JA W31P4Q20Q0023 Redacted.pdf

PDF 1 MB Posted

Attached to
Hose Assembly, Non-Metallic
Solicitation number
W31P4Q-20-Q-0023
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

Full screening has been completed which concluded that competition cannot be improved at this time because this part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing knowledge by the qualified source(s) require acquisition of the part in accordance with the design control activity’s procedures, as approved by the cognizant Government engineering activity. Required delivery with production lot testing is 360 days after contract award.

6. Efforts to Obtain Competition: A sources sought outlining this requirement was published in the BetaSams pursuant to FAR 5.201 on To date no responses have been received. Any sources identified through the BetaSams will receive due consideration as required by law. No effective competition is anticipated for this acquisition based on the reasons set forth in paragraphs 5, 7, and 8. Justification to waive the requirement to synopsize the proposed acquisition is based on the exception identified in FAR 5.202(a)(2).

7. Actions to Increase Competition: The plan for improving and enhancing the competitive status of these items includes publication in the Aviation and Missile Command (AMCOM) Competition Advocate’s Shopping List (CASL), in accordance with FAR 5.404 and publication in the BetaSams in accordance with FAR 5.201. Full screening under the procedures of the Department of Defense Spare Parts Breakout Program, Defense Federal Acquisition Regulation Supplement (DFARS) Procedures, Guidance and Information (PGI) 217.75 was conducted. The Acquisition Method Suffix Code (AMSC is coupled with Acquisition Method Code (AMC) to form the Acquisition Method Reason Code (AMRC). Breakout Engineering has assigned an AMRC of “1B” to this effort. AMC “1” states, “Suitable for competitive acquisition for the second or subsequent time.” AMSC “B” states, “This part must be acquired from a manufacturing source(s) specified on a source control or selected item drawing as defined by the current version of DoD-STD-100. Suitable technical data, Government data rights, or manufacturing knowledge are not available to permit acquisition from other sources, nor qualification testing or another part, nor use of a second source part in the intended application. Although, by DoD-STD-100 definition, altered and selected items shall have an adequate technical data package, data review discloses that required data or data rights are not in Government possession and cannot be economically obtained. If one source is available, AMCs 3, 4, or 5 are valid. If at least two sources exist, AMCs 1 or 2 are valid.” Re-screening will occur prior to the expiration of the AMC/AMRC on 05 Nov 2023. No orders will be issued unless AMC/AMRC is valid.

Version – September 2018 FOR OFFICIAL USE ONLY

11. Technical Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.

Name:

12. Requirements Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.

Name:

13. Fair and Reasonable Cost Determination: I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable based on use of techniques which will include price analysis, limited competition and negotiations. Certified cost and pricing data will not be required per FAR 15.403-5(a)(1).

This determination will be made using the following: ☐ cost analysis ☒ price analysis ☐ should cost ☐ IGCE ☐ audit: ☐ other:

As a part of this basis, certified cost or pricing data:

☐ will be required.

☒ will not be required and the following exception applies (FAR 15.403):

☐ Prices that will be agreed upon are based on adequate price competition.

☐ Prices that will be agreed upon are based on prices set by law or regulation.

☐ A commercial item is being acquired.

☐ A waiver has been granted by the head of the contracting activity (HCA) in accordance with DFARS PGI 215.403-1.

☐ The contract action is a modification to a contract or subcontract for commercial item(s).

File details come from the government source that posted it. Updated .