JA-24-Belv-561_3GEN FLIR LRIP B-KIT Ceiling Increase and PoP Ext_22Aug_Redacted.pdf

PDF 2 MB Posted

Attached to
3GEN FLIR LRIP B-KIT Technical and Engineering Services - PoP extension and Ceiling increase
Solicitation number
Not on record
Issued by

About this file

This document is a Special Notice for a modification to extend the Period of Performance (PoP) and increase the ceiling on contract number W909MY-23-C-0004 with Raytheon Company for Third Generation Forward Looking Infrared (3GEN FLIR) B-Kit, Technical & Engineering, Test, and Logistics Services.

The modification will extend the PoP from 48 to 72 months, through June 30, 2029, and increase the Firm Fixed Price (FFP) ceiling for procurement of additional hardware production option lots in Fiscal Years 25 and 26, as well as increase the Cost Plus Fixed Fee (CPFF) ceiling for technical & engineering, test, and logistics services. This is a sole-source action pursuant to 10 U.S.C. 3204(a)(1) as implemented by FAR 6.302-1(a)(2)(ii)(A) as only Raytheon can provide the required services. The contracting agency is the Department of the Army Materiel Command, Army Contracting Command Aberdeen Proving Ground.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .