JB2701 Project List cao20261105.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- JB2701
About this file
This file is a FY27 construction forecast project list for Jefferson Barracks Air National Guard Station (ANGS) in St. Louis, Missouri, issued by the 131st Mission Support Group Contracting Office. The forecast identifies nine distinct construction and repair projects ranging in estimated value from less than $25,000 to between $4 million and $5 million, with anticipated solicitation releases between Q2 and Q3 of FY27. Projects include the ADAL Security Forces Operations Facility (renovation and addition to Building 64 with seismic retrofit, approximately 5,500 GSF, design completion by March 2027); floor and roof repairs at multiple buildings; chiller replacement for Building 1; flooring replacement in Buildings 28, 37, and 65; masonry re-pointing at historic facilities per National Park Service standards; water service line upgrades (design-build); fire alarm system repairs; and HVAC repair at Building 37. All projects are set aside for small business competition and will utilize Commercial Simplified Procedures with RFQ solicitation methods.
The Government is seeking responses from interested small business contractors and has specifically requested that interested firms provide their SAM UEI Number, single project and aggregate bonding capacity, and in-house capabilities summaries. The special notice indicates the Government is particularly interested in establishing long-term indefinite-delivery/indefinite-quantity (IDIQ) contracts and blanket purchase agreements (BPAs) with specialty trade contractors in HVAC, electrical, and historic masonry disciplines for recurring requirements. All projected procurements are subject to revision or cancellation, and this notice is informational only and does not commit the Government to purchase. Performance periods for individual projects range from 60 to 180 days after Notice to Proceed.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| FY27 Construction Forecast: Jefferson Barracks ANGS, St. Louis MO | |||||||
| Project Number | Project Title | Description | Disclosure of Magnitude | Solicitation No. | Solicitation Method | Set-Aside | Status/Anticipated Solicitation Release |
| LTUY199004 | ADAL Security Forces Operations Facility | UMMC (MILCON) project. Renovate and construct addition to Building 64 to convert facility into a Security Forces facility at Jefferson Barracks ANGS. Project includes seismic retrofit of facility. New overall building footprint will be approx. 5,500 GSF. Design completion anticipated by March 2027. | Between $4M and $5M | TBD | Commercial Simplified Procedures RFQ | Small Business | FY27 Q3 |
| LTUY202021 | Repair Floor BCE Admin Building 78 | Repair concrete floor of Building 78 to prepare for future separate project to renovate facility for use as a joint fitness center at Jefferson Barracks ANGS. The performance period for completion will be 120 days after issue of NTP. | Between $100K and $200K | TBD | Commercial Simplified Procedures RFQ | Small Business | FY27 Q3 |
| Multiple | LTUY252103 Repair Roof Warehouse, Historic B26 & LTUY202119 Repair Roof, BW HQ B1 | Replace roofing system and make structural repairs to roof framing of Building 26 and replace roofing system of Building 1 at Jefferson Barracks ANGS. The performance period for completion will be 120 days after issue of NTP. | Between $750K and $1.5M | TBD | Commercial Simplified Procedures RFQ | Small Business | FY27 Q3 |
| LTUY202132 | Repair Chiller B1 | Repair by replacement chiller for Building 1. The performance period for completion will be 180 days after issue of NTP. | Between $200K and $400K | TBD | Commercial Simplified Procedures RFQ | Small Business | FY27 Q2 |
| LTUY222012 | Repair Floors B28/37/65 | Replace damaged/end of life flooring in multiple facilities at Jefferson Barracks ANGS. The performance period for completion will be 120 days after issue of NTP. | Between $100K and $200K | TBD | Commercial Simplified Procedures RFQ | Small Business | FY27 Q3 |
| LTUY232032 | Repair Masonry, B28/39/53 | Re-point masory of multiple historic facilities per National Park Service preservation brief standards at Jefferson Barracks ANGS. The perfomance period for completion will be 90 days after issue of NTP. | Between $100K and $200K | TBD | Commercial Simplified Procedures RFQ | Small Business | FY27 Q2 |
| LTUY252024 | ADAL Water Service Lines with Cross Connection | Design-build project to connect two main domestic water service lines creating a loop improving utility resilience at Jefferson Barracks ANGS. The performance period will be 180 days after issue of NTP. | Between $200K and $400K | TBD | Commercial Simplified Procedures RFQ | Small Business | FY27 Q3 |
| LTUY262012 | Repair Fire Alarms, Multiple Facilities | Miscellaneous repairs to fire alarm systems in multiple facilities at Jefferson Barracks ANGS. The performance period will be 120 days after issue of NTP. | Between $50K and $100K | TBD | Commercial Simplified Procedures RFQ | Small Business | FY27 Q3 |
| LTUY262015 | Repair B37 DFAC A/C | Repair system components of air conditioning system at Building 37 Jefferson Barracks ANGS. The performance period for completion will be 60 days after issue of NTP. | Less than $25K | TBD | Commercial Simplified Procedures RFQ | Small Business | FY27 Q2 |
File details come from the government source that posted it. Updated .