JA_MUHJ 22-0031 Study Stormwater Credits_Fully Executed_Redacted.pdf

PDF 286 KB Posted

Attached to
MUHJ 22-0031 Study, Stormwater Credits
Solicitation number
FA480022C0018
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Justification and Approval (J&A) for Other Than Full and Open Competition

CONTROLLED UNCLASSIFIED INFORMATION

April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 5April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 5

I. Agency and Contracting Activity.

Department of the Air Force 633d Contracting Squadron 14 Burrell St, Building 67 Joint Base Langley-Eustis, VA 23665

II. Nature and/or description of the action being approved.

This Justification and Approval (J&A) is for the award of a new Firm-Fixed-Price Architect and Engineer (A&E) sole source contract to NuGlobal Solutions, LLC (NGS) CAGE: 60UN8. NGS is a self-certified Economically Disadvantaged Women- Owned Small Business (EDWOSB). This action is for 633 Civil Engineer Squadron (CES) project MUHJ 22-0031 that will provide the expansion of the HEC-RAS model and ArcPro platforms to capture stormwater credits .

Background Information: NGS previously developed a Hydrologic Engineering Center-River Analysis System (HEC- RAS) model for Langley AFB. NGS calibrated this model to the NASA Flood Tool, refined the model to predict the effectiveness of existing and proposed Best Management Practices (BMPs) under a variety of future flood, rainfall, storm surge, and sea level rise possibilities, utilized United States Air Force (USAF) Sustainable Asset Accounting System (SAAS) to demonstrate the triple bottom line (economic, ecological, and social) value of the BMPs, and facilitated meetings with multiple base and regional stakeholders to gain agreement on the features and locations of proposed BMPs. NGS created the HEC-RAS model via a task order written by 633 CONS/PKB (FA480019FA202) under a Navy Environmental Analysis Indefinite Delivery Indefinite Quantity (IDIQ) contract (W912HP16D0016).

The Navy Environmental Analysis IDIQ has expired, and thus is not an option for this action.

III. Description of supplies/services required to meet agency needs (including the estimated value).

The objective of this study is to use any and all information available provided by the installation, and through site visits and meetings with installation representatives, to identify opportunities the installation can potentially install new Best Management Practices (BMP) to create excess Total Phosphorus (TP) reduction to optimize future MILCON design initiatives.

The A/E shall work closely with Base Planning, Environmental (Water Program Manager), and Virginia Department of Environmental Quality (VDEQ) to identify areas that are in the best interest of the installation to install new BMPs to create excess TP reduction amounts for future MILCON of 10,000 ft.2 or more. The new BMPs would provide for construction only and not the Chesapeake Bay TMDL reductions. The target load for TP reduction for MILCON project areas ≥ to 1 acre is 0.41 lbs./acre/yr. For projects at 10,000 ft.2 and less than an acre the reduction is 10% of TP.

The A/E shall identify the best opportunities for the installation to install new BMPs at the lowest possible cost to the government and generate the most stormwater TP reductions for future MILCON projects with regards to runoff and TP. The BMPs that will be tied to future development will have to remain undisturbed and marked to prevent any future development after installation. BMPs may only be selected from the current VA DEQ BMP Clearinghouse.

The study shall consist of a JBLE-Langley BMP "Master Plan" including a description of all different types of BMPs and which type of BMP or a combination there-of would be best suited for JBLE-Langley. The deliverable should also include an itemized spreadsheet consisting of a unique identifier per each proposed site, location, type of BMP to be installed, estimated cost to install the BMP and the TP reduction generated by each BMP installed. (For example, a grass channel stormwater function reduces TP 24%, the question that needs answering is how much grass channel (linear ft.) is needed to reduce annual TP below 0.41 lbs./acre/yr.) Expected maintenance costs should be taken into consideration as a selection variable as well. The spreadsheet should be able to be easily sorted by cost, type of BMP, number of SW credits generated etc., with the top proposed sites producing the most SW credits at the lowest possible cost in the most opportunistic locations.

The spreadsheet should correlate to a map generated by the awarded bidder in GIS that identifies the location of all existing BMPs and the proposed location for all new BMPs. The installation has well documented the location of, April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 5April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 5 condition and description of all existing BMPs. All of this information will be turned over to the awardee as well as any necessary required base maps in GIS.

The Final Chesapeake Bay Phase II TMDL Action Plan, 2019 indicated that if the existing and proposed BMPs considered in their analysis were maintained and fully functional to design performance, the base will meet its second permit cycle reduction requirement goals for all pollutants of concern (POCs). The objective of this study is to update these analyses to account for all pending BMPs and new sources not included in the initial evaluation and to assess the need to expedite proposed BMPs installation or supplement BMPs to specifically address TMDL reduction requirements in addition to climate change impact. The estimated value of this effort is .

IV. Statutory authority permitting other than full and open competition.

10 USC 2304(c)(1), as implemented by FAR 6.302-1(a)(2)(iii), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements.

V. Demonstration that the contractor's unique qualifications or the nature of the acquisition requires use of the authority cited above (applicability of authority).

The justification for restricting competition is in accordance with 10 USC 2304(c)(1), as implemented by FAR 6.302-1(a)(2)(iii), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements.

Awarding a contract to NGS is a logical follow-on to incorporate the expansion of the HEC-RAS model and ArcPro platforms to capture stormwater credits. NGS previously created the customized HEC-RAS model for Langley AFB.

NGS coordinated with multiple Langley AFB personnel and the City of Hampton, the National Aeronautics and Space Administration (NASA) and regional stakeholders to gain agreement on the features and locations of the proposed BMPs. Using the findings of its study and the HEC-RAS model that it created, NGS is the only company positioned to design the proper installation and location of flood gates, design revised site work measures to include grading/ buildup to reduce soil erosions, design strategic plantings & wetland expansions, and design the construction of storm water drainage systems, structures, and outfalls such as stream upgrades, piping upgrades, water ducts, surface drains, door dams, ditches, etc., throughout Langley AFB.

If NGS is not awarded this sole source effort, then the Government will incur a substantial duplication of costs that is not expected to be recovered through competition. Any new contractor would be required to conduct an extensive study of Langley AFB, coordinate numerous meetings with various Langley AFB personnel, the City of Hampton, NASA, the Virginia Department of Environmental Quality (VDEQ), and other regional stakeholders (causing all of these entities to duplicate effort and money), before it could begin the building of a similar HEC-RAS model. The last effort by NGS took a total of 339 calendar days to complete and the cost was $152,379.00.

Applying a similar timeline to a new project is deemed a duplication of effort that would not be recovered through competition

Furthermore, NGS's intimate knowledge of Langley AFB and surrounding areas that are vulnerable to sea level rise and climate change, along with its previous modeling effort to address these vulnerabilities using proposed BMPs is critical to efficient execution of the proposed project. A new consultant will require significant time and resources to get up to speed with issues on the base, as well as the customized model, and obtain buy-in from all stakeholders prior to starting on the actual design of BMPs. This could include a complete rethink of the proposed solution and result in delays in implementation potentially resulting in impacts to base infrastructure during the period.

Lastly, NGS possesses the following unique/highly specialized capabilities/qualifications, and due to it having performed the initial study and being the creator of the Langley AFB HEC-RAS model, makes NGS the sole source contractor to properly design the Storm Water BMPs:

• Use of HEC-RAS, Simulating Waves Near shore (SWAN) model or SWAN+ADvanced CIRCulation (ADCIRC) model

April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 4 of 5April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 4 of 5 platforms for predictive modeling;

• Use of Triple Bottom Line Sustainable Asset Accounting System model to demonstrate the business case for sustainability managing built/natural assets by considering the externalized and internalized cost of actions in terms of economic, environmental, and social impact;

• Technical facilitation of meetings for multi-discipline teams to evaluate data, design, and develop consensus decisions;

• Adaptive design based on the Sustainable Drainage Systems (SUDS) standards currently used in the United Kingdom and/or the ASCE Committee on Adaption to a Changing Climate, Climate-Resilient Infrastructure Adaptive Design and Risk Management;

• Sediment profile imaging (SPI);

• Remote sensing;

• Drone (aquatic and/or aerial) data acquisition technologies to collectively characterize subsurface, nearshore, and coastal environments;

• High level data evaluation using a combination of forensic chemistry, chemo-metric analysis, benthic habitat through SPI, bathymetric, remote sensing, and geostatistical methodologies to characterize assess, and monitor the base;

• Data visualization using an assimilation of all available data to provide customizes open-source or PC based visualization platforms;

• Use of open-source web mapping and interfacing applications; customization of cross platform products without limiting to proprietary enterprise solutions through products such as ArcGIS, Quantum GIS, CTech, or Rockworks outputs as stand-alone or integrated into an interactive produce; and

• Use of platforms supported by Postgre SQL/PostGS or Access databases.decisions;

• Adaptive design based on the Sustainable Drainage Systems (SUDS) standards currently used in the United Kingdom and/or the ASCE Committee on Adaption to a Changing Climate, Climate-Resilient Infrastructure Adaptive Design and Risk Management.

VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable, including whether a notice was or will be publicized as required by subpart 5.2 and, if not, which exception under

FAR 5.202 applies.

Based on the rationale in Section V above, it is not practicable to solicit additional sources for this immediate requirement. In accordance with FAR 5.201, a notice of intent to award a sole source contract will be posted to SAM.gov to satisfy the publicizing through the Governmentwide point of entry (GPE) requirement.

The sole source action will allow Langley AFB to continue to combat and enhance resilience to vulnerable assets on the installation impacted by a one foot forecasted Storm Surge and Sea Level Rise (SLR) over the next 10 years.

VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.

A technical evaluation will be conducted by the Project Manager (PM) and the proposal will be evaluated to determine price fair and reasonable in accordance with the techniques outlined in FAR 15.404-1 Proposal Analysis Techniques.

April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 5 of 5April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 5 of 5

VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.

Market research was conducted by the Project Manager and found that NGS uniquely offers specialized consulting and engineering services. Additionally, NGS holds the customized HEC-RAS model as developed in the previous requirement.

IX. Any other facts supporting the use of Other Than Full and Open Competition.

N/A

X. List of any sources that expressed, in writing, an interest in the acquisition.

NuGlobal Solutions LLC (NGS) CAGE: 60UN8

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.

Because the HEC-RAS model was developed by NGS, a barrier to competition exists in which award to another contractor will require additional cost and effort in order to validate NGS' prior work. No action by the agency can remove this barrier to efficient and effective competition.

XII. Certification by the Contracting Officer.

As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.

XIII. Certification by the technical/requirements personnel.

As evidenced by my signature above, I certify that any supporting data contained herein, which is my (our) responsibility, is both accurate and complete.

File details come from the government source that posted it. Updated .