAM
DRAWN BY TPS
GSWCC NO.
(LEVEL II) 0000058034
SHEET TITLE
AP
R
O N
P
AV
EM
EN
T R
EH
AB
IL
IT
AT
IO
N
PR
EP
AR
ED
B Y
01/28/2025
JA
C
KS
O
N C
O U
N
TY
AI
R
PO
R
T
SK
Y H
AR
BO
R W
AY
JE
FF
ER
SO
N
, G A
PH
O N
E:
(7
) 3
-1
K
IM
LE
Y- H
O R
N A
N D
A
SS
O C
IA
TE
S, IN
C
AM
BE
R
P
AR
K D
R
IV
E, S
U
IT
E
AL
PH
AR
ET
TA
, G
EO
R G
IA
PH
O
N E
(7
) 6
-4
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M
IS
SU
ED
F O
R B
ID
-0
1-
N O
R
TH
WORK ITEMS:
LEGEND
EXISTING EDGE OF PAVEMENT
AIRPORT PROPERTY / R.O.W. LINE
EXISTING FENCE
RUNWAY PROTECTION ZONE
RUNWAY SAFETY AREA
RUNWAY OBJECT FREE AREA
CONTRACTOR HAUL
LOW PROFILE BARRICADES
LIMITS OF CONSTRUCTION
PROJECT GENERAL NOTES
1. THE CONTRACTOR'S STAGING AREA, ACCESS ROUTE FOR INGRESS AND EGRESS FROM THE
AIRPORT AND HAUL ROUTE SHALL BE AS SHOWN ON THIS SHEET. CHANGES TO AIRPORT
ACCESS OR HAUL ROUTE SHALL BE COORDINATED WITH ENGINEER AND OWNER.
2. CONTRACTOR'S STAGING AREA SHALL BE USED FOR THE CONTRACTOR'S FIELD OFFICE, AS A
SITE FOR PARKING CONSTRUCTION EQUIPMENT, AS AN AUTOMOBILE PARKING AREA FOR THE
CONTRACTOR'S EMPLOYEES, AND IN GENERAL AS A BASE OF OPERATIONS FOR THE
CONTRACTOR.
3. THE CONTRACTOR SHALL CONFINE HIS ACTIVITIES TO THE ACCESS ROUTE, THE HAUL ROUTE, THE STAGING AREA AND CONSTRUCTION AREA, AND SHALL NOT PERMIT HIS EMPLOYEES OR
EQUIPMENT TO ENTER OR CROSS ANY PORTION OF THE AIRPORT OPERATIONS AREA
(RUNWAYS, TAXIWAYS, APRONS) OR PERFORM ANY CONSTRUCTION WITHIN THIS AREA
WITHOUT PRIOR PERMISSION FROM DESIGNATED AIRPORT REPRESENTATIVE.
4. UPON COMPLETION OF WORK, THE CONTRACTOR SHALL RESTORE ALL DISTURBED AREAS
(WITHIN THE CONSTRUCTION LIMITS), INCLUDING THE ACCESS ROUTES AND STAGING AREAS,
TO THEIR ORIGINAL CONDITION. NO SEPARATE PAY ITEM FOR THIS WORK.
5. ALL REQUIRED BARRICADES, SPECIAL MARKING, AND FLAGGING OF AIRPORT OPERATIONS
AREAS, ETC. SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL CONFORM TO
THE REQUIREMENTS OF FAA ADVISORY CIRCULAR NO. 150/5370-2G FOR CONSTRUCTION ON
AIRPORTS. NO SEPARATE MEASUREMENT OR PAYMENT FOR THESE ITEMS.
6. THE CONTRACTOR SHALL HAVE A RADIO AVAILABLE AND IN USE AT ALL TIMES WHILE
WORKING ON THE AIRFIELD (122.975). TWO-WAY RADIO COMMUNICATION SHALL BE REQUIRED
FOR ALL VEHICLES USING CONTRACTOR'S HAUL ROUTE.
7. THE AIRPORT MANAGER SHALL ISSUE NOTAMS REGARDING CONSTRUCTION ACTIVITIES IF
NEEDED AND IS TO BE KEPT INFORMED REGARDING AIRFIELD CONDITIONS DURING
CONSTRUCTION. ACTIVITIES REQUIRING A NOTAM SHALL REQUIRE AT LEAST 72 HOURS
NOTICE TO AIRPORT MANAGEMENT BY THE CONTRACTOR.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND IDENTIFICATION OF ALL
EXISTING UTILITIES OR PIPELINES IN THE CONSTRUCTION AREA, REPAIRS TO EXISTING
UTILITIES OR PIPELINES (ON OR OFF AIRPORT PROPERTY) DAMAGED BY CONTRACTOR SHALL
BE THE RESPONSIBILITY OF THE CONTRACTOR. NO REIMBURSEMENT SHALL BE ALLOWED FOR
UTILITY / PIPELINE REPAIR OR REPLACEMENT.
9. CONTRACTOR'S ATTENTION IS CALLED TO SAFETY PROVISIONS OF SPECIFICATIONS AND
PARTICULAR TO SECTION 01030 (CONSTRUCTION SAFETY PLAN) THAT REFERS TO FAA
ADVISORY CIRCULAR NO. 150/5370-2F (OR LATEST EDITION).
10. CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFICATION AND LOCATIONS OF ALL SURVEY
MARKERS IN THE CONSTRUCTION AREA. MARKERS DISTURBED BY THE CONSTRUCTION SHALL
BE REPLACED WITH AN EQUIVALENT OR A REPORT MADE TO THE ENGINEER AS TO WHY THE
MARKER COULD NOT BE REPLACED.
11. CONTRACTOR TO REMOVE TRASH AND FOREIGN OBJECT DEBRIS (FOD) DAILY.
12. THIS PROJECT UTILIZES GEORGIA STATE PLANE-WEST COORDINATES.
13. CONTRACTOR SHALL FOLLOW THE REQUIREMENTS OF FAA ADVISORY CIRCULAR
NO.150/5210-5D FOR PAINTING, MARKING AND LIGHTING OF VEHICLES USED ON AIRPORT.
FLASHING LIGHT SHALL BE REQUIRED FOR ALL VEHICLES USING CONTRACTOR'S HAUL ROUT.
ALL VEHICLES MUST BE PROVIDED WITH A FLAG ON A STAFF ATTACHED TO THE VEHICLE SO
THAT THE FLAG SHALL BE READILY VISIBLE. THE FLAG MUST BE AT LEAST A 3' BY 3' SQUARE
HAVING A CHECKERED PATTERN OF INTERNATIONAL ORANGE AND WHITE SQUARES ORANGE
AND WHITE SQUARES AT LEAST 1' ON EACH SIDE.
GENERAL SEQUENCE OF CONSTRUCTION
1. PRE-CONSTRUCTION MEETING TO BE HELD ONSITE PRIOR TO
COMMENCEMENT OF ACTIVITIES. ENGINEER TO SCHEDULE AND
CONTACT ALL ATTENDEES TO INCLUDE, BUT NOT LIMITED TO; OWNER,
AGENCY REPRESENTATIVES, CONTRACTORS AND SUB-CONTRACTORS.
2. CONTRACTOR TO INSTALL EROSION CONTROL BMPs PRIOR TO GROUND
DISTURBANCE.
3. CONTRACTOR TO OBLITERATE EXISTING MARKINGS BY WATER
BLASTING.
4. CONTRACTOR TO CLEAN ALL JOINTS AND CRACK AND CRACK SEAL
TRANSIENT AND TERMINAL APRONS.
5. CONTRACTOR TO SEAL COAT TERMINAL APRON.
6. CONTRACTOR TO OVERLAY CENTER TRANSIENT APRON, ADJUST INLET
GRATES TO GRADE AND DRESS SHOULDERS TO DRAIN.
7. CONTRACTOR'S SURVEYOR TO LAY OUT PROPOSED AIRCRAFT
TIE-DOWNS AND APRON STRIPING.
8. CONTRACTOR TO INSTALL TIE-DOWN ANCHORS ON CENTER TRANSIENT
APRON AS PER PLANS.
9. CONTRACTOR TO PLACE TEMPORARY MARKING ON CENTER TRANSIENT
AND TERMINAL APRONS AFTER ASPHALT HAS CURED.
10. CONTRACTOR TO MARK PERMANENT PAINT 30 DAYS AFTER PLACEMENT
OF TEMPORARY MARKINGS.
11. CONTRACTOR TO MULCH AND SEED ALL DISTURBED AREAS.
12. DESIGN PROFESSIONAL AND OWNER TO INSPECT SITE FOR
CONSTRUCTION COMPLIANCE. CONTRACTOR TO REPAIR ITEMS
DETERMINED UNSUITABLE.
1. CRACK SEAL AND OVERLAY CENTER TRANSIENT APRON.
2. INSTALL NEW TIE-DOWNS ON CENTER TRANSIENT APRON.
3. CRACK SEAL AND SEAL COAT TERMINAL APRON.
4. RE-MARK CENTER TRANSIENT AND TERMINAL APRON.
PROJECT LAYOUT AND
SAFETY PHASING PLAN
G-101 SHEET 03 of 14 w in g na m e:
K :\A
TL
_A vi at io n\
_P ro du ct io n\
JC
A
- J ac ks on
C ou nt y
Ai rp or t\0
JC
A
- A pr on
P av em en t R eh ab ilit at io n\
C
AD
\P la nS he et s\ G
-1
LA
YO
U
T
SA
FE
TY
P
H
AS
IN
G
P
LA
N .d w g
G
, 2
1:
am
.M al te
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
PR
EP
AR
ED
F O
R
PR
O
JE
C T
DRAWING NUMBER
PROJECT NO.
DATE
017999000
N o.
IS
SU
AN
C
E
AN
D R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
S D
AT
E
BY
REVIEWED BY RMC
DESIGNED BY SAM
DRAWN BY TPS
GSWCC NO.
(LEVEL II) 0000058034
SHEET TITLE
AP
R
O N
P
AV
EM
EN
T R
EH
AB
IL
IT
AT
IO
N
PR
EP
AR
ED
B Y
01/28/2025
JA
C
KS
O
N C
O U
N
TY
AI
R
PO
R
T
SK
Y H
AR
BO
R W
AY
JE
FF
ER
SO
N
, G A
PH
O N
E:
(7
) 3
-1
K
IM
LE
Y- H
O R
N A
N D
A
SS
O C
IA
TE
S, IN
C
AM
BE
R
P
AR
K D
R
IV
E, S
U
IT
E
AL
PH
AR
ET
TA
, G
EO
R G
IA
PH
O
N E
(7
) 6
-4
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M
IS
SU
ED
F O
R B
ID
-0
1-
PROJECT LAYOUT
DETAILS
G-102 SHEET 04 of 14
LOW PROFILE BARRICADE NOTES:
1. MAXIMUM TOTAL HEIGHT OF BARRICADES SHALL NOT BE MORE THAN 18 INCHES.
2. TYPICAL BARRICADE SHALL BE PLACED, ALONG THE LIMITS OF THE PHASES OF WORK, AS SHOWN IN THESE PLANS TO DELINEATE THE CONTRACTOR'S WORK AREAS
AND CLOSED TAXIWAYS/TAXILANES/APRONS.
3. BARRICADES SHALL EITHER BE WATERFILLED OR WEIGHTED WITH SANDBAGS TO SECURE AGAINST JET BLAST. SANDBAGS SHALL BE A MINIMUM OF 25 LBS. EACH WITH
ONE PLACED ON EACH END.
4. ALL BARRICADES AND SANDBAGS SHALL BE CHECKED VISUALLY FOR SIGNS OF WEAR AND TEAR ON A DAILY BASIS. BARRICADES SHALL BE REPAINTED AND SANDBAGS REPLACED WHEN DEEMED APPROPRIATE BY THE OWNER. ALL LIGHT FIXTURES SHALL BE IN GOOD WORKING ORDER AND SHALL BE CHECKED BY THE CONTRACTOR
ON A DAILY BASIS BEFORE THE CONTRACTOR CEASES OPERATIONS FOR THE DAY.
5. ALL BARRICADES SHALL BE MOVED AT LEAST ONCE EACH WEEK AND THE CONTRACTOR SHALL SWEEP THE ACCUMULATED DEBRIS AND REMOVE AND DISPOSE OF THE DEBRIS OFFSITE AT AN APPROVED DISPOSAL FACILITY. THE BARRICADES SHALL THEN BE REPLACED AT THE APPROPRIATE LOCATION.
6. CAUTION LIGHTS SHALL BE RED IN COLOR AND FLASHING DURING HOURS OF LOW VISIBILITY AND DARKNESS.
7. ALL LOW PROFILE BARRICADES ARE TO BE PLACED AT A MAXIMUM INTERVAL OF 4 FEET END TO END ALONG OPERATIONAL PAVEMENT ADJACENT TO CONSTRUCTION
OR AS DIRECTED BY THE ENGINEER.
8. THE CONTRACTOR MAY SUBSTITUTE AN EQUAL LOW PROFILE BARRICADE APPROVED BY THE ENGINEER, GENERALLY CONFORMING TO THE ABOVE DETAILS, AND
CONFORMING TO THE SPECIFICATIONS.
9. COST OF FURNISHING AND MAINTAINING BARRICADES SHALL BE INCLUDED IN THE CONTRACTORS BID UNIT COST FOR ITEM M-102-5.1 MAINTENANCE OF TRAFFIC AND
TEMPORARY CONSTRUCTION ITEMS.
6"
6"WHEN BARRICADE LINE CROSSES
TAXIWAY/TAXILANE LOW PROFILE
BARRICADE SHALL BE CENTERED ON
TAXIWAY/TAXILANE CENTERLINE.
3'
3'
CONTRACTOR-SUPPLIED LOW PROFILE BARRICADE (TYPE I)1
G-102 NOT TO SCALE
VEHICLE FLAG DETAIL2
G-102 NOT TO SCALE
VEHICLE FLAG NOTES:
1. ALL VEHICLES SHALL BE EQUIPPED WITH A FLAG WHILE IN
THE AIRCRAFT OPERATIONS AREA (AOA).
2. ALL FLAGS SHALL BE INCLUDED AND IS INCIDENTAL TO PAY
ITEM M-102-5.1 MAINTENANCE OF TRAFFIC AND TEMPORARY
CONSTRUCTION ITEMS.
TEMPORARY CLOSED TAXIWAY MARKING NOTES:
1. TEMPORARY CLOSED TAXIWAY MARKINGS SHALL BE CONSTRUCTED
OF AN EASILY REMOVABLE MATERIAL, SUCH AS PLYWOOD OR
FABRIC, AND HELD IN PLACE WITH SAND BAGS PAINTED YELLOW.
TEMPORARY CLOSED TAXIWAY MARKINGS SHALL BE SOLID YELLOW
IN COLOR.
2. THE CONTRACTOR SHALL PLACE TEMPORARY CLOSED TAXIWAY
MARKINGS AT RUNWAY INTERSECTIONS ON THE CENTERLINE OF
THE FACILITY TO BE CLOSED AS SHOWN ON PLANS OR AS DIRECTED
BY THE RPR.
3. NO PAYMENT SHALL BE MADE FOR RELOCATIONS OF TEMPORARY
CLOSED TAXIWAY MARKINGS.
CONTRACTOR-SUPPLIED TEMPORARY CLOSED TAXIWAY MARKINGS3
G-102 NOT TO SCALE
ORANGE MOLDED BODY WITH
HIGH REFLECTIVE WHITE STRIPES
8'-0" (TYP.)
STANDARD SOLAR-POWERED
(OR BATTERY-POWERED) 3-WAY
6 VOLT BARRICADE LIGHT WITH
RED LENS
TO
R
U N
W
AY
7-
TA
XI
W
AY
A
RUNWAY 35 PAPI
WIND CONE AND
SEGMENTED CIRCLE
GRAVEL DRIVE
D ra w in g na m e:
K :\A
TL
_A vi at io n\
_P ro du ct io n\
JC
A
- J ac ks on
C ou nt y
Ai rp or t\0
JC
A
- A pr on
P av em en t R eh ab ilit at io n\
C
AD
\P la nS he et s\ G
-2
SU
R
VE
Y C
O N
TR
O
L
G
EO
TE
C
H N
IC
AL
B O
R
IN
G L
O G
.d w g G
-2
, 2
1:
am .M al te
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
PR
EP
AR
ED
F O
R
PR
O
JE
C T
DRAWING NUMBER
PROJECT NO.
DATE
017999000
N o.
IS
SU
AN
C
E
AN
D R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
S D
AT
E
BY
REVIEWED BY RMC
DESIGNED BY SAM
DRAWN BY TPS
GSWCC NO.
(LEVEL II) 0000058034
SHEET TITLE
AP
R
O N
P
AV
EM
EN
T R
EH
AB
IL
IT
AT
IO
N
PR
EP
AR
ED
B Y
01/28/2025
JA
C
KS
O
N C
O U
N
TY
AI
R
PO
R
T
SK
Y H
AR
BO
R W
AY
JE
FF
ER
SO
N
, G A
PH
O N
E:
(7
) 3
-1
K
IM
LE
Y- H
O R
N A
N D
A
SS
O C
IA
TE
S, IN
C
AM
BE
R
P
AR
K D
R
IV
E, S
U
IT
E
AL
PH
AR
ET
TA
, G
EO
R G
IA
PH
O
N E
(7
) 6
-4
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M
IS
SU
ED
F O
R B
ID
-0
1-
SURVEY NOTES:
1. SURVEY DATA PROVIDED BY PATTERSON AND DEWAR ENGINEERS, INC. ALL AIRPORT
SURVEY CONTROL MONUMENTS SHALL BE PROTECTED DURING CONSTRUCTION.
2. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL VERIFY ALL CONTROL POINTS TO BE
USED FOR CONSTRUCTION. ANY DISCREPANCIES SHALL BE REPORTED TO ENGINEER
IMMEDIATELY.
BORING LOG
BORING NO. PAVEMENT TYPE
APPROX.
PAVEMENT
THICKNESS (IN)
APPROX. BASE
STONE
THICKNESS (IN)
BORING
TERMINATION
DEPTH (FT)
GENERAL & SELECTED COMMENTS
B1 ASPHALT 4.75 4.0 15
3.0' (CL) LEAN CLAY, STIFF, MOIST TO WET
4.6' (CL) LEAN CLAY, FIRM, MOIST TO WET
6.6' (CL) LEAN CLAY, SOFT TO FIRM, MOIST TO WET
GROUNDWATER @ 12' BELOW SURFACE
B2 ASPHALT 4.75 5.0 15
5.3' (CL) SANDY CLAY, STIFF, MOIST
8.8' (CL) SANDY CLAY, FIRM TO STIFF, MOIST
B3 ASPHALT 4.50 7.0 15 14.0' (CL) SANDY CLAY, FIRM, MOIST
B4 ASPHALT 4.00 7.0 15 14.1 (CL) LEAN CLAY W/SAND, FIRM, MOIST
B5 ASPHALT 4.50 6.0 15
4.5' (CL) LEAN CLAY W/SAND, STIFF, MOIST
9.3' (CL) LEAN CLAY W/SAND, FIRM, MOIST
0.3' (CL) LEAN CLAY W/SAND, SOFT, MOIST
B6 ASPHALT 4.75 6.0 15
5.4' (CL) LEAN CLAY W/SAND, STIFF, MOIST
7.3' (CL) LEAN CLAY W/SAND, FIRM, MOIST
1.4' (CL) LEAN CLAY W/SAND, SOFT, MOIST
NOTE: BORING LOG DATA ARE FROM A GEOTECHNICAL INVESTIGATION COMPLETED BY MATERIALS MANAGERS AND ENGINEERS, INC. ON MARCH 15, 2024.
SURVEY CONTROL POINTS
Point #
CP1
CP2
Elevation
946.00
942.83
Northing
1518254.55
1517636.31
Easting
2479773.70
2479535.08
Description
MAG NAIL
MAG NAIL
N O
R
TH
SURVEY CONTROL
AND BORING LOG
G-201 SHEET 05 of 14
U N
W
AY
7-
TA
XI
W
AY
A
15" R C
P
15" RCP 15" RCP
36" RCP
" R
C P
36" RCP D
D
DD
D.I. TOP = 942.67'
INV IN = 937.67'
INV OUT = 937.64'
D.I. TOP = 943.04'
INV IN = 938.90'
INV OUT = 938.77'
D.I. TOP = 943.19'
INV OUT = 939.97'
15" RCP INV. = 933.81'
RUNWAY 35 PAPI
WIND CONE AND
SEGMENTED CIRCLE
PEDESTAL TOP = 942.53'
GROUND ELEV = 941.19'
INV IN = 933.32'
INV OUT = 933.32'
GRAVEL DRIVE
D
D ra w in g na m e:
K :\A
TL
_A vi at io n\
_P ro du ct io n\
JC
A
- J ac ks on
C ou nt y
Ai rp or t\0
JC
A
- A pr on
P av em en t R eh ab ilit at io n\
C
AD
\P la nS he et s\ C
-1
EX
IS
TI
N G
C O
N D
IT
IO
N A
N D
D
EM
O
LI
TI
O
N P
LA
N
.d w g C
, 2
1:
am .M al te
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
PR
EP
AR
ED
F O
R
PR
O
JE
C T
DRAWING NUMBER
PROJECT NO.
DATE
017999000
N o.
IS
SU
AN
C
E
AN
D R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
S D
AT
E
BY
REVIEWED BY RMC
DESIGNED BY SAM
DRAWN BY TPS
GSWCC NO.
(LEVEL II) 0000058034
SHEET TITLE
AP
R
O N
P
AV
EM
EN
T R
EH
AB
IL
IT
AT
IO
N
PR
EP
AR
ED
B Y
01/28/2025
JA
C
KS
O
N C
O U
N
TY
AI
R
PO
R
T
SK
Y H
AR
BO
R W
AY
JE
FF
ER
SO
N
, G A
PH
O N
E:
(7
) 3
-1
K
IM
LE
Y- H
O R
N A
N D
A
SS
O C
IA
TE
S, IN
C
AM
BE
R
P
AR
K D
R
IV
E, S
U
IT
E
AL
PH
AR
ET
TA
, G
EO
R G
IA
PH
O
N E
(7
) 6
-4
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M
IS
SU
ED
F O
R B
ID
-0
1-
N O
R
TH
EXISTING
CONDITIONS PLAN
C-101 SHEET 06 of 14
PEDESTAL TOP = 941.26'
GROUND ELEV = 939.92'
INV IN (EX 24" RCP) = 934.70'
INV IN (36" RCP) = 934.50'
INV OUT = 934.00'
TO
R
U N
W
AY
7-
TA
XI
W
AY
A
15" R C
P
15" RCP 15" RCP
36" RCP
" R
C P
36" RCP DD
D
DD
D.I. TOP = 942.67'
INV IN = 937.67'
INV OUT = 937.64'
D.I. TOP = 943.04'
INV IN = 938.90'
INV OUT = 938.77'
D.I. TOP = 943.19'
INV OUT = 939.97'
15" RCP INV. = 933.81'
RUNWAY 35 PAPI
WIND CONE AND
SEGMENTED CIRCLE
D.I. TOP = 942.47'
INV IN = 933.50'
INV OUT = 933.50'
PEDESTAL TOP = 942.53'
GROUND ELEV = 941.19'
INV IN = 933.32'
INV OUT = 933.32'
" R
C P
36" RCP
GRAVEL DRIVE
TERMINAL BUILDING
(UNDER CONSTRUCTION BY OTHERS)
AS
PH
AL
T
D R
IV
E, B Y
O
TH
ER
S
AS
PH
AL
T
D R
IV
E, B Y
O
TH
ER
S
944944
943.80
943.60
944.20
944.40 944.20944
3.8
943.60
943.20
943.40
943.60
943.80
944.20
944.40
944.60
943.20
943.40
943.60
943.80
944.20
944.40
944.60
4 .
9 4 4.
944.40
944.6
4.
944.
4.
943.60
943.80
944.20
944.40
943.80
943.60
944.20
944.40
944.60
ADJUST DROP INLET
RIM TO 942.9'
EX. RIM ELEV: 942.67'
ADJUST DROP INLET
RIM TO 943.3'
EX. RIM ELEV: 943.04'
ADJUST DROP INLET
RIM TO 943.4'
EX. RIM ELEV: 943.19'
DRESS SHOULDERS TO HAVE 1.5" LIP OFF EDGE
OF PAVEMENT AND SLOPE AT 5% FOR 10' TO
ENCOURAGE POSITIVE DRAINAGE. SEE DETAIL
NO. 4 ON SHEET C-601. PERMANENT SEEDING
TO BE PLACED ALL DISTURBED AREAS (TYP.)
943.40
943.20
3.
3.
3.
4.2
943.80
943.60
944.40 944.20
944.40
944.20
4.
80 94 4.
4.
944.60
944.40
944.20
943.80
943.80
943.60
943.40
3.8
943.60
943.40
943.60
943.80
944.20
944.40
4.2 0 94
3.
3.
3.
3.
3.
3.
3.
3.6
943.80 944.20944.20
944.40
4.
20943.80 943.60
943.40
944943.80 943.20
Sd2-F Sd2-F
Sd2-F
Sd2-F
Sd2-F
SEE DETAIL NO. 6
ON SHEET C-601
Sd1-S
INSTALL SILT FENCE
AT TOP OF BANK TO
GRAVEL ROAD
Sd2-F
Ds2 Ds3
Ds2 Ds3
Ds2 Ds3
Ds2 Ds3
D ra w in g na m e:
K :\A
TL
_A vi at io n\
_P ro du ct io n\
JC
A
- J ac ks on
C ou nt y
Ai rp or t\0
JC
A
- A pr on
P av em en t R eh ab ilit at io n\
C
AD
\P la nS he et s\ C
-2
G
R
AD
IN
G
.d w g C
-2
, 2
1:
am .M al te
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
PR
EP
AR
ED
F O
R
PR
O
JE
C T
DRAWING NUMBER
PROJECT NO.
DATE
017999000
N o.
IS
SU
AN
C
E
AN
D R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
S D
AT
E
BY
REVIEWED BY RMC
DESIGNED BY SAM
DRAWN BY TPS
GSWCC NO.
(LEVEL II) 0000058034
SHEET TITLE
AP
R
O N
P
AV
EM
EN
T R
EH
AB
IL
IT
AT
IO
N
PR
EP
AR
ED
B Y
01/28/2025
JA
C
KS
O
N C
O U
N
TY
AI
R
PO
R
T
SK
Y H
AR
BO
R W
AY
JE
FF
ER
SO
N
, G A
PH
O N
E:
(7
) 3
-1
K
IM
LE
Y- H
O R
N A
N D
A
SS
O C
IA
TE
S, IN
C
AM
BE
R
P
AR
K D
R
IV
E, S
U
IT
E
AL
PH
AR
ET
TA
, G
EO
R G
IA
PH
O
N E
(7
) 6
-4
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M
IS
SU
ED
F O
R B
ID
-0
1-
N O
R
TH
GRADING,
DRAINAGE AND
EROSION
CONTROL PLAN
C-201 SHEET 07 of 14
EROSION CONTROL LEGEND:
Sd2-F INLET PROTECTION. INSTALL GRATE FILTER FABRIC
AND WATTLE PER DETAIL NO. 5 ON SHEET C-601.
1. ANY EXISTING UTILITIES DAMAGED BY THE CONTRACTOR SHALL BE
REPLACED OR REPAIRED TO ENGINEER'S SATISFACTION AT
CONTRACTOR'S EXPENSE.
2. CONTOURS SHOWN ARE DRAWN AT 0.2' - 1' INTERVALS.
3. ALL SOIL EROSION AND SEDIMENTATION CONTROL MEASURES
SHALL BE INITIATED PRIOR TO ANY LAND DISTURBANCE OR
DEMOLITION OF ANY KIND.
4. EROSION CONTROL PRACTICES MUST COMPLY WITH THE
STANDARDS AND SPECIFICATIONS IN THE "MANUAL FOR EROSION
AND SEDIMENT CONTROL IN GEORGIA" (GREEN BOOK), LATEST
VERSION.
5. CONTRACTOR IS RESPONSIBLE FOR CLEANING AND REMOVING
ANY MUD/DEBRIS TRACKING FROM JOBSITE.
6. SOIL EROSION AND SEDIMENTATION CONTROL MEASURES MAY
HAVE TO BE ALTERED AT VARIOUS STAGES DURING
CONSTRUCTION TO ACCOMMODATE ACTUAL SITE CONDITIONS.
SUCH MODIFICATIONS ARE INCIDENTAL TO THE CONTRACT.
7. DUST ON SITE SHALL BE CONTROLLED BY SPRAYING WATER ON
DRY AREAS OF THE SITE OR BY OTHER APPROVED MEANS
THROUGHOUT ALL CONSTRUCTION OPERATIONS.
8. CONTRACTOR SHALL FOLLOW ALL LOCAL AND STATE SOIL
EROSION ORDINANCES TO ENSURE THAT NO SEDIMENT OR
CONSTRUCTION DEBRIS LEAVES THE CONSTRUCTION SITE.
GRADING, DRAINAGE AND EROSION CONTROL NOTES
DUST CONTROL
Ds3 DISTURBED AREA STABILIZATION
(WITH PERMANENT SEEDING)
Ds2 DISTURBED AREA STABILIZATION
(WITH TEMPORARY SEEDING)
Du
Du
Du
Du
Sd1-S SINGLE ROW SILT FENCE
TERMINAL BUILDING
(UNDER CONSTRUCTION BY OTHERS)
AS
PH
AL
T
D R
IV
E, B Y
O
TH
ER
S
AS
PH
AL
T
D R
IV
E, B Y
O
TH
ER
S
1+
2+
NORTHING: 1518304.83
EASTING: 2479595.70
NORTHING: 1517587.42
EASTING: 2479814.39
NORTHING: 1518077.40
EASTING: 2479890.14
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 7+50
NORTHING: 1518048.25
EASTING: 2479794.48
OFF. 100' LT
OFF. 75' LT
OFF. 50' LT
OFF. 25' LT
OFF. 25' RT
OFF. 50' RT
OFF. 75' RT
OFF. 100' RT
OFF. 100' LT
OFF. 75' LT
OFF. 50' LT
OFF. 25' LT
OFF. 25' RT
OFF. 50' RT
OFF. 75' RT
OFF. 100' RT
LIMITS OF TRANSITIONAL MILLING,
SEE PROFILE ON SHEET C-302 AND
DETAIL NO. 3 ON SHEET C-601
D ra w in g na m e:
K :\A
TL
_A vi at io n\
_P ro du ct io n\
JC
A
- J ac ks on
C ou nt y
Ai rp or t\0
JC
A
- A pr on
P av em en t R eh ab ilit at io n\
C
AD
\P la nS he et s\ C
-3
PA
VI
N
G P
LA
N
D
ET
AI
LS
.d w g
C -3
, 2
1:
am
.M al te
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
PR
EP
AR
ED
F O
R
PR
O
JE
C T
DRAWING NUMBER
PROJECT NO.
DATE
017999000
N o.
IS
SU
AN
C
E
AN
D R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
S D
AT
E
BY
REVIEWED BY RMC
DESIGNED BY SAM
DRAWN BY TPS
GSWCC NO.
(LEVEL II) 0000058034
SHEET TITLE
AP
R
O N
P
AV
EM
EN
T R
EH
AB
IL
IT
AT
IO
N
PR
EP
AR
ED
B Y
01/28/2025
JA
C
KS
O
N C
O U
N
TY
AI
R
PO
R
T
SK
Y H
AR
BO
R W
AY
JE
FF
ER
SO
N
, G A
PH
O N
E:
(7
) 3
-1
K
IM
LE
Y- H
O R
N A
N D
A
SS
O C
IA
TE
S, IN
C
AM
BE
R
P
AR
K D
R
IV
E, S
U
IT
E
AL
PH
AR
ET
TA
, G
EO
R G
IA
PH
O
N E
(7
) 6
-4
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M
IS
SU
ED
F O
R B
ID
-0
1-
N O
R
TH
PAVING PLAN
C-301 SHEET 08 of 14
1. ELEVATIONS SHOWN ON THIS SHEET REPRESENT FINISHED
SURFACE GRADE.
2. SPOT ELEVATIONS FOR PAVING ARE SPACED AT A 25' x 25' GRID IN
REFERENCE TO THE APRON ALIGNMENT SHOWN.
3. CONTRACTOR SHALL PERFORM GRADE CHECKS AS REQUIRED IN
THE PROJECT SPECIFICATIONS.
4. SEE SHEET C-601 FOR TYPICAL SECTIONS.
5. CONTRACTOR SHALL REMOVE ALL EXISTING MARKINGS PRIOR TO
PAVING, CRACK SEAL OR SEAL COAT.
6. CONTRACTOR SHALL ROUTE AND SEAL EXISTING CRACK PRIOR TO
PAVING.
PAVING NOTES
APRON CENTERLINE
0+00 0+25
4.
4.
0+50
3.
4.
0+75
3.
3.
1+00
3.
3.
1+25
3.
3.
1+50
2.
3.
1+75
2.
2.
2+00
3.
3.
2+25
3.
3.
2+50
3.
3.
2+75
3.
4.
3+00
3.
4.
3+25
3.
4.
3+50
3.
3.
3+75
3.
3.
4+00
3.
3.
4+25
3.
3.
4+50
3.
3.
4+75
3.
3.
5+00
3.
4.
5+25
3.
4.
5+50
3.
3.
5+75
3.
3.
6+00
3.
3.
6+25
3.
3.
6+50
3.
3.
6+75
3.
3.
7+00
3.
4.
7+25
3.
7+50
1.2%-1.0% -1.1%
-1.0%1.0% -0.8% 1.0%
0.9% 0.8%
ST
A:
0+
.8
EL
EV
:9
.3
AD
JU
ST
IN
LE
T
TO
G
R
AD
E
ST
A:
1+
.7
EL
EV
:9
.9
ST
A:
2+
.9
EL
EV
:9
.9
ST
A:
3+
.1
EL
EV
:9
.4
ST
A:
3+
.4
EL
EV
:9
.7
AD
JU
ST
IN
LE
T
TO
G
R
AD
E
ST
A:
4+
.7
EL
EV
:9
.3
ST
A:
4+
.1
EL
EV
:9
.7
ST
A:
5+
.0
EL
EV
:9
.1
AD
JU
ST
IN
LE
T
TO
G
R
AD
E
ST
A:
6+
.0
EL
EV
:9
.4
ST
A:
7+
.1
EL
EV
:9
.3
TAXIWAY CENTERLINE
1+00
4.
5.
1+25
4.
5.
1+50
4.
5.
1+75
5.
2+00
5.
0.0%
EN
D
M
IL
LI
N
G
ST
A:
1+
.1
EL
EV
:9
.0
BE
G
IN
M
IL
LI
N G
ST
A:
1+
.1
EL
EV
:9
.0
D ra w in g na m e:
K :\A
TL
_A vi at io n\
_P ro du ct io n\
JC
A
- J ac ks on
C ou nt y
Ai rp or t\0
JC
A
- A pr on
P av em en t R eh ab ilit at io n\
C
AD
\R ef er en ce s\ xP
R O
FI
LE
S
- 0
.d w g C
-3
, 2
1:
am .M al te
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
PR
EP
AR
ED
F O
R
PR
O
JE
C T
DRAWING NUMBER
PROJECT NO.
DATE
017999000
N o.
IS
SU
AN
C
E
AN
D R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
S D
AT
E
BY
REVIEWED BY RMC
DESIGNED BY SAM
DRAWN BY TPS
GSWCC NO.
(LEVEL II) 0000058034
SHEET TITLE
AP
R
O N
P
AV
EM
EN
T R
EH
AB
IL
IT
AT
IO
N
PR
EP
AR
ED
B Y
01/28/2025
JA
C
KS
O
N C
O U
N
TY
AI
R
PO
R
T
SK
Y H
AR
BO
R W
AY
JE
FF
ER
SO
N
, G A
PH
O N
E:
(7
) 3
-1
K
IM
LE
Y- H
O R
N A
N D
A
SS
O C
IA
TE
S, IN
C
AM
BE
R
P
AR
K D
R
IV
E, S
U
IT
E
AL
PH
AR
ET
TA
, G
EO
R G
IA
PH
O
N E
(7
) 6
-4
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M
IS
SU
ED
F O
R B
ID
-0
1-
PROFILES
C-302 SHEET 09 of 14
EXISTING GRADE
PROPOSED GRADE
EXISTING GRADE
PROPOSED GRADE
24" RCP
36" RCP
24" RCP
24" RCP 24" RCP
36" RCP
" R
C P
D D D
D
DD
D D
GRAVEL DRIVE
ASPHALT PARKING
LOT
TERMINAL BUILDING
LY
LE
F
IE
LD
R
O
AD
GRAVEL DRIVE
FUEL FARM
C-401 SHEET 10 of 14 D ra w in g na m e:
K
:\A
TL
_A vi at io n\ _P ro du ct io n\
JC
A
- J ac ks on C ou nt y Ai rp or t\0
JC
A
- A pr on P av em en t R eh ab ilit at io n\
C
AD
\P la nS he et s\
C -4
C R
AC
K
SE
AL
.d w g C
-4
, 2
1:
am .M al te
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
PR
EP
AR
ED
F O
R
PR
O
JE
C T
DRAWING NUMBER
PROJECT NO.
DATE
017999000
N o.
IS
SU
AN
C
E
AN
D R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
S D
AT
E
BY
REVIEWED BY RMC
DESIGNED BY SAM
DRAWN BY TPS
GSWCC NO.
(LEVEL II) 0000058034
SHEET TITLE
AP
R
O N
P
AV
EM
EN
T R
EH
AB
IL
IT
AT
IO
N
PR
EP
AR
ED
B Y
01/28/2025
JA
C
KS
O
N C
O U
N
TY
AI
R
PO
R
T
SK
Y H
AR
BO
R W
AY
JE
FF
ER
SO
N
, G A
PH
O N
E:
(7
) 3
-1
K
IM
LE
Y- H
O R
N A
N D
A
SS
O C
IA
TE
S, IN
C
AM
BE
R
P
AR
K D
R
IV
E, S
U
IT
E
AL
PH
AR
ET
TA
, G
EO
R G
IA
PH
O
N E
(7
) 6
-4
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M
IS
SU
ED
F O
R B
ID
-0
1-
LEGEND
LIMITS OF P-608 EMULSIFIED
ASPHALT SEAL COAT APPLICATION
SEAL COAT
PLAN
N O
R
TH
1. THE ASPHALT EMULSION SHALL BE DILUTED IN THE VOLUMETRIC
PROPORTION OF TWO PARTS CONCENTRATED ASPHALT MATERIAL
TO ONE PART HOT WATER PER FAA SPEC P-608.
SEAL COAT NOTES
U N
W
AY
7-
TA
XI
W
AY
A
RUNWAY 35 PAPI
WIND CONE AND
SEGMENTED CIRCLE
GRAVEL DRIVE
TERMINAL BUILDING
(UNDER CONSTRUCTION BY OTHERS)
AS
PH
AL
T
D R
IV
E, B Y
O
TH
ER
S
AS
PH
AL
T
D R
IV
E, B Y
O
TH
ER
S
King Air 350King Air 350
PA 28-181PA 28-181
DA 42 DA 42
DA 42 DA 42
PA 28-181PA 28-181
Citation 560Citation 560
PA 28-181 PA 28-181
PA 28-181PA 28-181
45.4'
31.2'
39.5'
55.0'
55.0'
67.9'
54.5'
R50'
R50'
R50'
R50'R75'
NORTHING: 1517981.11
EASTING: 2479745.74
NORTHING: 1518043.52
EASTING: 2479778.99
NORTHING: 1518032.43
EASTING: 2479742.61
NORTHING: 1518082.31
EASTING: 2479649.00
NORTHING: 1517943.68
EASTING: 2479622.92
NORTHING: 1518006.08
EASTING: 2479656.17
NORTHING: 1517658.78
EASTING: 2479709.76
NORTHING: 1517625.53
EASTING: 2479772.17
NORTHING: 1517633.82
EASTING: 2479799.34
NORTHING: 1517696.22
EASTING: 2479832.58
39.5'
39.5'
200' TO
RW CL
19.91'
15.94'
NORTHING: 1518018.35
EASTING: 2479565.60
NORTHING: 1518226.88
EASTING: 2479502.04
NORTHING: 1518284.54
EASTING: 2479714.18
NORTHING: 1518154.65
EASTING: 2479753.78
4' MIN
8' MIN 3' MIN
TIE-DOWN CONFIGURATION 1,
SEE DETAIL NO. 1 ON SHEET C-602
TIE-DOWN CONFIGURATION 1,
SEE DETAIL NO. 1 ON SHEET C-602
TIE-DOWN CONFIGURATION 3,
SEE DETAIL NO. 1 ON SHEET C-602
TIE-DOWN CONFIGURATION 2,
SEE DETAIL NO. 1 ON SHEET C-602
SEE RUNWAY HOLD POSITION MARKING
DETAIL NO. 3 ON SHEET C-602
TIE-DOWN ANCHOR, TYP.
SEE DETAIL NO. 2 ON SHEET C-602
6" TAXILANE CENTERLINE,
AVIATION YELLOW (TYP.)
NORTHING: 1517976.08
EASTING: 2479814.39
NORTHING: 1517672.09
EASTING: 2479907.06
NORTHING: 1517700.52
EASTING: 2479764.16
NORTHING: 1517939.37
EASTING: 2479691.35
65.2' 17.6'
D ra w in g na m e:
K :\A
TL
_A vi at io n\
_P ro du ct io n\
JC
A
- J ac ks on
C ou nt y
Ai rp or t\0
JC
A
- A pr on
P av em en t R eh ab ilit at io n\
C
AD
\P la nS he et s\ C
-5
M
AR
KI
N G
S
TR
IP
IN
G
P
LA
N .d w g
C -5
, 2
1:
am
.M al te
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
PR
EP
AR
ED
F O
R
PR
O
JE
C T
DRAWING NUMBER
PROJECT NO.
DATE
017999000
N o.
IS
SU
AN
C
E
AN
D R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
S D
AT
E
BY
REVIEWED BY RMC
DESIGNED BY SAM
DRAWN BY TPS
GSWCC NO.
(LEVEL II) 0000058034
SHEET TITLE
AP
R
O N
P
AV
EM
EN
T R
EH
AB
IL
IT
AT
IO
N
PR
EP
AR
ED
B Y
01/28/2025
JA
C
KS
O
N C
O U
N
TY
AI
R
PO
R
T
SK
Y H
AR
BO
R W
AY
JE
FF
ER
SO
N
, G A
PH
O N
E:
(7
) 3
-1
K
IM
LE
Y- H
O R
N A
N D
A
SS
O C
IA
TE
S, IN
C
AM
BE
R
P
AR
K D
R
IV
E, S
U
IT
E
AL
PH
AR
ET
TA
, G
EO
R G
IA
PH
O
N E
(7
) 6
-4
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M
IS
SU
ED
F O
R B
ID
-0
1-
N O
R
TH
MARKING AND
STRIPING PLAN
(SHEET 1 OF 2)
C-501 SHEET 11 of 14
1. ALL TAXIWAY HOLD LINES SHALL BE REFLECTIVE AVIATION
YELLOW.
2. ALL TAXIWAY CENTERLINE MARKING SHALL BE 6" CONTINUOUS
REFLECTIVE AVIATION YELLOW.
3. THE PAINT FOR PERMANENT MARKINGS SHALL BE MIXED AND
APPLIED TO PAVEMENT IN ACCORDANCE WITH MANUFACTURER'S
INSTRUCTIONS.
4. PAVEMENT SHALL BE CLEANED PRIOR TO PAVEMENT MARKING.
5. MARKING LINES MUST BE WELL-DEFINED WITH CRISP EDGES.
OVERSPRAY WILL NOT BE ACCEPTED.
6. SEE SHEET C-602 FOR MARKING DETAILS.
7. TIE-DOWN REFERENCE POINTS ARE CENTER OF BACK ANCHOR
UNLESS OTHERWISE NOTED.
8. CENTERLINE REFERENCE POINTS ARE CENTER OF 6" STRIPE
UNLESS OTHERWISE NOTED.
MARKING NOTES
GRAVEL DRIVE
ASPHALT PARKING
LOT
TERMINAL BUILDING
LY
LE
F
IE
LD
R
O
AD
GRAVEL DRIVE
FUEL FARM
INSTALL AS EXISTING AND AS PER
DETAIL NO. 3 ON SHEET C-602
RE-STRIPE EXISTING TAXIWAY
CENTERLINE, 6" AVIATION YELLOW
NORTHING: 1516987.52
EASTING: 2479876.69
D ra w in g na m e:
K :\A
TL
_A vi at io n\
_P ro du ct io n\
JC
A
- J ac ks on
C ou nt y
Ai rp or t\0
JC
A
- A pr on
P av em en t R eh ab ilit at io n\
C
AD
\P la nS he et s\ C
-5
M
AR
KI
N G
S
TR
IP
IN
G
P
LA
N .d w g
C -5
, 2
1:
am
.M al te
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
PR
EP
AR
ED
F O
R
PR
O
JE
C T
DRAWING NUMBER
PROJECT NO.
DATE
017999000
N o.
IS
SU
AN
C
E
AN
D R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
S D
AT
E
BY
REVIEWED BY RMC
DESIGNED BY SAM
DRAWN BY TPS
GSWCC NO.
(LEVEL II) 0000058034
SHEET TITLE
AP
R
O N
P
AV
EM
EN
T R
EH
AB
IL
IT
AT
IO
N
PR
EP
AR
ED
B Y
01/28/2025
JA
C
KS
O
N C
O U
N
TY
AI
R
PO
R
T
SK
Y H
AR
BO
R W
AY
JE
FF
ER
SO
N
, G A
PH
O N
E:
(7
) 3
-1
K
IM
LE
Y- H
O R
N A
N D
A
SS
O C
IA
TE
S, IN
C
AM
BE
R
P
AR
K D
R
IV
E, S
U
IT
E
AL
PH
AR
ET
TA
, G
EO
R G
IA
PH
O
N E
(7
) 6
-4
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M
IS
SU
ED
F O
R B
ID
-0
1-
N O
R
TH
MARKING AND STRIPING
PLAN (SHEET 1 OF 2)
C-502 SHEET 12 of 09 w in g na m e:
K :\A
TL
_A vi at io n\
_P ro du ct io n\
JC
A
- J ac ks on
C ou nt y
Ai rp or t\0
JC
A
- A pr on
P av em en t R eh ab ilit at io n\
C
AD
\P la nS he et s\ C
-6
C
O N
ST
R
U C
TI
O
N D
ET
AI
LS
.d w g
C -6
, 2
1:
am
.M al te
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
PR
EP
AR
ED
F O
R
PR
O
JE
C T
DRAWING NUMBER
PROJECT NO.
DATE
017999000
N o.
IS
SU
AN
C
E
AN
D R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
S D
AT
E
BY
REVIEWED BY RMC
DESIGNED BY SAM
DRAWN BY TPS
GSWCC NO.
(LEVEL II) 0000058034
SHEET TITLE
AP
R
O N
P
AV
EM
EN
T R
EH
AB
IL
IT
AT
IO
N
PR
EP
AR
ED
B Y
01/28/2025
JA
C
KS
O
N C
O U
N
TY
AI
R
PO
R
T
SK
Y H
AR
BO
R W
AY
JE
FF
ER
SO
N
, G A
PH
O N
E:
(7
) 3
-1
K
IM
LE
Y- H
O R
N A
N D
A
SS
O C
IA
TE
S, IN
C
AM
BE
R
P
AR
K D
R
IV
E, S
U
IT
E
AL
PH
AR
ET
TA
, G
EO
R G
IA
PH
O
N E
(7
) 6
-4
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M
IS
SU
ED
F O
R B
ID
-0
1-
CONSTRUCTION
DETAILS (SHEET 1 OF 2)
C-601 SHEET 13 of 14
EXISTING BASE
EXISTING HMA
PAVEMENT
1/8" UNDERFILL TYP.
USING SPECIFIED SEALANT, FILL
PREPARED CRACKS, LEAVING AN
RECESS OF APPROXIMATELY 1/8" FROM
TOP OF CRACK, EXCESS SEALANT
SHALL BE REMOVED FROM PAVEMENT.
COMPRESSIBLE BACKER
MATERIAL AS REQUIRED
EXISTING BASE
EXISTING HMA
PAVEMENT
ROUTE CRACK 1/4" BOTH SIDES (1/2" MINIMUM,
1-1/2" MAXIMUM) AND REMOVE TREATED
VEGETATION, DIRT, DUST, MOISTURE, AND OTHER
FOREIGN MATERIAL TO DEPTH OF ROUTED AREA.
EXISTING BASE
EXISTING HMA
PAVEMENT
APPLY HERBICIDE AND SOIL
STERILANT CHEMICALS TO
VEGETATED AREAS.
NOTE:
CRACKS WIDER THAN 1-1/2" INDICATE THAT THE PAVEMENT OR
PAVEMENT BASE SHALL BE REPAIRED OR REPLACED AS STATED IN
SPEC P-101-5.3
NOTES:
1. DEPENDENT ON SEALANT TYPE, USE MANUFACTURER'S RECOMMENDATIONS FOR BACKER MATERIAL TO FORM RESERVOIR FLOOR.
2. CONTRACTOR SHALL APPLY A HERBICIDE/STERILANT MIXTURE TO VEGETATED AREAS OF PAVEMENT 10 DAYS PRIOR TO SCHEDULING OF CLEANING OPERATION. IF AT TIME OF SCHEDULING CRACK CLEANING, VEGETATION HAS NOT DRIED, A SECOND ROUND OF HERBICIDE/STERILANT MIXTURE SHALL BE ADDED. COST OF FURNISHING AND APPLYING HERBICIDE/STERILANT MIXTURE SHALL BE INCLUDED IN
THE UNIT PRICE FOR JOINT SEALING FILLER.
3. OVERFILLING OF CRACK SEALANT SHALL NOT BE INCLUDED IN MEASUREMENT FOR PAYMENT.
CRACK REPAIR DETAIL1
C-601 CRACKS GREATER THAN 1/4" WIDE AND LESS THAN 1-1/2" WIDE USING ROUTER
1.5" 12.5 mm SUPERPAVE RECYLCED
ASPHALTIC CONCRETE OVERLAY (GDOT 402)
APPLY TACK COAT (GDOT 413) BETWEEN 3/4"
ASPHALTIC CONCRETE OPEN GRADED CRACK RELIEF
INTERLAYER (GDOT 415) AND 1.5" 12.5 mm SUPERPAVE
RECYCLED ASPHALTIC CONCRETE OVERLAY (GDOT 402)
APPLY TACK COAT (GDOT 413) BETWEEN EXISTING
ASPHALT CONCRETE AND 3/4" ASPHALTIC CONCRETE
OPEN GRADED CRACK RELIEF INTERLAYER (GDOT 415)
EXISTING AGGREGATE BASE COURSE
EXISTING SUBGRADE
VARIABLE (4 - 7")
VARIABLE (4 - 4.75")
3/4" ASPHALTIC CONCRETE OPEN GRADED
CRACK RELIEF INTERLAYER (GDOT 415)
1.5" LIP
10'
5%
NOTES:
1. MAINTAIN 1.5" LIP FROM TOP OF PAVEMENT SURFACE TO GROUND AND
DRESS SHOULDERS AT 5% FOR MINIMUM 10' TO PROMOTE POSITIVE
DRAINAGE AWAY FROM PAVEMENT.
2. PLACE TOPSOIL (FAA T-905) AND SEEDING (T-901) ON ALL DISTURBED AREAS.
SEE SHEET C-201 FOR LIMITS OF DISTURBANCE.
PLACED ADDITIONAL TOPSOIL AS
NEEDED TO DRESS APRON SHOULDERS
APRON OVERLAY TYPICAL SECTION2
C-601 N.T.S
ASPHALT TRANSITIONAL MILLING DETAIL3
C-601 N.T.S
APRON SHOULDER DRESSING DETAIL4
C-601 N.T.S
NOTE:
FILTER FABRIC 6" STRAW "SNAKE" WATTLE
FOR AREAS WHERE INLET IS IN PERVIOUS
AREAS LOCATED WITHIN THE RSA OR TOFA.
"DANDY" SACK FOR AREAS LOCATED IN
IMPERVIOUS PAVEMENT AREAS SUBJECT TO
AIRCRAFT OR VEHICULAR TRAFFIC.
INSTALL FILTER FABRIC WRAPPED AROUND,
FULLY ENVELOPING GRATE SET IN-POSITION
HOLDING FABRIC IN PLACE. SEE PROFILE DETAIL.
INLET GRATE
STRAW WATTLE TO SURROUND
ENTIRE INLET. STAKE IF NECESSARY
TO HOLD IN PLACE.
GRAVEL OR STRAW
FILLED WATTLE
FILTER FABRIC
INLET GRATE
INLET STRUCTURE
STRAW FILLED WATTLE
GRATE FILTER FABRIC AND WATTLE5
C-601 N.T.S.
INSTALL NEW FRAME
CONTRACTOR TO COORDINATE FINAL
CASTING ELEVATION WITH GRADING
PLANS OR PAVEMENT ELEVATION PLANS
INSTALL NEW FRAME 3-1/2"X3-1/2" L
FORM W/ STUDS @ 18" O.C. (TYP).
INSTALL NEW FRAME 3/8" X 5-1/2"
W/ STUDS @ 18" O.C.
CONTRACTOR TO REUSE EXISTING
INLET GRATE AS DIRECTED
SEE NOTES
SAWCUT AND REMOVE ±6" OF
EXISTING CONCRETE REBAR
AND ANGLE IRON FRAMEWORK
MATCH EXISTING MATCH
EXISTING
EXISTING PAVEMENT
MATCH NEW PAVEMENT
NOTES
1. CONCRETE SHALL CONFORM TO FAA STANDARD SPECIFICATIONS, SECTION P-610. STRUCTURAL PORTLAND CEMENT CONCRETE REQUIRED STRENGTH = 5,000 psi AT 28 DAYS.
2. REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60. STANDARD CRSI HOOK DETAILS APPLY UNLESS NOTED OTHERWISE.
3. HORIZONTAL STEEL BAR REINFORCEMENT IN JUNCTION BOX WALLS SHALL HAVE A STANDARD CRSI HOOK AT EACH END.
4. MAINTAIN 2" CLEARANCE TO ALL BARS AROUND PIPE OPENINGS. BARS SHALL BE CUT AS REQUIRED TO MAINTAIN 2" CLEARANCE.
5. REINFORCING FOR STRUCTURES: VERT. AND HORZ.: 2 MAT - #4 @ 12 INCHES EACH FACE (2" CLR.)
DRILL AND EPOXY #6
REBAR 6" INTO EXISTING
CONCRETE, 18" O.C.
3" MIN. CLEAR
DRAINAGE STRUCTURE ADJUSTMENT DETAIL6
C-601 N.T.S.
1.5"
EXISTING TAXIWAY
CENTERLINE GRADE
SAWCUT PRIOR TO MILLING
OPERATIONS TO CREATE
SMOOTH VERTICAL FACE
APPLY TACK COAT
PRIOR TO PAVING
PROPOSED 1.5" 12.5 mm SUPERPAVE
RECYCLED ASPHALTIC CONCRETE
OVERLAY (GDOT 402)
TRANSITIONAL MILLING
EXISTING ASPHALT PAVEMENT
w in g na m e:
K :\A
TL
_A vi at io n\
_P ro du ct io n\
JC
A
- J ac ks on
C ou nt y
Ai rp or t\0
JC
A
- A pr on
P av em en t R eh ab ilit at io n\
C
AD
\P la nS he et s\ C
-6
C
O N
ST
R
U C
TI
O
N D
ET
AI
LS
.d w g
C -6
, 2
1:
am
.M al te
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
PR
EP
AR
ED
F O
R
PR
O
JE
C T
DRAWING NUMBER
PROJECT NO.
DATE
017999000
N o.
IS
SU
AN
C
E
AN
D R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
S D
AT
E
BY
REVIEWED BY RMC
DESIGNED BY SAM
DRAWN BY TPS
GSWCC NO.
(LEVEL II) 0000058034
SHEET TITLE
AP
R
O N
P
AV
EM
EN
T R
EH
AB
IL
IT
AT
IO
N
PR
EP
AR
ED
B Y
01/28/2025
JA
C
KS
O
N C
O U
N
TY
AI
R
PO
R
T
SK
Y H
AR
BO
R W
AY
JE
FF
ER
SO
N
, G A
PH
O N
E:
(7
) 3
-1
K
IM
LE
Y- H
O R
N A
N D
A
SS
O C
IA
TE
S, IN
C
AM
BE
R
P
AR
K D
R
IV
E, S
U
IT
E
AL
PH
AR
ET
TA
, G
EO
R G
IA
PH
O
N E
(7
) 6
-4
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M
IS
SU
ED
F O
R B
ID
-0
1-
CONSTRUCTION
DETAILS (SHEET 2 OF 2)
C-602 SHEET 14 of 14
3'
TYP.
3'
TYP.
12" YELLOW STRIPE
12" YELLOW STRIPE
12" YELLOW STRIPE
12" YELLOW STRIPE 36
0'
C RUNWAY 17-35LC TAXIWAYL
APRON/AIRCRAFT
HOLDING SIDE
RUNWAY/AIRCRAFT
MOVEMENT SIDE
REFERENCE POINT
COORDINATES PER PLAN
PROFILE VIEW
ROD DETAIL
PLAN VIEW
12" DIA.
6"
4" 4"
24"
24" 30"
1-1/2"
1. CONCRETE STRENGTH SHALL BE 4000 PSI AT 28 DAYS (P-610).
NO SPECIAL INSPECTION REQUIRED.
2. ALL CUTS IN FINISHED PAVEMENT SHALL BE SAWED OR CORED.
3. CONCRETE SHALL BE FINISHED FLUSH WITH PAVEMENT.
4. TOP OF TIE DOWN ROD SHALL BE INSTALLED FLUSH WITH TOP
OF FINISHED PAVEMENT.
NOTES:
TIE DOWN ANCHOR, SEE DETAIL NO. 2,
THIS SHEET
AIRCRAFT TIE-DOWN MARKINGS1
C-602 N.T.S
CONFIGURATION 1
PIPER PA-28 CHEROKEE
CONFIGURATION 2
DIAMOND DA-42 TWIN STAR
CONFIGURATION 3
CESSNA C560 CITATION V
BEECHCRAFT B350 SUPER KING AIR
12.35'3.227'
17.7'
3.175' 14.05'
22.25'
24.45'
28.95'
6" WIDE SOLID YELLOW STRIPE
90°
SEE ROD DETAIL AT RIGHT
RUNWAY HOLDING POSITION MARKING3
C-602 N.T.S
AIRCRAFT TIE-DOWN ANCHORS2
C-602 N.T.S
IRON ROD
R3/4"
Ø5/8"
GALVANI…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .