JA_25134-0002_Redacted.pdf
PDF 269 KB Posted
- Attached to
- MOTOR, ALTERNATING C, IN REPAIR/MODIFICATION OF
- Solicitation number
- N0010426FZX02
About this file
This is a Justification for Other Than Full & Open Competition (J&A) issued by the Department of the Navy, NAVSUP WSS (Naval Supply Systems Command Weapon Systems Support) located in Mechanicsburg, Pennsylvania.
The acquisition seeks to award orders on a sole source basis under Basic Ordering Agreement N00104-23-G-ZX01 with Curtiss-Wright Electro-Mechanical Corporation (CAGE 04808) for repair and overhaul services. The contract type is C1 BOA with authorization through December 31, 2027. The procurement is justified under 10 USC 2304(C)(1) and FAR 6.302-1, citing that only one or a limited number of responsible sources can satisfy agency requirements. The specific rationale employs Authority/Reason and Rationale Code (A/RMSC) designation "R," indicating the Government does not own the technical data or rights necessary to procure repair services from additional sources, and it has been determined uneconomical to acquire such data or reverse engineer the part. The material is designated as SPECIAL EMPHASIS material (Level I) for use in crucial shipboard systems, particularly submarines, where incorrect, substitute, or defective material could result in serious personnel injury, loss of life, or loss of vital shipboard systems. Substitution is not authorized. Market research was conducted using ERP/ORACLE/FMT and FLIS databases. To promote future competition, NAVSUP WSS commits to encouraging vendors to submit complete technical data packages for source approval and will advertise future requirements on the government-wide point of entry. The J&A was approved on November 8, 2022, with signatures from the Contracting Officer, Competition Advocate, Attorney, and Program Manager.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11/8/22, 10:12 AM WorkflowPro https://my.navsup.navy.mil/apps/ops$workflow_pro.j_and_a_edit_legacy?p_id=10198 2/3
4. Statutory Authority Permitting Other Than Full & Open Competition
5. Rationale Justifying Use of Cited Authority
6. Description of Efforts Made To Solicit Offers From as Many Offerors as Practicable
7. Determination of Fair And Reasonable Cost
8. Actions to Remove Barriers to Future Competition
Ship To
Line of Accounting
This J&A is based upon the authority of 10 USC 2304(C) (1), only one or a limited number of responsible sources will satisfy agency requirements, as implemented by FAR 6.302-1
A/RMC 3
Acquire, for the second or subsequent time, directly from the actual manufacturer.
A/RMSC R
The Government does not own the data or the rights to the data needed to purchase / contract repair of this part from additional sources. It has been determined to be uneconomical to buy the data or rights to the data. It is uneconomical to reverse engineer the part. This code is used when the Government did not initially purchase the data and/or rights. If only one source has the rights or data to manufacture/repair this item, A/RMCs 3, 4, or 5 are valid. If two or more sources have the rights or data to manufacture/repair this item, A/RMCs 1 or 2 are valid.
This acquisition will be solicited to
CAGE NUMBER: 04808 CURTISS-WRIGHT ELECTRO MECHNICAL CORP
This material will be used in a crucial shipboard system. The use of incorrect, substitute or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material which has been previously shock and vibration tested for use on submarines. Substitution is not authorized.
The proposed contract action was synopsized on the government-wide point of entry on and as a result
Market research was conducted in accordance with far part 10. The results of the market research conducted (or the reason(s) market research was not conducted) are as follows
Market Research was conducted in the following databases: ERP/ORACLE/FMT, and FLIS. The Government failed to Procure adequate technical data necessary for these complex items, which must meet operational, and Reliability requirements .CAGE 04808 CURTISS-WRIGHT ELECTRO MECHNICAL possesses the necessary data rights to provide the required level of performance needed to meet fleet requirements.
The contracting officer determines that the anticipated cost to the Government of the supplies covered by this J&A will be fair and reasonable.
To promote competition, NAVSUP WSS will continue to encourage vendors with the expertise to repair the subject item to submit a complete technical data package for review and source approval by the appropriate engineering source approval authority per the (WSS) guidelines. Also, future requirements will be advertised on the government-wide point of entry.
For reasons set forth in Paragraph (5 & 6), NAVSUP WSS has no plans at this time to compete future contracts for the subject item covered by this document. If another potential repair source emerges, NAVSUP WSS will assess whether competition for future requirements is feasible. Also, future requirements will be advertised on the government-wide point of entry.
11/8/22, 10:12 AM WorkflowPro https://my.navsup.navy.mil/apps/ops$workflow_pro.j_and_a_edit_legacy?p_id=10198 3/3
9. Any Other Facts Supporting Other Than Full & Open Competition
History
Previous J&A Previous J&A Attached
N/A
Created By John Perisie Work Function Reprocurement Technician
Created Date 08/01/2022
01-AUG-22
I certify that the facts and representations under my cognizance which are included in this J&A are complete and accurate to the best of my knowledge and belief
Requirements Cognizance Signature
Konstantin Divinsky Work Function Reprocurement Technician
Requirements Cognizance Signature Date
08/16/2022
I certify that the facts and representations under my cognizance which are included in this J&A are complete and accurate to the best of my knowledge and belief
Technical Cognizance Signature
John Perisie Work Function Reprocurement Technician
Technical Cognizance Signature Date
08/04/2022
I certify that this J&A is accurate and complete to the best of my knowledge and belief
Contracting Officer Certification Signature
Lea Dubeck Work Function Supervisor
Contracting Officer Certification Signature Date
10/20/2022
I certify that the facts and representations under my cognizance which are included in this J&A are complete and accurate to the best of my knowledge and belief
Competition Advocacy Review And Concurrence Signature
Adam Johnson Work Function Competition Advocate
Competition Advocacy Review And Concurrence Signature Date
10/20/2022
I certify that this J&A is legally sufficient to the best of my knowledge and belief
Legal Sufficiency Review Signature
Susan Whitley Newburg
Work Function Attorney Legal Sufficiency Review Signature Date
10/26/2022
I certify that this J&A is accurate and complete to the best of my knowledge and belief
Approval Required By Far 6.304 Signature
Lynn Kohl Work Function Program Manager Approval Required By Far 6.304 Signature Date
11/08/2022
File details come from the government source that posted it. Updated .