JBH_NWR_Tenasillahe_Island_Rip_RapR1_1.pdf

PDF 2 MB Posted

Attached to
Sources Sought - RipRap / Rock for Cathlamet WA Federal contract opportunity
Solicitation number
140F0422Q0025
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This document includes a quote schedule and site map outlining material requirements for a sources sought notice from the Department of the Interior Fish and Wildlife Service. The agency requires class 700 rip rap, rip rap backing material, and 3-inch minus aggregate base course material to be delivered between June 1st, 2022 and August 30th, 2022 to the Julia Butler Hanson National Wildlife Refuge in Cathlamet, Washington. Interested parties should provide their DUNS number, CAGE code, confirmation of full delivery within the period of performance, and quarry source location by April 5th, 2022. Businesses of all sizes are encouraged to respond to further the agency's need for erosion control and scour protection materials at the refuge site.

View the file

Other files for this federal contract opportunity

Other files attached to Sources Sought - RipRap / Rock for Cathlamet WA, newest first.
File Type Posted
JBH_NWR_Tenasillahe_Island_Rip_Rap_Delivery_Quote_Schedule_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

mbehrens Text Box Location A #700 Rip Rap - 748 tons Backing - 359 tons 3" minus Road Base - 1,200 tons

Location B #700 Rip Rap 4,348 tons Backing - 506 tons (may be placed on levee) 3" minus Road Base - 1,300 tons

Rock for Erosion and Scour Protection shall be hard, sound, and durable material, free from seams, cracks, and other defects that tend to destroy its resistance to weather, and it shall consist of broken and/or processed rock. The use of recycled materials and concrete rubble is not permitted for this application.

The Suitable Shape of these rocks shall be “Angular” (having sharply defined edges) to “Subangular” (having a shape in between Rounded and Angular) for a higher degree of interlocking to provide stability to the protected area. The use of round, thin, flat, or long and needle-like shapes is not allowed mbehrens Callout Optional storage site for location B. Contractor to verify access.

mbehrens

Material delivery period of performance: 6/01/22 - 8/30/22.

File details come from the government source that posted it. Updated .