JA_FIRE_DOORS1_REDACTED.pdf
PDF 270 KB Posted
- Attached to
- USNS EARL WARREN FIRE DOORS (T-A0 207)-SOLE SOURCE TRIDENT MARINE SYSTEMS Federal contract opportunity
- Solicitation number
- N3220524Q0262
About this file
This document is a Justification for the Use of Other Than Full and Open Competition for an acquisition under the Simplified Acquisition Threshold. It provides the rationale for a sole source award to Trident Marine Systems for the procurement of fire doors for the USNS Earl Warren (T-AO 207).
The key details are: The requirement is for LLTM (Long Lead Time Material) fire doors for the USNS Harvey Milk, with a required delivery date of 1 May 2024. Trident Marine Systems is the only known source capable of providing the required fire doors, which are a direct replacement for existing equipment and must be compatible in form, fit, and function. The procurement is justified as an urgent and compelling requirement, as the supplies are mission critical and a work stoppage would seriously injure the government. The anticipated dollar value of the procurement is within the Simplified Acquisition Threshold. The document includes the required certifications and approvals for the sole source justification.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| USNS EARL WARREN FIRE DOORS Q0262.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 Ver 2.0 (01 June 2018)
Date: 10 APRIL 2024
MEMORANDUM
Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER THE
SIMPLIFIED ACQUISITION THRESHOLD
Ref: (a) PR Number(s): N32205XXXXXXX
I. BACKGROUND:
1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE:
1. Provide a description of the item or service required, to include
a) the name of the required source or brand name
TRIDENT MARINE SYSTEMS
b) the required delivery date/period of performance and
RDD 1 202
c) its intended use.
LLTM MATERIAL FOR USNS HARVEY MILK PSA – WI 101 – FIRE DOORS
2. List the source(s) or known vendor(s) who are able to provide the above described item or service.
TRIDENT MARINE SYSTEMS, 2651 DRUCKER LANE, SAN DIEGO
3 Ver 2.0 (01 June 2018)
i. Identify Make / Model Number(s): TRIDENT MARINE SYSTEMS, USJ-JDA-
10-01/A-60 SINGLE DOOR W/GASKET, LOCK CD-5603, WINDOW, 2DOG
ii. Identify other vessels with this Make / Model:
T-AO 205 CLASS (NEW
CONSTRUCTION 15 VESSELS)
c. FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.
i. Identify Make / Model of existing equipment:
ii. Describe how the equipment must be compatible with the existing configuration.
d. OTHER:
4. UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:
a. Date on which the requirement was identified:
b. Required delivery date / Period of Performance:
c. If the difference between a. and b. is more than one week, explain the delay in submitting the requirement.
d. Estimated production lead time:
e. Explanation of why delivery / commencement of services by the date required is needed:
(explain the impact to the mission, any special circumstances or conditions, etc.)
4 Ver 2.0 (01 June 2018)
f. CASREP Number:
IV. ANTICIPATED DOLLAR VALUE OF PROCUREMENT:
V. CERTIFICATIONS AND APPROVALS:
Technical / Requirement Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.
File details come from the government source that posted it. Updated .