JB2701 Project List cao20261105.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
FY27 Construction Forecast: Jefferson Barracks ANGS, St. Louis MO
Solicitation number
JB2701
Issued by

About this file

This file is a FY27 construction forecast project list for Jefferson Barracks Air National Guard Station (ANGS) in St. Louis, Missouri, issued by the 131st Mission Support Group Contracting Office. The forecast identifies nine distinct construction and repair projects ranging in estimated value from less than $25,000 to between $4 million and $5 million, with anticipated solicitation releases between Q2 and Q3 of FY27. Projects include the ADAL Security Forces Operations Facility (renovation and addition to Building 64 with seismic retrofit, approximately 5,500 GSF, design completion by March 2027); floor and roof repairs at multiple buildings; chiller replacement for Building 1; flooring replacement in Buildings 28, 37, and 65; masonry re-pointing at historic facilities per National Park Service standards; water service line upgrades (design-build); fire alarm system repairs; and HVAC repair at Building 37. All projects are set aside for small business competition and will utilize Commercial Simplified Procedures with RFQ solicitation methods.

The Government is seeking responses from interested small business contractors and has specifically requested that interested firms provide their SAM UEI Number, single project and aggregate bonding capacity, and in-house capabilities summaries. The special notice indicates the Government is particularly interested in establishing long-term indefinite-delivery/indefinite-quantity (IDIQ) contracts and blanket purchase agreements (BPAs) with specialty trade contractors in HVAC, electrical, and historic masonry disciplines for recurring requirements. All projected procurements are subject to revision or cancellation, and this notice is informational only and does not commit the Government to purchase. Performance periods for individual projects range from 60 to 180 days after Notice to Proceed.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

FY27 Construction Forecast: Jefferson Barracks ANGS, St. Louis MO
Project NumberProject TitleDescriptionDisclosure of MagnitudeSolicitation No.Solicitation MethodSet-AsideStatus/Anticipated Solicitation Release
LTUY199004ADAL Security Forces Operations FacilityUMMC (MILCON) project. Renovate and construct addition to Building 64 to convert facility into a Security Forces facility at Jefferson Barracks ANGS. Project includes seismic retrofit of facility. New overall building footprint will be approx. 5,500 GSF. Design completion anticipated by March 2027.Between $4M and $5MTBDCommercial Simplified Procedures RFQSmall BusinessFY27 Q3
LTUY202021Repair Floor BCE Admin Building 78Repair concrete floor of Building 78 to prepare for future separate project to renovate facility for use as a joint fitness center at Jefferson Barracks ANGS. The performance period for completion will be 120 days after issue of NTP.Between $100K and $200KTBDCommercial Simplified Procedures RFQSmall BusinessFY27 Q3
MultipleLTUY252103 Repair Roof Warehouse, Historic B26 & LTUY202119 Repair Roof, BW HQ B1Replace roofing system and make structural repairs to roof framing of Building 26 and replace roofing system of Building 1 at Jefferson Barracks ANGS. The performance period for completion will be 120 days after issue of NTP.Between $750K and $1.5MTBDCommercial Simplified Procedures RFQSmall BusinessFY27 Q3
LTUY202132Repair Chiller B1Repair by replacement chiller for Building 1. The performance period for completion will be 180 days after issue of NTP.Between $200K and $400KTBDCommercial Simplified Procedures RFQSmall BusinessFY27 Q2
LTUY222012Repair Floors B28/37/65Replace damaged/end of life flooring in multiple facilities at Jefferson Barracks ANGS. The performance period for completion will be 120 days after issue of NTP.Between $100K and $200KTBDCommercial Simplified Procedures RFQSmall BusinessFY27 Q3
LTUY232032Repair Masonry, B28/39/53Re-point masory of multiple historic facilities per National Park Service preservation brief standards at Jefferson Barracks ANGS. The perfomance period for completion will be 90 days after issue of NTP.Between $100K and $200KTBDCommercial Simplified Procedures RFQSmall BusinessFY27 Q2
LTUY252024ADAL Water Service Lines with Cross ConnectionDesign-build project to connect two main domestic water service lines creating a loop improving utility resilience at Jefferson Barracks ANGS. The performance period will be 180 days after issue of NTP.Between $200K and $400KTBDCommercial Simplified Procedures RFQSmall BusinessFY27 Q3
LTUY262012Repair Fire Alarms, Multiple FacilitiesMiscellaneous repairs to fire alarm systems in multiple facilities at Jefferson Barracks ANGS. The performance period will be 120 days after issue of NTP.Between $50K and $100KTBDCommercial Simplified Procedures RFQSmall BusinessFY27 Q3
LTUY262015Repair B37 DFAC A/CRepair system components of air conditioning system at Building 37 Jefferson Barracks ANGS. The performance period for completion will be 60 days after issue of NTP.Less than $25KTBDCommercial Simplified Procedures RFQSmall BusinessFY27 Q2