JA pdf_Redacted.pdf
PDF 2 MB Posted
- Solicitation number
- W912HY26R1BHY
About this file
Justification & Approval to Limit Competition – Sole Source Contract
This document is a Justification & Approval to Limit Competition (J&A) for a sole source contract award to HDR MN Galveston JV (HDR) for Construction Phase Architect-Engineer (A-E) services on the Houston Ship Channel (HSC) Segment 3 at Spillman Island, Harris County, Texas. The contract value is $1,046,239.53, with authority under 10 U.S.C. 3204(a)(2) citing Unusual and Compelling Urgency. The contracting agency is the U.S. Army Corps of Engineers, Southwestern Division, Galveston District. The requirement involves conducting a comprehensive structural assessment of an existing bulkhead wall system, developing engineering design plans, specifications, construction cost estimates, project schedules, and supporting documentation for repair or rehabilitation. Services include detailed design drawings, bidder inquiry responses, construction submittal reviews, Request for Information (RFI) responses, design change execution, and site visit attendance. The work is funded through Civil Works and will be solicited under a 270-calendar-day duration using the $900M Multiple Award Task Order Contract (MATOC) tool.
The J&A establishes that HDR is uniquely qualified as the Designer of Record (DOR) for the original bulkhead design and possesses irreplaceable knowledge critical to remediation efforts following two slope failures occurring in late 2025. The justification emphasizes unusual and compelling urgency based on schedule risk and financial impact: the construction contractor McCarthy will incur approximately $200,000 daily standby costs beyond mid-May if engineering services are delayed. Retaining HDR avoids substantial time and expense associated with a new designer conducting full re-analysis, independent site investigation, and complete redesign. Evaluated alternatives—including full and open competition, MATOC competition, and in-house government resources—were deemed unsuitable due to the 50+ workday delay that would result in estimated costs exceeding $24.2 million. The document includes technical certifications from the Geotechnical and Structural Lead Engineers and confirms price reasonableness based on comparison with the Independent Government Estimate and historical MATOC pricing data.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JUSTIFICATION & APPROVAL TO LIMIT COMPETITION UNDER
RFO FAR 6.103-2(b)
PROGRAM/EQUIPMENT: CONTROL NO: PANSWD-26-P-0000 028844
Sole Source Contract for Construction Phase Architect-Engineer (A-E) services, Houston Ship Channel (HSC) Segment 3 at Spillman Island, Harris County, TX
AUTHORITY: 10 United States Code 3204(a)(2) as implemented in RFO Federal Acquisition Regulation 6.103-2(b ), Unusual and Compelling Urgency.
AMOUNT: $1,046,239.53
Prepared by:
Name: Antoinette Fonseca, P.E.
Title: A-ENE Management Chief
Contracting Officer:
Name: Carol Hodges
Technical Representative for Geotechnical:
Name: James Meng, Ph.D., P.E.
Title: Geotechnical Lead Engineer
Technical Representative for Structural:
Name: Ignacio M. Toledo-Rodrfguez, P.E.
Title: Acting Chief, Structural Section
Date Reviewed: 24 April 2026
Date Reviewed:24 April 2026
Date Reviewed: 27 April 2026
Date Reviewed: 24 April 2026
SWG-26-03
File details come from the government source that posted it. Updated .