JA W56HZV-19-R-0127 AMD 01_Redacted.pdf
PDF 1 MB Posted
- Solicitation number
- W56HZV21D0034
About this file
This justification and approval document concerns a sole source contract award for electric over hydraulic (EH) T-9 medium dozers. The Army Materiel Command TACOM Life Cycle Management Command awarded contract W56HZV21D0034 to an unknown vendor for an unknown amount on March 29, 2021. The justification cites the need to avoid substantial duplication of costs that would result from competitive bidding due to prior investments in training personnel and developing logistical products specific to the current T-9 dozer configuration from the incumbent vendor. The amendment increases the total value to incorporate additional service requirements including integrated logistics support, storage, and instruction and knowledge products transfer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA W56HZV-19-R-0127_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OPSEC
budget
OPSEC
Equipment Capabilities, Limitations and Vulnerabilities
OPSEC: Equipment capabilities
OPSEC: Equipment Capabilities, Limitations, and Vulnerabilities
OPSEC budget data OPSEC budget data
OPSEC budget data OPSEC budget data
OPSEC
budget data OPSEC budget data
OPSEC:
Mission Readiness
OPSEC: Mission Readiness
OPSEC: Mission Readiness
OPSEC
OPSEC
budget data data
OPSEC: budget data
OPSEC: budget data
OPSEC:
budget data data
OPSEC
budget data OPSEC: budget data effort and cost to the Government. This is because John Deere would need to provide hardware (FAT vehicles) for testing and develop logistics products to meet the T-9 Medium Dozer requirements. In addition, the Government would have to conduct additional training to ensure the Army personnel could properly use and operate the new configuration of the T-9 Dozer. Maintaining the current T-9 Medium Dozer configuration is essential in avoiding substantial duplication of cost cited in paragraph 5 above.
Based on the market research, the previous procurement and program knowledge, the Government is aware there are other vendors capable of manufacturing medium size Dozers with the potential of meeting the requirement. However, based on the circumstances described in section five, a competitive effort would result in substantial duplication of cost.
9. Interested Sources: No Change
10. Other Facts:
i. Procurement History: No Change
ii. Other Facts: Reason for Amendment 01: Amendment 01 increases the total J&A value by from and also incorporates an update to the market research. The estimated value is increased based on additional service requirements to include ICLS, Storage and I&KPT. T-9 Medium Dozers procured via this contract must obtain Full Material Release (FMR) or Conditional Material Release (CMR) prior to fielding. ICLS will be used to provide scheduled and unscheduled maintenance of the EOH insert and allow for fielding of Dozers until FMR requirements are achieved. Storage is added to protect the Government in the event delays occur while achieving FMR or CMR approval. The I&KPT is added as it is necessary for the new EOH insert to ensure Army trainers and key personnel can adequately provide NET of the EOH Dozer operation and maintenance functions to gaining units. The estimated dollar amount for Logistical Data Product updates for the EoH Technical insert decreased by from to to correct an error in the original estimate for this service. Lastly, the market research section is updated to include new information pertaining to a capability statement submitted by John Deere, Inc.
11/12. Technical Certification/Requirements Certification: I certify that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and belief.
Signature: //~signed~// DATE: 20NOV2019
SHANE M. SULLIVAN
Project Manager, Force Projection
OPSEC budget data
OPSEC budget data
13. Fair and Reasonable Cost/Price Determination: The negotiated price will be determined fair and reasonable through a price analysis to ensure that the price agreement is consistent with the IGE. ACC-WRN has a dedicated Pricing Division with trained Price Analysts who will assist the Contracting Officer by performing the Price analysis. PdM CE/MHE will also support this analysis with a technical review. The Contracting Officer will request that engineers or similar personnel familiar with the hardware and services ensure that what is proposed is fair and reasonable. The ACC- WRN Price Analyst will use the recommendations contained in the PdM CE/MHE engineering technical report to develop a recommended negotiating position. Certified Cost or Pricing Data will not be required however, data other than Certified Cost or Pricing Data will be requested from the contractor to the extent necessary to determine a fair and reasonable price. ACC-WRN will document the results of negotiations, and the detailed Price Fair and Reasonable determination from the Contracting Officer, in a Price Negotiation Memorandum (PNM) that ACC-WRN senior Contracting personnel within the Pricing Division will review and concur upon.
I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable based on cost analysis and negotiations.
Signature: //SCS// DATE: 21 NOV 19
SHANE C STREHLER
Contracting Officer, Army Contracting Command - Warren
14. Procuring Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.
Signature: //SCS// DATE: 21 NOV 19
SHANE C. STREHLER
Contracting Officer, Army Contracting Command - Warren
OPSEC : budget