JA New Work Enclosure.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
USS EMORY S. LAND ROH/DD FY26 P00006
Solicitation number
N3220526C1223P00006
Issued by

About this file

This is a Justification and Approval (J&A) enclosure document that identifies the specific repair and maintenance work items required for the USS EMORY S. LAND during a Regularly Scheduled Overhaul and Modernization (ROH) in Fiscal Year 2026. The document lists 26 distinct work packages numbered from 006 through 088, encompassing comprehensive shipboard repairs across multiple systems and structural components. The work includes critical mechanical systems repairs such as circulation pump and motor repair, chill water pump motor crating, and boiler stack cleaning and inspection; piping system replacements including firemain valves, fuel piping risers, shore steam dick riser piping, and fuel oil pipes; structural steel repairs to ship components including deck repairs, stiffener repairs, laundry steel repair, and waterside sill and stiffeners; and various preservation and replacement work on ventilation systems, plumbing, fixed handrails, and echo sounder water heater equipment.

The associated federal contract opportunity is solicitation N3220526C1223P00006 issued by the Department of the Navy Military Sealift Command, which represents a limited or sole source justification procurement. The contract was awarded on February 13, 2026, to an unknown vendor for an undetermined amount. This J&A enclosure serves as the supporting documentation justifying the specific scope of work and requirements for this overhaul and modernization initiative for the USS EMORY S. LAND.

View the file

Other files

File Type Posted
N10426C1223P00006_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P00006

Enclosure to J&A No. N10426C1232P00002
CCOWI
001WI 0031
006WI 538 - NR3 SSTG Circulation Pump and Motor Repair
012WI 0035 - Damage Control Locker
047Chill Water Pump Motor Crating
053Mooring Station No. 5 and No.6 Repair
054Mooring Station Number One Repair (CoC 788)
055Boiler Stacks and Combustion Intake Clean and Inspect
056AS-CCSI-AC MOTOR AND VENT FAN REWIND
057Firemain Valves Replace
058Fuel Piping Riser Replace
059Shore Steam Dick Riser Piping
060Fuel Oil Pipe Replace
074Vent Plenum and BHD Repair
075WTD SILL AND STIFFENERS REPAIR
076SHIPS LAUNDRY STEEL REPAIR
077J-BAR AND DAVIT REPAIR
078PASSAGE WAY DECK REPAIR
07902 LEVEL PORT DECK REPAIRS
080PASSAGE WAY DECK REPAIR
081UNDER DECK STIFFENER
082FAN ROOM PRESERVATION
083VENT PIPE AND PLUMBING REPLACE
084FIXED HANDRAIL REPLACE
088ECHO SOUNDER WATER HEATER PRESERVATION

File details come from the government source that posted it. Updated .