ETFO_Justification_ARA_Redacted_(2).pdf
PDF 1015 KB Posted
- Attached to
- Health and Human Effects Modeling for CBRNE
- Solicitation number
- J9ISR6856
- Issued by
-
Defense Threat Reduction Agency
About this file
The Defense Threat Reduction Agency (DTRA) contracting activity proposes to procure withoutusing full and open competition an effort entitled Health and Human Effects Modeling for CBRN Applied Research Associates Inc. will be the only contractor solicited to provide therequired technical effort.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Defense Threat Reduction Agency
8725 John J Kingman Road MS 6201 FI Beh,oJr, VA 22060·6201
EXCEPTION TO FAIR OPPORTUNITY JUSTIFICATION
I. Nature and/or Description of the A-ction
The Defense Threat Reduction Agency (DTRA) contracting activity proposes to procure without using full and open competition an effort entitled "Health and Human Effects Modeling for CBRN", Applied Research Associates, Inc. will be the only contractor solicited to provide the required technical effort.
2. Description of the Supplies/Services Required
The Technical Reachback Division, J91SR, requires that Applied Research Associates (ARA) completes the work to perform research and development to predict human effects and casualties including those mvol ving novel threat agents (NTA), toxic industrial chemicals/materials (TICITIM) and infectious/contagious disease and other factors that affect casualty estimation based on current research ofCBRN agents and per accepted U.S. policy; and perform research and devclopment support ing human effects and material editor modules within the Hazard Prediction and Assessment Capability (HPAC)/Joint Effects Model Science and Technology Prototype (JSTP). The work will be executed for a period of approximately 12 months at a total estimated cost of $608,806. The estimated period of performance for this follow-on effort is 30 April 13 - 20 Apr 14.
DTRAOI -03-D-00 14-0030 had and original period ofperfonnance of2 Oct 2011 - I Oct 2012 and a no cost extension modification was completed on 21 Sep 2012 to change the end date to 31 Dec 12. The delay in award between the last task and this follow-on is a result oflimitcd funding due to the Continuing Resolution. Also, the lead program management funct ion is being transitioned from the Chemical Biological Departmcnt to the Information Sciences and Application Department within DTRA Additionally. higher priority requirements within the Information Sciences and Application Department have resulted in an unplanned delay for this continuation.
3. Exception to Fair Opportunity
Under the terms of the DTRA Weapons of Mass Destmction IDIQ. ARA will conduct research and development on health and human effects modeling to include CBRN casualty estimation for DTRA J91SR as part ofa Logical Follow-on [or contract DTRAOI -03-D-0014-0030.
Furthermore, in accordance with FAR16.505 (b.) 2. (C),the order must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order already issued under the contract. The original order (DTRAO! -03-0 -0014 Task Order 0015) selecting this performer was competed and all awardees were given a fair opportunity to be considered. A follow-on effort was awarded under DTRAO I-03-D-0014 Task Order 0025 using the FAR16.505 (b.) 2. (C), exccption also. ARA has over nine years of experience in modeling health effects from chemical and biological agents, contagious diseases, modeling medical countermeasures for biological threats, and implementing contagious disease models for the U.S.
Anny Office of The Surgeon General (OTSG) and the Defense Threat Rcduction Agency (DTRA). 'Inc ARA team composed of experts in human effects modeling and software engineering with as Principal Investigator, and ~ as the Software Lead, is conducting research and development work for DTRA regarding the health effects of Chemical, Biological, Radiological, Nuclear, and Explosive (CBRNE) environments.
ARA conducts investigations, designs and performs tests, collects and docwncnts data, and develops science~based models in support of DTRA CBRNE human response modeling efforts.
In addition, ARA is currently working on a DTRA effort to link existing models of the respiratory tract with atmospheric hazard particle size distraction models to estimate deposition location of inhaled CBRN agents in the body.
The team assembled by ARA has expert scientific understanding and experience with human health effects. ARA has a longstanding partnership with DTRA in the development and support of human effects models for Hazard Predication Assessment Capability! 10int Effects Model and NBC CREST. This team has applied their expertise in development and evaluation of human effects models to solve DTRA challenges, such as development and implementation of an algorithm to detennine Acute Exposure Guideline Levels (AEGLs), which is dependent on exposure duration. The team has also been instrumental in implementing the NBC CREST human response models for CBRN agent exposure in an object~oriented form for transition to lPM~IS 10int Operational Effects Federation (JOE1-) The current team has an excellent track record under their current task order. Openly competing a new contract risks creating unacceptable delays in fulfill ing the agency's mission requirement, duplicating work already accomplished by the current team, and would likely result in a lower level of performance at an increased cost. This proposed task order is necessary to maintain a continuity of effort in this high priority area to meet DTRA requirements. This team has a current contract with the DTRA Nuclear Technologies Department, allowing for seamless leveraging between directorates. A new contractor would cost the government both time and money to reach the level of the current performer. A new contractor team would have to be proficient and experienced in all the above areas to be effective, and would require many months of training and increased funding to attain the level of expertise necessary to perform this work.
4. Basis of Action
The DTRA Weapons of Mass Destruction performer listed above is uniquely qualified to perform this follow-on work due to the technological challenges presented by 19I5R. Of specific interest is ARA's CBRN casualty and resource estimation tool for CBRN planning and decision support and rescarch and development of modeling health and human effects from CBRN agents.
This research will fulfill numerous HPAC/JEM capability gaps.
5. Market Research
Applied Research Associates, Inc. is clearly perceived as the industry leader in the development ofCBRN casualty estimation modeling and simulation. Their resident expertise and experience in long tenn development of human response models and medical effects ofa CBRN incident and the influence of aerosol particle size on the health effects of inhaled CBRN hazards are superior to other industry members. The requirement to provide significant advances to these modeling efforts and broaden their usefulness and applicability for casualty estimation and medical planning remain a critical advancement in the toolset to benefit DTRA and the Joint Program Executive Office for ChemicaVBiological Defense (JPEO-CHD) relevant programs of record in a timely, cost effective, efficient, and scientifically sound manner. It is apparent that commercial items cannot fulfill this requirement..
The Program Office recommends issuing a logical follow on task order to Applied Research Associates, Inc.
6. Other Supporting .'acts
The research and products currently being requested are based on 15 years of past research and development by the current performer. To duplicate this expertise and train another team would cost a significant amount of money and time. The following estimates are based on past cfforts not only within the Chemical and Biological Department but also with other DTRA Departments. The schedule slip that would be required to re-compete this action and train a new performer would cause a critical and unacceptable delay to the government. This would result in an unexecutable timel ine and a significant delay in research and development in casualty estimation for Technical Reachback. In addition, there would be additional costs incurred by the government to be able to duplicate the existing level of research and development by thc current performer.
Cost and Schedule Impacts:
• The published RDIBCR Process Action Lead Time (PALT) for a new competitive IDIQ task order action is 120 days (approximately 4 months).
• Once a new contract is awarded, it would take a minimum of30 to 60 days to effectively transition the developmental product.
• Additional delays would involve introducing the new performer to the HPAC/JEM development team and building the necessary relationships with other key government stakeholders. The current performer is involved in several key DoD efforts including the updating of Time Task Treater Files for CBRN agents and the development of the Common User Database. Both of these cfforts are integral to our research and development effort being proposed. In addition, the current perfonner ineludes several scientists who have established credibility in this research field and are involved in NATO working groups that directly impact our DTRA efforts.
• At a minimum, recompeting the task order would push the project 6-9 months behind schedule but more importantly the transition time to train a new performer and establish the same level of involvement within other DoD working groups would result in longer delays and significantly highcr costs. A 6-9 month 'spin up' would add costs of approximately $400,000.
Cost Impacts:
There are numerous government eosts that would likely be duplicated in thc event of a new competitive action this far into the technology development. This technology was developed over the last decade by the key personnel on the existing task order. Over the course of this development, the perJonner has gained valuable and unique understanding of the CBDP and the health and human cftccts modeling requirements.
In addition, a great deal of time has been spent on the part of the COR and his government and A&AS support to ensure that the perfonner has the knowledge and understanding necessary to cffectivC\y develop CBRN medical effects modeling tools for various organizations. To select a new perfonner at this time, much of the "corporate knowledge" gained by the current perfonner would be lost, and the ability to develop useful and effective modc\s would not be assured and also the research and development would be set back by at least a year while the new performer was trained and integrated with DTRA, JPEO-CBD and other stakeholders.
7. Subsequent Actions
This logical follow-on is being executed by the Agency to realize both cost and time savings and leverage existing expertise, relationships, and technology development. This is supported by cost and time savings discussed in section 6: Other Supporting Facts. Were these cost and time savings not possible through this contract action, there are no other known barriers that would restrict consideration before any subsequent acquisition for the supplies or services would be made. The next contract action for this requirement will be competed amongst the combined follow-on Combating WMD (CWMD) Research and Development (RD) IDIQ awardees which is anticipated to be awarded in late 2013.
Tecbnical Certification I certify that the data and infonnation forming the basis for this justification arc accurate and complete to the best of my knowledge and belief.
Project Manager Date
Contracting Officer Certification and Determination
I certify that this justification is accurate and complete to the best of my knowledge and belief.
Additionally, I detennine that the order represents the best value consistent with Federal Acquisition Regulations.
Contracting Officer Date
File details come from the government source that posted it. Updated .