This is a Limited Sources Justification and Approval (J&A) document from the 355th Contracting Squadron at Davis-Monthan AFB, Arizona, for a brand name procurement under the Multiple Award Schedule Program (FAR 8.405-6). The procurement is for JLG Aerial Telescopic Boom Lifts and JLG Aerial Scissor Lifts to support 309 AMARG Aircraft Preservation Services. The requirement includes two 80-foot telescopic boom lifts at an estimated $187,875 each and two 33-foot scissor lifts at an estimated $51,481 each, with a total estimated contract value that appears to be redacted.

The justification cites FAR 8.405-6(b)(1) as the basis for limiting sources, stating that the item is peculiar to one manufacturer and represents a brand name requirement. The document references DoD Manual 4120.24 and Commercial Item Description (CID) A-A-60004C dated January 4, 2018, which identifies JLG Industries (a subsidiary of Oshkosh Corporation) as the sole Original Equipment Manufacturer for this type of equipment. The contracting officer Patricia Murray signed the document on June 16, 2025, certifying that this brand name procurement represents the best value for the government based on standardization requirements and military specifications. Market research was conducted among required sources including AbilityOne, Unicor, and GSA schedules, with only GSA Multiple Award Schedules determined to be viable options for the procurement.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTROLLED UNCLASSIFIED INFORMATION

Limited Sources Justification and Approval (J&A)

CONTROLLED UNCLASSIFIED INFORMATION April 2021 Page 2 of 6

( See guidance at the end of this document for completing the following sections. )

I. Contracting Activity.

355th Contracting Squadron, Davis-Monthan AFB, AZ, is procuring Brand Name JLG Aerial Telescopic Boom Lifts and JLG Aerial Scissor Lifts in support of 309 AMARG Aircraft Preservation Services.

II. Nature and/or description of the action being processed.

This procurement is a "Limited Sources" BRAND NAME requirement to procure qty 2 JLG Aerial Telescopic Boom Lifts and qty

(2) JLG Aerial Scissor Lifts meeting all specifications and capabilities in the Salient Characteristics Document and IAW CID A-A-60004C dated 4 Jan 2018.

III. Description of supplies/services required to meet agency needs.

Item Supplies/Service Quantity Unit Unit Price CLIN 0001 Telescopic Boom Lift, 80ft 2 EA $187,875 (estimated) CLIN 0002 Scissor Lift, 33ft 2 EA $51,481 (estimated)

IV. Identification of the justification/rationale for limiting sources and demonstration of the contractor's unique qualifications to provide the required supply/service.

FAR 8.405-6(b) requires an ordering activity to justify its actions when restricting consideration of schedule contractors to fewer than required in FAR 8.405-1.

FAR 8.405-6(b)(1), "The item is peculiar to one manufacturer. A brand name item, whether available on one or more schedule contracts, is an item peculiar to one manufacturer." (Brand name specifications should not be used unless the particular brand name, product or feature is essential to the Government's requirements. Therefore, explain why the particular brand item is essential to the Government's requirements, and why other companies' similar items, or products lacking the particular feature, do not meet, or cannot meet, or cannot be modified to meet, the agency's need. The user/customer typically provides this supporting information. General statements are not acceptable.)

In accordance with FAR part 11.102 Standardization Program and the DoD Acquisition Streamlining and Standardization Information System (ASSIST) website, a query was conducted to search for equipment designated that meets the specified DoD Federal Specifications and Standards for the required Aerial Lifts. Commercial Item Description (CID) document from this query for `TRUCK, LIFT, PLATFORM, ENGINE-DRIVEN, TELESCOPING BOOM' obtained via the ASSIST tool which identifies National Stock Numbers for this type of equipment. A search of the NSN's identified in the CID shows the identified Original Equipment Manufacturer (OEM) as JGL Industries, a subsidiary of Oshkosh Corporation, and a Large Business with no other manufacturers of their products.

V. Determination by the ordering activity Contracting Officer that the order represents the best value consistent with

FAR 8.404(d).

It has been determined that it is in the Government's best interest to procure BRAND NAME JLG Aerial Lifts per Department of Defense Manual 4120.24 and CID A-A-60004C dated 4 Jan 2018.

VI. Description of the market research conducted and the results, or explain why market research was not conducted.

In accordance with FAR 8.002 a review of all required/recommended sources was accomplished to include: AbilityOne, Unicor and GSA. AbilityOne and Unicor are not viable options to support this requirement. GSA established several Multiple Award Schedules which are active and determined to be viable options for procurement of the Government's requirement.

CONTROLLED UNCLASSIFIED INFORMATION April 2021 Page 3 of 6

VII. Other facts supporting the justification.

Standardization: Department of Defense Manual 4120.24 - Enclosures 3 and 4, details the applicability and procedures of the defense standardization program. Procurement of the requested JLG Lifts meets multiple criteria identified in the manual for standardization of equipment and JLG is identified via National Stock Number per CID A-A-60004C dated 4 Jan 2018.

VIII. Actions the agency may take to remove or overcome any barriers that led to the restricted consideration before any subsequent acquisition for the supplies or services.

The goal of the 355th Contracting Squadron is to promote competition in order to ensure the Government is receiving the best value product. IAW military standards and Air Force Technical Orders, this Brand Name is the sole product to meet the requirements for Aircraft preservation services. The 355th Contracting Squadron will continue to conduct market research by posting sources sought notices to the Federal Business Opportunity website, conducting Industry Days, researching available product leads and reaching out to commercial experts in an effort to find other products that can fulfill the government's needs IAW with the aforementioned Department of Defense Directives.

IX. Certification by the Contracting Officer.

As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.

X. Certification by the technical/requirements personnel.

As evidenced by my (our) signature(s) above, I (we) certify that any supporting data contained herein, which is my (our) responsibility, is both accurate and complete.

CONTROLLED UNCLASSIFIED INFORMATION April 2021 Page 4 of 6

GUIDANCE

I. Contracting Activity.

Fully identify the contracting activity responsible for the proposed contracting action. Include the name/phone number of the Contracting Officer. Specifically identify as a “Limited Sources” Justification. Identify purchase request number, if applicable.

II. Nature and/or description of the action being processed.

State whether the action is a new order or by modification to an existing order. Identify the GSA schedule number, the Blanket Purchase Agreement (BPA) number, the order number for the current action, and the Contactor(s). Indicate the Period of Performance (PoP). Also identify the type of the order/line items on the order (e.g. Firm Fixed Price, Labor Hour, etc).

III. Description of the supplies/services required to meet agency needs.

Specifically describe the supplies and/or services to be acquired including the price and quantity of each item in the order and state the total estimated value of the order. For services, state whether the services are performance-based and, if not, provide rationale for not being performance based. Also state the delivery/performance schedule/period for the items under the order.

IV. Identification of the justification/rationale for limiting sources and demonstration of the contractor's unique qualifications to provide the required supply/service.

This section is normally the most detailed part of the justification. To assist you in preparing this justification, an introductory sentence and the four circumstances of FAR 8.405-6 that justify restricting the number of schedule holders are provided below. Select the appropriate cite, then provide, in narrative form, a detailed explanation supporting the specific circumstance cited for limiting the number of schedule holders.

(Introductory sentence) FAR 8.405-6 requires an ordering activity to justify its actions when restricting consideration of schedule contractors to fewer than required in FAR 8.405-1 or 8.405-2.

After selecting the appropriate cite, next select one of the four sentences below and provide a detailed explanation supporting the specific circumstance cited.

FAR 8.405-6(a)(1)(i)(B), “Only one source is capable of responding due to the unique or specialized nature of the work”. (Provide a detailed justification with supporting documentation, as evidence of the “unique or highly specialized” nature of the procurement.

The user/customer typically provides this supporting information. Recommend attaching supporting documentation to the back of the document. General statements are not acceptable.)

FAR 8.405-6(a)(1)(i)(C), “The new work is a logical follow-on to an original Federal Supply Schedule order provided that the original order was placed in accordance with the applicable Federal Supply Schedule ordering procedures.” The original order was not issued under sole source or limited source procedures. (Provide details on the previously competed order and explain how this order is a logical follow-on to that order. Explain fully the connection between the previous work/order and the current one.

The user/customer typically provides this supporting information. General statements are not acceptable.)

FAR 8.405-6(a)(1)(i)(A), “An urgent and compelling need exists, and following the ordering procedures would result in unacceptable delays.” (Provide a detailed justification with supporting documentation that explains the exact urgency of the requirement and the schedule impact if time were to be taken to follow FSS ordering procedures. The user/customer typically provides this supporting information. Recommend attaching supporting documentation to the back of the document. General statements of urgency are not acceptable.)

FAR 8.405-6(b)(1), “The item is peculiar to one manufacturer. A brand name item, whether available on one or more schedule contracts, is an item peculiar to one manufacturer.” (Brand name specifications should not be used unless the particular brand name, product or feature is essential to the Government's requirements. Therefore, explain why the particular brand item is essential to the Government's requirements, and why other companies' similar items, or products lacking the particular feature, do not meet, or

CONTROLLED UNCLASSIFIED INFORMATION April 2021 Page 5 of 6 cannot meet, or cannot be modified to meet, the agency's need. The user/customer typically provides this supporting information.

General statements are not acceptable.)

V. Determination by the ordering activity Contracting Officer that the order represents the best value consistent with FAR 8.404(d).

This section needs to be tailored based upon whether the order is for supplies/services not requiring a statement of work (FAR 8.405-1) or if the order is for services requiring a statement of work (FAR 8.405-2).

For FAR 8.405-1 orders the best value determination needs to be based upon the supply or service offered under MAS contracts by surveying at least three schedule contractors through the GSA Advantage! on-line shopping service, or by reviewing the catalogs or price lists of at least three schedule contractors. The ordering Contracting Officer's review of the Contractor's price list(s) and any price reductions sought is also required. (Contracting Officer should seek additional price discounts/concessions based on the specific order requirements on all orders over the micro-purchase threshold.) In addition to price, when determining best value, the ordering activity may consider, among other factors, past performance, special features of the supply or service required for effective program performance, trade-in considerations, probable life of the item selected as compared with that of a comparable item, warranty considerations, maintenance availability, environmental and energy efficiency considerations, and delivery terms.

When an order contains brand name specifications, the Contracting Officer shall post the Request for Quote (RFQ) along with the basis of the justification as required by FAR 8.405-6(b)(3).

For FAR 8.405-2 orders for services requiring a statement of work, FAR 8.405-2(d) requires that an evaluation be performed based on the criteria provided to the schedule contractors. Therefore, the justification must address how the FAR 8.404(d) requirement for an evaluation of the proposed level of effort and mix of labor will be conducted and include a statement that the Contracting Officer will perform a price reasonableness determination as part of the best value determination.

VI. Description of the market research conducted and the results, or explain why market research was not conducted.

Discuss market research that was conducted among schedule holders and the market research results that led to the conclusion to go sole source or to limit the number of schedule holders to be solicited. The narrative in this section should provide a high level of confidence that the requirements of 8.405-1 and 8.405-2 could not be met. If no market research was conducted, state so and provide the rationale.

VII. Other facts supporting the justification.

When FAR 8.405-6(a)(1)(i)(C) is cited for an follow-on acquisition as the basis for the justification, include an estimate of the cost that would be duplicated and the basis and derivation of the estimate, or provide details on why a delay to solicit additional schedule holders would be unacceptable.

Provide any other facts supporting the Limited Sources Justification.

VIII. Actions the agency may take to remove or overcome any barriers that led to the restricted consideration before any subsequent acquisition for the supplies or services.

Describe all efforts to be taken to remove or overcome any barriers that preclude the agency from meeting the requirements of FAR 8.405-1and FAR 8.405-2 before any subsequent acquisition for the supplies or services is made. If no actions are planned, so state and provide reasons.

IX. Certification by the Contracting Officer.

The contracting officer's signature on the signature page evidences that he/she has determined this document to be both accurate and complete to the best of his/her knowledge and belief.

X. Certification by the technical/requirements personnel

CONTROLLED UNCLASSIFIED INFORMATION April 2021 Page 6 of 6

As evidenced by their signatures on the signature page, the technical/requirements personnel have certified that any supporting data contained herein which is their responsibility is both accurate and complete.