JA - Redacted.pdf

PDF 596 KB Posted

Attached to
Endoscopes Cabinets Federal contract opportunity
Solicitation number
36C25525Q0480
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

This document is a Sole Source Justification Template for the Department of Veterans Affairs, specifically for acquiring a Medivator EndoDry Drying and Storage System for the Kansas City VA Medical Center. The procurement involves purchasing one (1) pass-through endoscope drying cabinet and seven (7) storage cabinets, with a two-year Total Connect service care agreement, at a total cost under the Simplified Acquisition Threshold (SAT) of $7.5 million.

The justification emphasizes the unique capabilities of the Medivator system, which aligns with regulatory standards for sterilization and provides continuous endoscope drying while preventing cross-contamination. The equipment is critical for supporting medical procedures in operating rooms, interventional radiology, pulmonology, and gastrointestinal clinics. The sole source procurement is justified by the system's specialized design, integration capabilities with existing tracking systems, and the potential risks and delays associated with alternative equipment, including potential construction modifications and increased operational costs.

View the file

Other files for this federal contract opportunity

Other files attached to Endoscopes Cabinets, newest first.
File Type Posted
36C25525Q0480.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAPG Part 813.5 Simplified Acquisition Procedures for Certain Commercial Items Attachment 1: Request for Sole Source Justification Template >SAT-$7.5M under FAR13.5

Page 3 of 5 Effective Date: 11/15/24

REVISION: 01

Acquisition ID#:

the space it makes this a compelling urgency for procurement to prevent the delays in construction and subsequent costs associated with the delays.

6. Description of Efforts Made to ensure that offers are solicited from as many potential sources as deemed practicable:

7. Determination by the CO that the Anticipated Cost to the Government will be Fair and Reasonable:

A fair and reasonable price determination will be made by comparison to the Independent Government Cost Estimate (IGCE) that was formulated by using market research of historical pricing from same or similar scope contracts and market price lists.

File details come from the government source that posted it. Updated .