This document is a Justification and Approval (J&A) for Other Than Full and Open Competition (OFOC) for the Department of Veterans Affairs contract with Acquisition ID# 36C77624R0128.

The contract was awarded to STROLLO & STROLLO LLC on 2024-09-24 for $134,912.56 to provide Expand Primary Care Construction Period Services (CPS) - Lake Nona (East). The Department of Veterans Affairs Technology Acquisition Center Austin is the federal agency involved. The J&A justifies the use of other than full and open competition for this requirement.

View the file

Other files

File Type Posted
36C77624C0201_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAPG Part 806.3 OFOC Page 1 of 6 Revision: 03 Effective Date: 04/15/24 Acquisition ID#: 36C77624R0128

DEPARTMENT OF VETERANS AFFAIRS

Justification and Approval (J&A) For

Other Than Full and Open Competition (<SAT)

Acquisition Plan Action ID: 36C776-24-AP-1541

1. Contracting Activity:

The contracting activity for this requirement is the Department of Veterans Affairs, Veterans Health Administration (VHA) Program Contracting Activity Central (PCAC).

2. Nature and/or Description of the Action Being Processed:

This justification is in support of a new, single award, Firm-Fixed-Price (FFP) contract for an Architectural-Engineering (AE) firm to provide Construction Period Services (CPS) for Project 521-330 Expand Primary Care, Orlando VAHCS – Lake Nona campus. CPS includes pre-construction meeting, bi-monthly site visits that will span the construction period of performance of 750 calendar days, responses to RFIs, review and approval of contractor’s Shop Drawings, Product Data, and Samples.

The AE shall also furnish a final, and updated set of drawings to be used for the construction of said project.

3. Description of Supplies/Services Required to Meet the Agency’s Needs:

Contract 36C24819D0020 for Project 675-100 Expand Primary Care (Minor) Construction project was awarded to Strollo & Strollo, LLC. (Strollo), on September 29, 2019, by NCO 8 in the amount of $1,619,017.49. CPS was originally accounted for in this award. The design was completed in February of 2024. The construction procurement package was submitted to PCAC in March of 2024, with the final construction documents from Strollo. Upon review of the design contract, it was determined that the funding for the CPS would expire at the end of Fiscal Year 2024. After discussion, Network Contracting Office (NCO) 8 and PCAC determined that the CPS portion of the contract with Strollo would be terminated once the bids for the construction project were received by PCAC. At that time a new contract would be awarded using current year Minor funds.

The period of performance for the CPS, is 750 calendar days from notice of award. This will also match the period of performance of the construction contract. The anticipated award date is August 2024. The estimated cost of the CPS is $198,906.72.

4. Statutory Authority Permitting Other than Full and Open Competition:

(X) (1) Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements per 41 USC §3304(a)(1) as implemented by FAR 6.302-1;

( ) (2) Unusual and Compelling Urgency per 41 USC §3304(a)(2) as implemented by FAR 6.302-2;

( ) (3) Industrial Mobilization, Engineering, Developmental or Research Capability or Expert Services per 41 USC §3304(a)(3) as implemented by FAR 6.302-3;

( ) (4) International Agreement per 41 USC §3304(a)(4) as implemented by FAR 6.302-4

( ) (5) Authorized or Required by Statute per 41 USC §3304(a)(5) as implemented by FAR 6.302-5;

( ) (6) National Security per 41 USC §3304(a)(6) as implemented by FAR 6.302-6;

( ) (7) Public Interest per 41 USC §3304(a)(7) as implemented by FAR 6.302-7;

VHAPG Part 806.3 OFOC Page 2 of 6

Acquisition ID#: 36C77624R0128

5. Demonstration that the Contractor’s Unique Qualifications and/or Nature of the Acquisition Requires the Use of the Authority Cited Above (applicability of authority):

This requirement is for Architect-Engineering services associated with the design, construction, and alteration of real property, so commercial business practices were not considered, and the commercial marketplace was not surveyed.

The proposed source for this acquisition is Strollo, a registered and verified small business, located at 718 Virginia Dr., Orlando, FL., 32803. Strollo is technically qualified for this project as they are the designer of record for this current (Minor) requirement. A review of the Contractor Performance Assessment Reporting System (CPARS) has confirmed Strollo’s successful past performance on VA design projects. The VA’s technical experts have determined that Strollo is the most qualified to perform the required services as they possess all institutional knowledge regarding this project and no other vendor either SDVOSB or small business concerns are willing to take over the liabilities from the original AE of record (see Section 6 below).

6. Description of Efforts Made to ensure that offers are solicited from as many potential sources as deemed practicable:

A VetCert query indicated there are 368 verified SDVOSBs under NAICS 541330 within the state of Florida, that could potentially submit on this project. On July 3, 2024, a Notice of Intent to Sole Source to an SDVOSB was posted to SAM.gov. No responses were received by the close date of July 18, 2024.

Also, a review of the VISN 8 AE Multiple Award Task Order Contract (MATOC) holders shows there are 20 certified SDVOSB firms performing design projects in the area. All 20 certified MATOC holders have previously been determined to be capable by NCO 8 prior to contract award. However, none of these MATOC holders were interested in performing this project after issuance of the Notice of Intent to Sole Source. Since no responses were received concerning the Notice of Intent to Sole Source there are currently no existing SDVOSB or other small business concerns that are interested in taking over the liabilities from the original AE of record concerning CPS.

This Justification and Approval (J&A) document will be posted within 14 days after award in accordance with FAR Subpart 6.305. The award synopsis will be posted to GPE in accordance with FAR Subpart 5.301(a)(1).

7. Determination by the CO that the Anticipated Cost to the Government will be Fair and Reasonable:

There were no responses received concerning the Notice of Intent to Sole Source. Previously on a similar project at the Tampa VA in FY 2023, feedback was provided from some of the NCO 8 IDIQ holders, as to why they were not interested in taking over a previous firm’s design during the CPS stage. They identified the following concerns:

• The amount of CPS effort is highly dependent on two factors out of our control: the quality of documents produced, and the quality of the contractor involved in the project.

• Who would be responsible for the engineering portion of the CPS? We would need to bring on consultants to review the various MEP shop drawings and RFI’s? I think engineers would be even less interested since they would be engineering the project again if any questions arise.

VHAPG Part 806.3 OFOC Page 3 of 6

Acquisition ID#: 36C77624R0128

• The scope says minor updates to the drawings and specifications may be required. I get very nervous about what that may require. Document quality, software requirements (I would only consider it if done in Revit) and liability responsibility for the design are all concerns with editing another architect’s design.

• No knowledge of the design process and priorities in the decision-making process.

• Without knowing all of the specifics, the pricing would most likely be at least two times higher than the normal cost of CPS for this project.

The market price for the AE’s rates for CPS will be compared with their rates from the design portion of this project, from the IGCE, and from rates that have been used in previous design projects at the Lake Nona VAMC. A fair and reasonable determination will be made by the Contracting Officer before award will be made.

PCAC has experience with sole sourcing solicitation support services and CPS in support of Minor construction projects. Below is an overview of past scenarios where PCAC was required to obtain solicitation support services and/or CPS from an AE where the services were not part of the original design contract. In some cases, there was a sole source to the same AE of record and in other instances to a new AE. The comparisons can be found below.

1. Project # 675-901 Expand Emergency Department Minor, Lake Nona VAMC: The original design task order for this project was awarded by Network Contracting Office (NCO) 8 on September 9, 2020, in the amount of $208,920.95 to RDC/John Poe Architects. This task order did not include CPS, as it stated these would be procured through a separate task order. In 2022, PCAC was sent the requirement to procure the construction portion of the project and during the procurement review it was discovered the CPS was not part of the project. Since RDC/John Poe Architects was a verified SDVOSB and the original design firm, it was determined to sole source this project to them in accordance with VAAR 819.7007. The estimate provided was in the amount of $86,146.00, for a performance period of 270 calendar days, to include attendance at the pre-construction meeting, monthly site visits, responses to Requests for Information (RFIs) and submittals, review of change orders, inspections and testing, work acceptance and providing As-Built drawings. This sole source contract was awarded to the original design firm. The award amount of $83,120.23 was $3,025.77 less than the IGCE amount of $86,146.00.

2. Project # 673-100 Specialty Treatment Expansion Minor, Tampa VAMC: Contract VA248- 17-C-0107 for the Specialty Treatment Expansion (Minor) Design was awarded to TTV Architects Inc. (TTV), on June 30, 2017, by NCO 8 in the amount of $392,198.00. Solicitation support services and CPS was originally accounted for in this award. This contract was terminated because the money expired before the construction design was completed. In 2023, PCAC was sent the requirement to procure the construction portion of the project as well as solicitation support services and CPS. A sole source award for the solicitation support services and CPS was made to TTV on August 10, 2023, in the amount of $573,352.44. The award amount was 7.4% more than the IGCE amount of $532,587.72.

3. Project # 438-440 Construct New Laboratory Addition Minor, Sioux Falls VAMC: NCO 23 awarded the design contract for this project on September 29, 2017, in the amount of $803,587.71, to Anderson Engineering. The design contract did not contain CPS. The construction procurement was sent to PCAC in March of 2019. As part of the procurement

VHAPG Part 806.3 OFOC Page 4 of 6

Acquisition ID#: 36C77624R0128 request, PCAC was tasked with procuring the CPS with Anderson Engineering. The IGCE was in the amount of $291,530, to include solicitation support services and CPS. In accordance with VAAR 819.7007, this project was sole sourced to Anderson Engineering. The award was made on May 1, 2019, in the amount of $121,720.63, to include both solicitation support services and CPS. This sole source contract was awarded to the original design firm. The award amount of $121,720.63 was $169,809.37 less than the IGCE amount of $291,530.00.

4. Project # 662-626 Renovate and Expand Locked Psychiatric Intensive Care Unit for Patient Privacy (PICU) Minor, San Francisco VAMC: NCO 21 awarded the design contract for this project to Polytech Associates, Inc. (Polytech). The design was completed in 2018, however additional changes were requested by the VA of Polytech in June of 2019. The site determined not to move forward with CPS through Polytech and requested that PCAC procure these services through one of the existing NCO 21 AE IDIQs. Only one of the thirteen IDIQ holders responded to the solicitation request. The IGCE for this project was $202,227, which was in line with the CPS pricing from Polytech’s original contract. The scope included construction document familiarization of the AE with all the current documents from the original designer, solicitation support services, and CPS to include attendance at the pre-construction conference, review of submittals and RFIs, 40 site visits, review of change orders, commissioning of the HVAC systems and record drawings. The task order was awarded to MA Architects on August 27, 2019, in the amount of $528,577. This contract was awarded to the only design firm willing to take on the previous design firm’s liabilities.

The award amount of $528,577 was $326,350 greater than the IGCE amount of $202,227.

5. Project # 438-460 Construct New SPS Minor, Sioux Falls VAMC: The original design for this project was awarded by NCO 23 against one of their existing AE IDIQs to Four Front Design.

The task order did not include solicitation support services or CPS. The design was completed in September of 2020 and the requirements for the construction procurement were sent to PCAC in the Spring of 2021. The site requested that PCAC go out and compete the requirements against the existing NCO 23 AE IDIQs, instead of continuing with the original designer of record. The IGCE provided by the site was in the amount of $495,526.

The scope of work included the AE reviewing the 100% drawings and specifications prior to the construction solicitation phase and to issue any supplemental drawings, addendums, revised sheets and specifications to resolve issues uncovered in the plan review phase. The anticipated period of performance for the plan review service is 30 calendar days. The scope also included solicitation support services (performance period 90 calendar days) and CPS, that consisted of shop drawing review, answering contractor RFIs, providing change order documents, construction observation site visits (at least 11), record drawings, revit model generation, and a red-line set of construction documents. The POP for the CPS is scheduled to be 400 calendar days. The total period of performance was 520 calendar days.

The AE that selected after evaluations was Anderson Engineering of Minnesota. After several months of negotiations, a task order was awarded to Anderson Engineering on September 2, 2021, in the amount of $326,692. This contract award amount of $326,692 was $168,834 less than the IGCE amount of $495,526. However, the final value of the award became $833,614, which was $338,088 greater than the IGCE amount of $495,526 as outlined below.

The review of the existing construction documents by Anderson was supposed to take 30 days and then PCAC could issue the construction solicitation, with the intent to award the project around June of 2022. This was not the case as Anderson discovered a number of

VHAPG Part 806.3 OFOC Page 5 of 6

Acquisition ID#: 36C77624R0128 problems and a total of four modifications were issued during the review period of the previously completed construction documents. Below is an overview of these modifications:

• Mod P00001 was issued on October 22, 2021, to incorporate COVID related clauses into the contract at no addition cost to the Government.

• Mod P00002 was issued on December 22, 2021, for an additional $506,922 to increase the overall task order value to $833,614. The objective of this modification was to revise the Plan Set and allow Anderson Engineering to become the official engineer of record for the project. In accordance with SOW - Plan Set Revision 12-6-

21. Increase in the amount of $506,922.00. Additionally, extend the Period of Performance by 125 calendar days, changing the end date from February 6, 2023 to June 11, 2023. The nature of the work remains unchanged.

• Mod P00003 was issued on April 26, 2022, for no additional costs, to increase the period of performance by 60 days for a new completion date of August 10, 2023.

• Mod P00004 was issued on June 7, 2022, for no additional costs, to increase the period of performance by 30 days for a new completion date of September 12, 2023.

The updated 100% design documents and estimate were approved by the VA on August 25, 2022, and the package was sent to PCAC for construction in September of 2022 for procurement.

Based on the information above, when pricing is received from the original AE of record, it will be more in line with the IGCE. When another AE takes on the responsibilities of the previous design firm of record, pricing tends to be much greater than the IGCE. The concerns of taking over a previous firm’s design during the CPS stage, as outlined by RDC/John Poe Architects, would account for this price increase. Furthermore, utilizing the past pricing received from the AE that was part of the original design, the CO expects the COR's estimate to be in-line with Strollo's pricing and ultimately fair and reasonable.

8. Description of the Market Research Conducted and the Results, or a Statement of the Reasons Market Research Was Not Conducted:

Market research techniques used to identify potential sources for this (Minor) requirement include contacting knowledgeable individuals in Government and Industry regarding market capabilities to meet requirements, querying the Veteran Small Business Certification (VetCert) at Veteran Small Business Certification (sba.gov), review and comparrision of historical data, and posting a Notice of Intent to Sole Source.

Through the aforementioned efforts, no responses were received to the Notice of Intent to Sole Source.

9. Any Other Facts Supporting the Use of Other than Full and Open Competition:

It is recommended that a sole source award be made to Strollo. Strollo is a Small Business concern that has completed the design portion of this (Minor) requirement. A sole source award to Strollo is in the government’s best interest to successfully complete the CPS for this (Minor) requirement as they possess all institutional knowledge regarding this project and no other vendor either SDVOSB or small business concerns are willing to take over the liabilities from the original AE of record.

https://veterans.certify.sba.gov/ https://veterans.certify.sba.gov/

VHAPG Part 806.3 OFOC Page 6 of 6

Acquisition ID#: 36C77624R0128

10. Listing of Sources that Expressed, in Writing, an Interest in the Acquisition:

The following AE firm expressed interested in this project:

a. None

11. A Statement of the Actions, if any, the Agency May Take to Remove or Overcome any Barriers to Competition before Making subsequent acquisitions for the supplies or services required:

The Lake Nona VAMC and VHA PCAC will solicit future design projects through the existing NCO 8 MATOC or will compete the project on the open market using the procedures established in FAR Subpart 36.6 for AE procurements.

12. Requirements Certification: I certify that the requirement outlined in this justification is a Bona

Fide Need of the Department of Veterans Affairs and that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and belief.

Daniel Riquer Date COR/Engineer Lake Nona VAMC

13. Approvals in accordance with the VHAPM Part 806.3 OFOC SOP:

a. Contracting Officer or Designee’s Certification (required): I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.

Bridget May Date Contracting Officer Program Contracting Activity Central (PCAC)

b. One Level Above the Contracting Officer (Required over $250K but not exceeding $750K): I certify the justification meets requirements for other than full and open competition.

Donald A. Marsh III Date Supervisory Contracting Officer VHA Program Contracting Activity Central (PCAC)

Prepared By: Jason Phillip, Contract Specialist

BRIDGET MAY Digitally signed by BRIDGET MAY Date: 2024.07.23 09:10:49 -04'00'

DANIEL RIQUER Digitally signed by DANIEL RIQUER Date: 2024.07.23 11:56:57 -04'00'

DONALD MARSH Digitally signed by DONALD MARSH Date: 2024.07.23 12:13:13 -04'00'