JA to add ICLS to JAB W56HZV-16-C-0028_3.10.20_Redacted.pdf

PDF 1 MB Posted

Attached to
Joint Assault Bridge - Interim Contractor Logistics Support
Solicitation number
W56HZV16C0028_P00083
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OPSEC: Detailed budget data

OPSEC: Readiness and vulnerabilities assessment

(2) Competitive Status: Full and Open Competition

(3) N/A

(4) N/A

(5) The previous contract was awarded on a full and open basis, but for this instant action, the source will be limited to DRS based on the justification detailed in Section 5 above.

(6) N/A

(7) N/A

b. Other Facts: N/A

11/12. Technical and Requirements Certification:

I certify that the supporting data under my cognizance, which are included in the justification are accurate and complete to the best of my knowledge and belief:

Name: Mr. Steven Rienstra Date: 26 Feb 20

Title: Product Manager, Bridging Signature: //s//

13. Fair and Reasonable Cost Determination: I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable.

The negotiated price will be determined fair and reasonable through a combination of Cost Analysis (to thoroughly analyze each of the proposed individual cost elements) and price analysis( to ensure that the price agreement is consistent with the IGE and/or historical pricing). ACC-DTA has a dedicated Cost and Pricing Division with trained Cost/Price Analysts and Industrial Specialists who will assist the PCO by performing the Cost and Price analysis.

The PCO will request that engineers or similar subject matter expert(s) familiar with the end item perform a technical evaluation to review labor types and quantities as well as material kinds and quantities to ensure that what is proposed is and reasonable. The Cost/Price Analyst will use the recommendations as contained in the various audits, technical reports, and historical data to develop a recommended negotiating position. The PCO will also review the detailed Government Position in a comprehensive Business Clearance Review. Certified Cost or Pricing Data will be required and will form the basis for this analysis. The Post Negotiation Memorandum (PNM) that will be reviewed and concurred upon by the Team Chief within the Pricing Division will document the results of negotiations, and the detailed Price Fair and Reasonable determination from the Contracting Officer.

Name: Mr. Charles Scott Date: __27 February 2020_________ Title: Contracting Officer Signature: //CS signed//

14. Procuring Contracting Officer’s Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief:

Name: Mr. Charles Scott Date: 27 February 2020 Title: Contracting Officer Signature: //CS signed//

File details come from the government source that posted it. Updated .