This is a Justification and Approval (J&A) document for use of an exception to fair opportunity in federal contracting.
The Mid-Atlantic Regional Maintenance Center (MARMC), a Navy field activity under Naval Sea System Command, seeks to add work to an existing firm fixed-price contract (N0002422D4407) and delivery order (N5005426FL022) awarded to Colonna's Shipyard on a non-competitive basis. The work involves industrial support for cooling coil replacement aboard USS CARTER HALL (LSD 50) in accordance with Specification Item 512-11-001, initiated through Request for Contract Change 4N. The statutory authority cited is FAR 16.505(b)(2)(i)(A), permitting non-competitive procurement when agency need is so urgent that fair opportunity would cause unacceptable delays. The work must commence immediately and be completed within the current fiscal year and delivery order period of performance, requiring integration with existing work packages. The Contracting Officer determined costs fair and reasonable based on historical data, Independent Government Estimate review, and the contractor's burdened ship repair labor and material burden rates established at time of original contract award. No market research was conducted due to the critical nature and immediacy of the requirement. The document includes technical certification by Project Manager William Bryan Garrett (Code 332) and requires legal sufficiency review and Contracting Officer approval signatures, with a note indicating digital signature by SYLEEST LYNEVE.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J&A Number: N50054-26-123
5. RATIONALE JUSTIFYING USE OF CITED STATUTORY AUTHORITY
IAW FAR 16.505(b)(2)(i)(A) this procurement must be issued on a non-competitive basis due to the urgency of the required support which is under the same availability currently in execution and includes the same period of performance as the awarded delivery order period of performance. This additional work must be issued under a non-competitive basis because if the Government were to provide for fair opportunity, the entire schedule would be mission of the USS CARTER HALL (LSD 50) is to
The LSD class of ship acts as an invaluable component to joint Navy-Marine expeditionary units (ARG/MEU). In one of four cooling coils . These cooling coils provide vital cooling air to the following systems
The inadequate amount of cooling will period with the ship not being able to .
Additionally, the crew living spaces are affected The crew members will not be able to get the
. The work identified in this RCC must be completed to unacceptable and costly delays to the USS CARTER HALL (LSD 50). The work must be integrated with the existing work package. Failure to accomplish this work would be
For the USS CARTER HALL (LSD 50) to meet its fleet mission commitments, Shipyard has the required equipment and is the only company able to meet the Government's immediate requirement to provide the replacement of the Cooling Coil.
Shipyard provides the Government with the appropriate avenue to accomplish this repair within the allotted Period of Performance. These repairs are essential f
6. DETERMINATION OF FAIR AND REASONABLE COSTS
The Contracting Officer has determined that the anticipated cost to the Government for the supplies/services covered by the J&A will be fair and reasonable. The estimated cost of this work item is based upon historical data as well as the Independent Government Estimate burdened ship repair labor rate and material burden rate were determined to be fair and reasonable at time of contract and delivery order award. The supported information provided should be sufficient to support the fair and reasonable cost determination of the procurement.
7. ACTIONS TO REMOVE BARRIERS TO COMPETITION
For reasons set forth in paragraphs 5 and 6, market research was not conducted. The critical nature of the work required that it be started immediately. Future acquisitions for similar work will be reviewed by the Contracting Officer on a case-by-case basis to promote the use of full and open competition in the acquisition process where possible under this multiple delivery order contract, where possible and practicable in accordance with FAR Subpart 16.5. In addition, a copy of the change(s) covered by this justification will be forwarded to MARMC Code 200, Planning and Engineering, and Code 300, Waterfront Operations, for consideration of similar work requirements in future solicitations.
CERTIFICATIONS AND APPROVAL
COMBINED TECHNICAL/REQUIREMENTS CERTIFICATION (FAR
16.505(b)(2)(ii)(B)(9):
I certify that the facts and representations under my cognizance, which are included in this justification, are complete and accurate to the best of my knowledge and belief.
Signature:
Print: (Name) William Bryan Garrett (Title) Project Manager (Code) 332 (Phone) 757- 837-9197
LEGAL SUFFICIENCY REVIEW (NMCARS 5206.303(90)):
I have determined this justification is legally sufficient.
Date: ______________
Print: (Name) (Title) (Code) (Phone)
COMBINED CONTRACTING OFFICER CERTIFICATION AND APPROVAL
(FAR 16.505(b)(2)(ii)(C)
I certify that this justification is accurate and complete to the best of my knowledge and belief. Upon the basis of the above justification, I hereby approve, as Contracting Officer, the award of the proposed procurement(s) described herein using other than full and open competition, pursuant to the authority of FAR 16.505(b)(2)(i)(A), the agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays.
Date: ______________