Repair of J85-GE-5/-21 Management of Items Subject to Repair (MISTR) Components
Solicitation number
FA8122-21-R-0009
Issued by

About this file

This document is a pre-solicitation synopsis for repair services of J85-GE-5/-21 Management of Items Subject to Repair (MISTR) components. The United States Air Force through the Air Force Sustainment Center at the Oklahoma City Logistics Center is contemplating a ten-year firm fixed price requirements contract with a five-year basic period and five one-year options for repair and overhaul services of internal engine components and assemblies. The solicitation number is FA8122-21-R-0009 with an estimated issue date of November 14, 2021 and close date of January 14, 2022. The incumbent contractor is the only approved source and the acquisition will be competed on an other than full and open basis. The synopsis includes estimated quantities, national stock numbers, part numbers, and delivery schedules for 32 line items covering services such as non-recurring engineering, labor wrap rates, material handling wrap rates, and repair of components including nozzles, frames, cases, seals and pumps.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This is a pre-solicitation notice. No proposals will be accepted until the request for proposal is posted.

The United States Air Force through the Air Force Sustainment Center (AFSC) at the Oklahoma City Logistics Center (OC-ALC) is contemplating procuring Repair of J85-GE-5/-21 Management of Items Subject to Repair (MISTR) Components. The Line Items cited below is for a non-commercial, Firm Fixed Price (FFP), Ten-Year Fixed Price, Non- Commercial Requirements Type Contract with Five-Year Basic Contract and Five, 1-year option considerations. This requirement is anticipated to be sole source.

Synopsis

1. Estimated issue date is 11/14/21. Estimated Close date 1/14/22, 3pm CST.

2. RFP# - FA8122-21-R-0009

3. PR# - FD20302001876

4. Nomenclature/Noun – J85-GE-5/-21 Management of Items Subject to Repair (MISTR) Components

5. NSN – Please Refer to Appendix I

6. PN – Please Refer to Appendix I

7. Application (Engine or Aircraft) – J85 Engine

8. RMC– R1/C, R1/V, R2/C

9. History – Last buy 25 JAN 2017, FA8122-17-D-0001

10. Description: This requirement is to provide repair/overhaul services for the J85-GE-5/21 MISTR components. These propulsion items are internal components and assemblies made of high strength steel alloys, castings and forgings, and flight control and accessory assemblies (main fuel control, afterburner fuel control, main fuel pump, afterburner fuel pump, and variable exhaust nozzle power unit) for the J85 engine. This requirement will provide performance based services with technical, logistics management and repair requirements for the return of un-serviceable J85 components to a serviceable condition.

Ten-Year Fixed Price Non- Commercial Requirements Type Contract is contemplated. A five-year basic, with five one-year options. Please refer to Appendix I for CLIN, NSN breakdown and Required Delivery.

This acquisition will be competed as other than Full and Open Competition due to only one approved source.

11. Mandatory Language: N/A

12. Export Control: No

13. Buyer: Courteney Schultz Contracting Officer: Tran Tran courteney.schultz@us.af.mil Tran.tran.1@us.af.mil

14. IUID Note to Contractor: If unit price exceeds $5,000.00 then UID requirements will apply.

mailto:courteney.schultz@us.af.mil mailto:Tran.tran.1@us.af.mil

15. Place of Contract Performance: Contractor’s facility

ALL SYNOPSES:

An Ombudsman has been appointed to hear concerns from offeror’s or potential offeror’s during the proposal development phase of this acquisition. The purpose of the Ombudsman is not to diminish the authority of the program director or contracting officer, but to communicate contractor concerns, issues, disagreements, and recommendations to the appropriate government personnel. When requested, the Ombudsman will maintain strict confidentiality as to source of the concern. The Ombudsman does not participate in the evaluation of proposals or in the source selection process. Interested parties are invited to call the Ombudsman at 405-736-3273. DO NOT CALL THIS NUMBER FOR SOLICITATION

REQUESTS.

SOLE SOURCE NOTES:

The proposed contract action is for supplies and services for which the Government intends to solicit and negotiate with only one, or a limited number of sources under the authority of FAR 6.302. Interested persons may identify their interest and capability to respond to the requirement or submit proposals. This notice of intent is not a request for noncompetitive proposals. However, all proposals received within forty five-days (thirty days if award is issued under an existing basic ordering agreement) after date of publication of this synopsis will be considered by the Government. A Determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. Authority is 10 USC 2304 (c) (1).

Appendix I

This estimate is not a representation to an offeror or contractor that the estimated quantity will be required or ordered, or that conditions affecting requirements will be stable or normal. All estimates are Best Estimated Quantities (BEQ).

PR Line Item - 0001 - Non-Recurring Engineering

YEAR BEQ ESTIMATED DATES

BASIC I N/A 23 JULY 2022 - 22 JULY

BASIC II N/A 23 JULY 2023 - 22 JULY

BASIC III N/A 23 JULY 2024 - 22 JULY

BASIC IV N/A 23 JULY 2025 - 22 JULY

BASIC V N/A 23 JULY 2026 - 22 JULY

OPTION I N/A 23 JULY 2027 - 22 JULY

OPTION II N/A 23 JULY 2028 - 22 JULY

OPTION III N/A 23 JULY 2029 - 22 JULY

OPTION IV N/A 23 JULY 2030 - 22 JULY

OPTION V N/A 23 JULY 2031 - 22 JULY

PR Line Item - 0002 - Over and Above USAF Labor Wrap Rate

YEAR BEQ ESTIMATED DATES

BASIC I N/A 23 JULY 2022 - 22 JULY

BASIC II N/A 23 JULY 2023 - 22 JULY

BASIC III N/A 23 JULY 2024 - 22 JULY

BASIC IV N/A 23 JULY 2025 - 22 JULY

BASIC V N/A 23 JULY 2026 - 22 JULY

OPTION I N/A 23 JULY 2027 - 22 JULY

OPTION II N/A 23 JULY 2028 - 22 JULY

OPTION III N/A 23 JULY 2029 - 22 JULY

OPTION IV N/A 23 JULY 2030 - 22 JULY

PR Line Item - 0003 - Over and Above USN Labor Wrap Rate

BASIC I N/A 23 JULY 2022 - 22 JULY

BASIC II N/A 23 JULY 2023 - 22 JULY

BASIC III N/A 23 JULY 2024 - 22 JULY

BASIC IV N/A 23 JULY 2025 - 22 JULY

BASIC V N/A 23 JULY 2026 - 22 JULY

OPTION I N/A 23 JULY 2027 - 22 JULY

OPTION II N/A 23 JULY 2028 - 22 JULY

OPTION III N/A 23 JULY 2029 - 22 JULY

OPTION IV N/A 23 JULY 2030 - 22 JULY

PR Line Item - 0004 - Over and Above USAF Material Handling Wrap Rate

YEAR BEQ ESTIMATED DATES

BASIC I N/A 23 JULY 2022 - 22 JULY

BASIC II N/A 23 JULY 2023 - 22 JULY

BASIC III N/A 23 JULY 2024 - 22 JULY

BASIC IV N/A 23 JULY 2025 - 22 JULY

BASIC V N/A 23 JULY 2026 - 22 JULY

OPTION I N/A 23 JULY 2027 - 22 JULY

OPTION II N/A 23 JULY 2028 - 22 JULY

OPTION III N/A 23 JULY 2029 - 22 JULY

OPTION IV N/A 23 JULY 2030 - 22 JULY

PR Line Item - 0005 - Over and Above USN Material Handling Wrap Rate

YEAR BEQ ESTIMATED DATES

BASIC I N/A 23 JULY 2022 - 22 JULY

BASIC II N/A 23 JULY 2023 - 22 JULY

BASIC III N/A 23 JULY 2024 - 22 JULY

BASIC IV N/A 23 JULY 2025 - 22 JULY

BASIC V N/A 23 JULY 2026 - 22 JULY

OPTION I N/A 23 JULY 2027 - 22 JULY

OPTION II N/A 23 JULY 2028 - 22 JULY

OPTION III N/A 23 JULY 2029 - 22 JULY

OPTION IV N/A 23 JULY 2030 - 22 JULY

PR Line Item - 0007 Repair of NSN: 2840-01-486- Noun: Rear Spool

PN: 5126T37P03

Item description and function: Part of the compressor section to supply compressed air in large masses to the combustion section.

YEAR BEQ ESTIMATED DATES

BASIC I 4 23 JULY 2022 - 22 JULY

PR Line Item - 0006 - Data PR Line Item 0006 is Data Requirements which is not separately priced.

BASIC II 5 23 JULY 2023 - 22 JULY

BASIC III 5 23 JULY 2024 - 22 JULY

BASIC IV 4 23 JULY 2025 - 22 JULY

BASIC V 4 23 JULY 2026 - 22 JULY

OPTION I 4 23 JULY 2027 - 22 JULY

OPTION II 4 23 JULY 2028 - 22 JULY

OPTION III 4 23 JULY 2029 - 22 JULY

OPTION IV 4 23 JULY 2030 - 22 JULY

OPTION V 4 23 JULY 2031 - 22 JULY

Delivery or Performance Period Requirements First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-day transition phase-in. All subsequent orders will be after receipt of order or reparable, whichever is later.

PR Line Item - 0008 Repair of NSN: 2840-00-868- Noun: Front Frame

PN: 6000T94G01

Item description and function: The main function of the engine is to admit air to the compressor section and to direct the flow of air onto the first stage compressor rotor blades.

YEAR BEQ ESTIMATED DATES

BASIC I 89 23 JULY 2022 - 22 JULY

BASIC II 86 23 JULY 2023 - 22 JULY

BASIC III 84 23 JULY 2024 - 22 JULY

BASIC IV 77 23 JULY 2025 - 22 JULY

BASIC V 78 23 JULY 2026 - 22 JULY

OPTION I 83 23 JULY 2027 - 22 JULY

OPTION II 83 23 JULY 2028 - 22 JULY

OPTION III 83 23 JULY 2029 - 22 JULY

OPTION IV 83 23 JULY 2030 - 22 JULY

OPTION V 83 23 JULY 2031 - 22 JULY

First 40% of the CLIN quantity due 60 Days* Second 30% of the CLIN quantity due 80 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0009 Repair of NSN: 3040-00-011- Noun: Housing, Mechanical

PN: 175R122P9

Item description and function: A driver shaft gear bearing (9) and a housing assembly support the forward end of the shaft gear where it enters the PTO housing.

YEAR BEQ ESTIMATED DATES

BASIC I 36 23 JULY 2022 - 22 JULY

BASIC II 31 23 JULY 2023 - 22 JULY

BASIC III 32 23 JULY 2024 - 22 JULY

BASIC IV 31 23 JULY 2025 - 22 JULY

BASIC V 32 23 JULY 2026 - 22 JULY

OPTION I 32 23 JULY 2027 - 22 JULY

OPTION II 32 23 JULY 2028 - 22 JULY

OPTION III 32 23 JULY 2029 - 22 JULY

OPTION IV 32 23 JULY 2030 - 22 JULY

OPTION V 32 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0010 Repair of NSN: 2840-01-294- Noun: Gearbox, Accessory

PN: 6003T95G07

Item description and function: The accessory drive gearbox is mounted beneath the mainframe. There are 7 mounting pads on the gearbox casing. Six of the pads are used to mount accessories, and the seventh pad is the gearbox-to-mainframe power input mount.

YEAR BEQ ESTIMATED DATES

BASIC I 39 23 JULY 2022 - 22 JULY

BASIC II 31 23 JULY 2023 - 22 JULY

BASIC III 33 23 JULY 2024 - 22 JULY

BASIC IV 30 23 JULY 2025 - 22 JULY

BASIC V 30 23 JULY 2026 - 22 JULY

OPTION I 33 23 JULY 2027 - 22 JULY

OPTION II 33 23 JULY 2028 - 22 JULY

OPTION III 33 23 JULY 2029 - 22 JULY

OPTION IV 33 23 JULY 2030 - 22 JULY

OPTION V 33 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 80 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0011 Repair of NSN: 2840-00-110- Noun: Cover Assy, Gearbox

PN: 37R601155P139

Item description and function: Part of the accessory gearbox assembly.

YEAR BEQ ESTIMATED DATES

BASIC I 47 23 JULY 2022 - 22 JULY

BASIC II 51 23 JULY 2023 - 22 JULY

BASIC III 45 23 JULY 2024 - 22 JULY

BASIC IV 37 23 JULY 2025 - 22 JULY

BASIC V 37 23 JULY 2026 - 22 JULY

OPTION I 43 23 JULY 2027 - 22 JULY

OPTION II 43 23 JULY 2028 - 22 JULY

OPTION III 43 23 JULY 2029 - 22 JULY

OPTION IV 43 23 JULY 2030 - 22 JULY

OPTION V 43 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0012 Repair of NSN: 2840-00-795- Noun: Housing, Gearbox,Tur

PN: 37R601155P104

Item description and function: Part of the accessory gearbox assembly.

YEAR BEQ ESTIMATED DATES

BASIC I 49 23 JULY 2022 - 22 JULY

BASIC II 50 23 JULY 2023 - 22 JULY

BASIC III 47 23 JULY 2024 - 22 JULY

BASIC IV 48 23 JULY 2025 - 22 JULY

BASIC V 45 23 JULY 2026 - 22 JULY

OPTION I 48 23 JULY 2027 - 22 JULY

OPTION II 48 23 JULY 2028 - 22 JULY

OPTION III 48 23 JULY 2029 - 22 JULY

OPTION IV 48 23 JULY 2030 - 22 JULY

OPTION V 48 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0013 Repair of NSN: 2840-01-284- Noun: Nozzle Assembly,Tur

PN: 6041T41G15

Item description and function: The Stage 1 turbine nozzle (8) consists of an outer band and an inner band joined by hollowed partitions.

YEAR BEQ ESTIMATED DATES

BASIC I 114 23 JULY 2022 - 22 JULY

BASIC II 118 23 JULY 2023 - 22 JULY

BASIC III 111 23 JULY 2024 - 22 JULY

BASIC IV 103 23 JULY 2025 - 22 JULY

BASIC V 104 23 JULY 2026 - 22 JULY

OPTION I 110 23 JULY 2027 - 22 JULY

OPTION II 110 23 JULY 2028 - 22 JULY

OPTION III 110 23 JULY 2029 - 22 JULY

OPTION IV 110 23 JULY 2030 - 22 JULY

OPTION V 110 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 80 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0014 Repair of NSN: 2840-01-286- Noun: Nozzle, Turbine, Stage 2

PN: 6051T51G01

Item description and function: The split Stage 2 turbine nozzle consists of an outer support band and an outer band joined to an inner band by welded partitions.

YEAR BEQ ESTIMATED DATES

BASIC I 425 23 JULY 2022 - 22 JULY

BASIC II 418 23 JULY 2023 - 22 JULY

BASIC III 412 23 JULY 2024 - 22 JULY

BASIC IV 381 23 JULY 2025 - 22 JULY

BASIC V 383 23 JULY 2026 - 22 JULY

OPTION I 404 23 JULY 2027 - 22 JULY

OPTION II 404 23 JULY 2028 - 22 JULY

OPTION III 404 23 JULY 2029 - 22 JULY

OPTION IV 404 23 JULY 2030 - 22 JULY

OPTION V 404 23 JULY 2031 - 22 JULY

First 40% of the CLIN quantity due 70 Days* Second 30% of the CLIN quantity due 90 Days* Remaining 30% of the CLIN quantity due 105 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0015 Repair of NSN: 2840-01-176- Noun: Case,Diffuser,Aircr

PN: 6029T59G02

Item description and function: The diffuser assembly is that portion of the afterburner in which exhaust gases from the turbine are mixed with additional fuel and ignited.

YEAR BEQ ESTIMATED DATES

BASIC I 27 23 JULY 2022 - 22 JULY

BASIC II 33 23 JULY 2023 - 22 JULY

BASIC III 34 23 JULY 2024 - 22 JULY

BASIC IV 35 23 JULY 2025 - 22 JULY

BASIC V 33 23 JULY 2026 - 22 JULY

OPTION I 32 23 JULY 2027 - 22 JULY

OPTION II 32 23 JULY 2028 - 22 JULY

OPTION III 32 23 JULY 2029 - 22 JULY

OPTION IV 32 23 JULY 2030 - 22 JULY

OPTION V 32 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0016 Repair of NSN: 2840-01-490- Noun: Casing Assembly Afterburner

PN: 5125T85G01

Item description and function: The afterburner casing and liner assembly provides the area necessary for the complete combustion of the exhaust gas-fuel mixture before it is ejected through the exhaust nozzle.

YEAR BEQ ESTIMATED DATES

BASIC I 1 23 JULY 2022 - 22 JULY

BASIC II 2 23 JULY 2023 - 22 JULY

BASIC III 2 23 JULY 2024 - 22 JULY

BASIC IV 2 23 JULY 2025 - 22 JULY

BASIC V 2 23 JULY 2026 - 22 JULY

OPTION I 2 23 JULY 2027 - 22 JULY

OPTION II 2 23 JULY 2028 - 22 JULY

OPTION III 2 23 JULY 2029 - 22 JULY

OPTION IV 2 23 JULY 2030 - 22 JULY

OPTION V 2 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0017 Repair of NSN: 2840-01-245- Noun: Stack Ring Liner Af

PN: 6041T18G04

Item description and function: The afterburner casing and liner assembly provides the area necessary for the complete combustion of the exhaust gas-fuel mixture before it is ejected through the exhaust nozzle.

YEAR BEQ ESTIMATED DATES

BASIC I 61 23 JULY 2022 - 22 JULY

BASIC II 32 23 JULY 2023 - 22 JULY

BASIC III 31 23 JULY 2024 - 22 JULY

BASIC IV 30 23 JULY 2025 - 22 JULY

BASIC V 30 23 JULY 2026 - 22 JULY

OPTION I 37 23 JULY 2027 - 22 JULY

OPTION II 37 23 JULY 2028 - 22 JULY

OPTION III 37 23 JULY 2029 - 22 JULY

OPTION IV 37 23 JULY 2030 - 22 JULY

OPTION V 37 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0018 Repair of NSN: 2840-01-231- Noun: Flameholder, Afterburner

PN: 6005T64P40

Item description and function: Functions as a pilot burner, maintains the flame front in position that assures complete combustion of the exhaust gas-fuel mixture in the afterburner.

YEAR BEQ ESTIMATED DATES

BASIC I 30 23 JULY 2022 - 22 JULY

BASIC II 29 23 JULY 2023 - 22 JULY

BASIC III 28 23 JULY 2024 - 22 JULY

BASIC IV 28 23 JULY 2025 - 22 JULY

BASIC V 28 23 JULY 2026 - 22 JULY

OPTION I 29 23 JULY 2027 - 22 JULY

OPTION II 29 23 JULY 2028 - 22 JULY

OPTION III 29 23 JULY 2029 - 22 JULY

OPTION IV 29 23 JULY 2030 - 22 JULY

OPTION V 29 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0019 Repair of NSN: 2840-01-077- Noun: Tank, Lubricating Oil

PN: 6003T12P03

Item description and function: The oil tank is a hydro-formed aluminum fabrication and is mounted on aft flange of lube and scavenge pump.

YEAR BEQ ESTIMATED DATES

BASIC I 70 23 JULY 2022 - 22 JULY

BASIC II 66 23 JULY 2023 - 22 JULY

BASIC III 59 23 JULY 2024 - 22 JULY

BASIC IV 58 23 JULY 2025 - 22 JULY

BASIC V 58 23 JULY 2026 - 22 JULY

OPTION I 62 23 JULY 2027 - 22 JULY

OPTION II 62 23 JULY 2028 - 22 JULY

OPTION III 62 23 JULY 2029 - 22 JULY

OPTION IV 62 23 JULY 2030 - 22 JULY

OPTION V 62 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0020 Repair of NSN: 2915-00-106-5464 (AF) Noun: Nozzle, Fuel Injecti

PN: 37D401657P111

Item description and function: Twelve fuel nozzles, mounted on mainframe, spray atomized fuel into combustion chamber. The fuel nozzle incorporates a flow-divider, a primary and secondary flow passage, and an air shrouded spin-chamber type orifice. During starting, low-pressure fuel in the primary passage is sprayed to the igniter tip for ignition.

YEAR BEQ ESTIMATED DATES

BASIC I 698 23 JULY 2022 - 22 JULY

BASIC II 313 23 JULY 2023 - 22 JULY

BASIC III 309 23 JULY 2024 - 22 JULY

BASIC IV 303 23 JULY 2025 - 22 JULY

BASIC V 304 23 JULY 2026 - 22 JULY

OPTION I 385 23 JULY 2027 - 22 JULY

OPTION II 385 23 JULY 2028 - 22 JULY

OPTION III 385 23 JULY 2029 - 22 JULY

OPTION IV 385 23 JULY 2030 - 22 JULY

OPTION V 385 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0021 Repair of NSN: 2915-01-538- Noun: Motor and Cam Assy

PN: 4016T79P02

Item description and function: Through linkage in AB control, the motor rotation will move hydraulic servoflapper. The flapper movement causes nozzle opening to change in direction that will correct existing difference between reference and thermocouple indication. If engine temperature measured by harness is higher than reference, the action is to open the nozzle.

YEAR BEQ ESTIMATED DATES

BASIC I 12 23 JULY 2022 - 22 JULY

BASIC II 12 23 JULY 2023 - 22 JULY

BASIC III 13 23 JULY 2024 - 22 JULY

BASIC IV 11 23 JULY 2025 - 22 JULY

BASIC V 11 23 JULY 2026 - 22 JULY

OPTION I 12 23 JULY 2027 - 22 JULY

OPTION II 12 23 JULY 2028 - 22 JULY

OPTION III 12 23 JULY 2029 - 22 JULY

OPTION IV 12 23 JULY 2030 - 22 JULY

OPTION V 12 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0022 Repair of NSN: 2915-00-875- Noun: Drain Valve, Afterbu

PN: 37D401691G002

Item description and function: The afterburner manifold drain valve removes fuel from the main and pilot spraybar fuel manifolds when the engine is shut down to prevent post-shutdown fires.

YEAR BEQ ESTIMATED DATES

BASIC I 48 23 JULY 2022 - 22 JULY

BASIC II 51 23 JULY 2023 - 22 JULY

BASIC III 46 23 JULY 2024 - 22 JULY

BASIC IV 41 23 JULY 2025 - 22 JULY

BASIC V 45 23 JULY 2026 - 22 JULY

OPTION I 46 23 JULY 2027 - 22 JULY

OPTION II 46 23 JULY 2028 - 22 JULY

OPTION III 46 23 JULY 2029 - 22 JULY

OPTION IV 46 23 JULY 2030 - 22 JULY

OPTION V 46 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0023 Repair of NSN: 2915-00-896- Noun: Valve, Fuel Pressuri

PN: 37C301344G002

Item description and function: The main fuel pressurizing and drain valve ensures proper fuel pressure to operate both the main fuel control servos and variable geometry actuators during starting and other low-flow operating conditions. It also drains fuel from fuel manifold and associated piping upon engine shutdown.

YEAR BEQ ESTIMATED DATES

BASIC I 45 23 JULY 2022 - 22 JULY

BASIC II 44 23 JULY 2023 - 22 JULY

BASIC III 43 23 JULY 2024 - 22 JULY

BASIC IV 40 23 JULY 2025 - 22 JULY

BASIC V 41 23 JULY 2026 - 22 JULY

OPTION I 43 23 JULY 2027 - 22 JULY

OPTION II 43 23 JULY 2028 - 22 JULY

OPTION III 43 23 JULY 2029 - 22 JULY

OPTION IV 43 23 JULY 2030 - 22 JULY

OPTION V 43 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 80 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0024 Repair of NSN: 2915-00-909- Noun: Spraybar, Main

PN: 37D401750P104

Item description and function: The Main Spraybar sprays directly into the four flameholder air scoops.

YEAR BEQ ESTIMATED DATES

BASIC I 434 23 JULY 2022 - 22 JULY

BASIC II 436 23 JULY 2023 - 22 JULY

BASIC III 431 23 JULY 2024 - 22 JULY

BASIC IV 422 23 JULY 2025 - 22 JULY

BASIC V 424 23 JULY 2026 - 22 JULY

OPTION I 429 23 JULY 2027 - 22 JULY

OPTION II 429 23 JULY 2028 - 22 JULY

OPTION III 429 23 JULY 2029 - 22 JULY

OPTION IV 429 23 JULY 2030 - 22 JULY

OPTION V 429 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0025 Repair of NSN: 2915-00-782- Noun: Spraybar, Pilot Afte

PN: 5011T29P01

Item description and function: The Pilot Spraybar sprays the fuel in a circumferential direction just downstream of the forward end of the flameholder air scoops.

YEAR BEQ ESTIMATED DATES

BASIC I 263 23 JULY 2022 - 22 JULY

BASIC II 126 23 JULY 2023 - 22 JULY

BASIC III 120 23 JULY 2024 - 22 JULY

BASIC IV 117 23 JULY 2025 - 22 JULY

BASIC V 118 23 JULY 2026 - 22 JULY

OPTION I 149 23 JULY 2027 - 22 JULY

OPTION II 149 23 JULY 2028 - 22 JULY

OPTION III 149 23 JULY 2029 - 22 JULY

OPTION IV 149 23 JULY 2030 - 22 JULY

OPTION V 149 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0026 Repair of NSN: 2915-01-145- Noun: Isochronous Governor Assy

PN: 5053T27P01

Item description and function: The over speed governor is in series with main fuel control. Its purpose in the control system is to override main fuel control in event engine over speeds.

YEAR BEQ ESTIMATED DATES

BASIC I 110 23 JULY 2022 - 22 JULY

BASIC II 113 23 JULY 2023 - 22 JULY

BASIC III 108 23 JULY 2024 - 22 JULY

BASIC IV 100 23 JULY 2025 - 22 JULY

BASIC V 103 23 JULY 2026 - 22 JULY

OPTION I 107 23 JULY 2027 - 22 JULY

OPTION II 107 23 JULY 2028 - 22 JULY

OPTION III 107 23 JULY 2029 - 22 JULY

OPTION IV 107 23 JULY 2030 - 22 JULY

OPTION V 107 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0027 Repair of NSN: 2935-00-857- Noun: Cooler, Lubricating

PN: 37D401061P107

Item description and function: The oil cooler is a liquid-to-liquid type heat exchanger mounted on the oil tank mounting flange and against right-hand side of oil tank. It consists of numerous longitudinal passages arranged in a honeycomb pattern. Simultaneously, fuel and oil flow through adjoining passages and an exchange of heat occurs between hot engine oil and cool fuel. Oil enters and leaves the cooler through ports located in housing for pressure bypass valve. When pressure across valve exceeds 20 ± 4 psi due to clogging, the valve will open and the oil will bypass the heat exchanging elements.

YEAR BEQ ESTIMATED DATES

BASIC I 1 23 JULY 2022 - 22 JULY

BASIC II 1 23 JULY 2023 - 22 JULY

BASIC III 1 23 JULY 2024 - 22 JULY

BASIC IV 1 23 JULY 2025 - 22 JULY

BASIC V 1 23 JULY 2026 - 22 JULY

OPTION I 1 23 JULY 2027 - 22 JULY

OPTION II 1 23 JULY 2028 - 22 JULY

OPTION III 1 23 JULY 2029 - 22 JULY

OPTION IV 1 23 JULY 2030 - 22 JULY

OPTION V 1 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0028 Repair of NSN: 2935-00-932- Noun: Cooler, Lubricating

PN: 37D401061P105

Item description and function: The oil cooler is a liquid-to-liquid type heat exchanger mounted on the oil tank mounting flange and against right-hand side of oil tank. It consists of numerous longitudinal passages arranged in a honeycomb pattern. Simultaneously, fuel and oil flow through adjoining passages and an exchange of heat occurs between hot engine oil and cool fuel. Oil enters and leaves the cooler through ports located in housing for pressure bypass valve. When pressure across valve exceeds 20 ± 4 psi due to clogging, the valve will open and the oil will bypass the heat exchanging elements.

YEAR BEQ ESTIMATED DATES

BASIC I 1 23 JULY 2022 - 22 JULY

BASIC II 1 23 JULY 2023 - 22 JULY

BASIC III 1 23 JULY 2024 - 22 JULY

BASIC IV 1 23 JULY 2025 - 22 JULY

BASIC V 1 23 JULY 2026 - 22 JULY

OPTION I 1 23 JULY 2027 - 22 JULY

OPTION II 1 23 JULY 2028 - 22 JULY

OPTION III 1 23 JULY 2029 - 22 JULY

OPTION IV 1 23 JULY 2030 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0029 Repair of NSN: 3010-00-911- Noun: Varbl Geo Actuator Arm

PN: 7257-3P02/5002T48P02 & 7257-3P01/5002T48P01

Item description and function: The variable geometry actuators position the inlet guide vanes and compressor bleed valves as scheduled by a signal from the main fuel control.

YEAR BEQ ESTIMATED DATES

BASIC I 43 23 JULY 2022 - 22 JULY

BASIC II 42 23 JULY 2023 - 22 JULY

BASIC III 46 23 JULY 2024 - 22 JULY

BASIC IV 35 23 JULY 2025 - 22 JULY

BASIC V 42 23 JULY 2026 - 22 JULY

OPTION I 42 23 JULY 2027 - 22 JULY

OPTION II 42 23 JULY 2028 - 22 JULY

OPTION III 42 23 JULY 2029 - 22 JULY

OPTION IV 42 23 JULY 2030 - 22 JULY

OPTION V 42 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0030 Repair of NSN: 2995-01-007- Noun: Ven Actuator

PN: 5014T92P01/895249

Item description and function: The actuators are driven by the flexible shafts attached at one end to the actuators and the other end to the power unit.

YEAR BEQ ESTIMATED DATES

BASIC I 42 23 JULY 2022 - 22 JULY

BASIC II 41 23 JULY 2023 - 22 JULY

BASIC III 40 23 JULY 2024 - 22 JULY

BASIC IV 36 23 JULY 2025 - 22 JULY

BASIC V 37 23 JULY 2026 - 22 JULY

OPTION I 39 23 JULY 2027 - 22 JULY

OPTION II 39 23 JULY 2028 - 22 JULY

OPTION III 39 23 JULY 2029 - 22 JULY

OPTION IV 39 23 JULY 2030 - 22 JULY

OPTION V 39 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0031 Repair of NSN: 2915-00-871- Noun: Power Driven Rotary Pump

PN: 6009T83P02/RR16500A23

Item description and function: The pressure element of lube pump pumps oil from tank, through oil cooler, through oil filter, and into accessory drive gearbox.

YEAR BEQ ESTIMATED DATES

BASIC I 82 23 JULY 2022 - 22 JULY

BASIC II 84 23 JULY 2023 - 22 JULY

BASIC III 82 23 JULY 2024 - 22 JULY

BASIC IV 76 23 JULY 2025 - 22 JULY

BASIC V 77 23 JULY 2026 - 22 JULY

OPTION I 80 23 JULY 2027 - 22 JULY

OPTION II 80 23 JULY 2028 - 22 JULY

OPTION III 80 23 JULY 2029 - 22 JULY

OPTION IV 80 23 JULY 2030 - 22 JULY

OPTION V 80 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0032 Repair of NSN: 4820-01-341- Noun: Bleed Valve

PN: 37E501502P113X

Item description and function: A bleed valve is mounted on each side of the compressor stator casing. During transient engine speeds, the bleed valves bleed air from the compressor according to a bleed schedule.

YEAR BEQ ESTIMATED DATES

BASIC I 1 23 JULY 2022 - 22 JULY

BASIC II 1 23 JULY 2023 - 22 JULY

BASIC III 1 23 JULY 2024 - 22 JULY

BASIC IV 1 23 JULY 2025 - 22 JULY

BASIC V 1 23 JULY 2026 - 22 JULY

OPTION I 1 23 JULY 2027 - 22 JULY

OPTION II 1 23 JULY 2028 - 22 JULY

OPTION III 1 23 JULY 2029 - 22 JULY

OPTION IV 1 23 JULY 2030 - 22 JULY

Second 30% of the CLIN quantity due 80 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0033 Repair of NSN: 4820-00-710- Noun: Upstream Case

PN: 378A11

Item description and function: Part of the bleed valve assembly.

YEAR BEQ ESTIMATED DATES

BASIC I 1 23 JULY 2022 - 22 JULY

BASIC II 1 23 JULY 2023 - 22 JULY

BASIC III 1 23 JULY 2024 - 22 JULY

BASIC IV 1 23 JULY 2025 - 22 JULY

BASIC V 1 23 JULY 2026 - 22 JULY

OPTION I 1 23 JULY 2027 - 22 JULY

OPTION II 1 23 JULY 2028 - 22 JULY

OPTION III 1 23 JULY 2029 - 22 JULY

OPTION IV 1 23 JULY 2030 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0034 Repair of NSN: 4820-00-710- Noun: Downstream Case

PN: 378A10

Item description and function: Part of the bleed valve assembly.

YEAR BEQ ESTIMATED DATES

BASIC I 1 23 JULY 2022 - 22 JULY

BASIC II 1 23 JULY 2023 - 22 JULY

BASIC III 1 23 JULY 2024 - 22 JULY

BASIC IV 1 23 JULY 2025 - 22 JULY

BASIC V 1 23 JULY 2026 - 22 JULY

OPTION I 1 23 JULY 2027 - 22 JULY

OPTION II 1 23 JULY 2028 - 22 JULY

OPTION III 1 23 JULY 2029 - 22 JULY

OPTION IV 1 23 JULY 2030 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0035 Repair of NSN: 2915-01-572- Noun: AB Fuel Pump

PN: 37D401294P110/ABP105-

5D

Item description and function: The afterburner fuel pump is mounted on forward left-hand pad of accessory drive gearbox. The pump, a single element centrifugal-type unit, supplies fuel for afterburner operation.

YEAR BEQ ESTIMATED DATES

BASIC I 108 23 JULY 2022 - 22 JULY

BASIC II 110 23 JULY 2023 - 22 JULY

BASIC III 104 23 JULY 2024 - 22 JULY

BASIC IV 96 23 JULY 2025 - 22 JULY

BASIC V 98 23 JULY 2026 - 22 JULY

OPTION I 103 23 JULY 2027 - 22 JULY

OPTION II 103 23 JULY 2028 - 22 JULY

OPTION III 103 23 JULY 2029 - 22 JULY

OPTION IV 103 23 JULY 2030 - 22 JULY

OPTION V 103 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0036 Repair of NSN: 2915-01-257-5403 (AF) Noun: Main Fuel Control

PN: 6001T78G09A

Item description and function: The main fuel control provides a means of selecting and regulating the power output of the basic engine and to maintain engine operation within an envelope of safe operating limits by performing the following specific functions: (1) Establishes maximum safe fuel limits for all operating conditions, including automatic starting. (2) Provides droop regulation of engine speed by metering fuel to combustion section. (3) Automatically alters fuel schedule to maintain desired power setting as operating temperatures and pressures change. (4) Regulates fuel flow to simultaneously position variable vanes and compressor bleed valves to a defined schedule during transient and steady-state operation. (5) Provides a proper minimum fuel flow for in-flight engine starting, and for prevention of combustion flameouts, due to lean fuel-air mixture, during deceleration. (6) Provides a positive fuel shut-off.

YEAR BEQ ESTIMATED DATES

BASIC I 209 23 JULY 2022 - 22 JULY

BASIC II 210 23 JULY 2023 - 22 JULY

BASIC III 206 23 JULY 2024 - 22 JULY

BASIC IV 192 23 JULY 2025 - 22 JULY

BASIC V 195 23 JULY 2026 - 22 JULY

OPTION I 202 23 JULY 2027 - 22 JULY

OPTION II 202 23 JULY 2028 - 22 JULY

OPTION III 202 23 JULY 2029 - 22 JULY

OPTION IV 202 23 JULY 2030 - 22 JULY

OPTION V 202 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0037 Repair of NSN: 2915-01-234- Noun: AB Fuel Control

PN: 6009T92G07A

Item description and function: As a function of power lever position and compressor discharge pressure, the afterburner fuel control schedules fuel to main afterburner and pilot burner spraybars. The control also regulates, as a function of power lever position, the variable exhaust nozzle area until it is overridden by turbine discharge (T5) control system. The afterburner fuel control, in conjunction with the T5 system, automatically controls turbine discharge temperature by adjusting nozzle area for desired operating temperature.

YEAR BEQ ESTIMATED DATES

BASIC I 167 23 JULY 2022 - 22 JULY

BASIC II 173 23 JULY 2023 - 22 JULY

BASIC III 160 23 JULY 2024 - 22 JULY

BASIC IV 151 23 JULY 2025 - 22 JULY

BASIC V 154 23 JULY 2026 - 22 JULY

OPTION I 161 23 JULY 2027 - 22 JULY

OPTION II 161 23 JULY 2028 - 22 JULY

OPTION III 161 23 JULY 2029 - 22 JULY

OPTION IV 161 23 JULY 2030 - 22 JULY

OPTION V 161 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0038 Repair of NSN: 4810-00-866- Noun: Anti-Icing Valve

PN: 37D401214P104/(123335-3)

Item description and function: The anti-icing valve, mounted on the front frame, controls the flow of compressor discharge air to the front frame. It is electrically energized from the aircraft cockpit (115V, 400 cps) when engine is at or above idle speed.

BASIC I 55 23 JULY 2022 - 22 JULY

BASIC II 55 23 JULY 2023 - 22 JULY

BASIC III 52 23 JULY 2024 - 22 JULY

BASIC IV 48 23 JULY 2025 - 22 JULY

BASIC V 49 23 JULY 2026 - 22 JULY

OPTION I 52 23 JULY 2027 - 22 JULY

OPTION II 52 23 JULY 2028 - 22 JULY

OPTION III 52 23 JULY 2029 - 22 JULY

OPTION IV 52 23 JULY 2030 - 22 JULY

OPTION V 52 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0039 Repair of NSN: 2995-01-437- Noun: Ven Power Unit

PN: 37D401335P112

Item description and function: The power unit is mechanically driven by the engine through the accessory drive gearbox. Rotation of the flexible shafts is accomplished by engaging the clutch in the power unit through an input linkage system. The amount of rotation of power unit and shafts is determined by the amount of motion of the input linkage. Internal feedback linkage in the power unit will un-clutch the unit when the amount of rotation that is called for by the input linkage has been obtained.

YEAR BEQ ESTIMATED DATES

BASIC I 120 23 JULY 2022 - 22 JULY

BASIC II 141 23 JULY 2023 - 22 JULY

BASIC III 133 23 JULY 2024 - 22 JULY

BASIC IV 124 23 JULY 2025 - 22 JULY

BASIC V 131 23 JULY 2026 - 22 JULY

OPTION I 130 23 JULY 2027 - 22 JULY

OPTION II 130 23 JULY 2028 - 22 JULY

OPTION III 130 23 JULY 2029 - 22 JULY

OPTION IV 130 23 JULY 2030 - 22 JULY

OPTION V 130 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0040 Repair of NSN: 2840-01-292-

Noun: Case, Augmentor, Airc

PN: 37C311084G009

Item description and function: The afterburner casing and liner assembly provides the area necessary for the complete combustion of the exhaust gas-fuel mixture before it is ejected through the exhaust nozzle.

YEAR BEQ ESTIMATED DATES

BASIC I 1 23 JULY 2022 - 22 JULY

BASIC II 1 23 JULY 2023 - 22 JULY

BASIC III 1 23 JULY 2024 - 22 JULY

BASIC IV 1 23 JULY 2025 - 22 JULY

BASIC V 1 23 JULY 2026 - 22 JULY

OPTION I 1 23 JULY 2027 - 22 JULY

OPTION II 1 23 JULY 2028 - 22 JULY

OPTION III 1 23 JULY 2029 - 22 JULY

OPTION IV 1 23 JULY 2030 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0041 Repair of NSN: 2840-01-035- Noun: Case, Compressor, Air

PN: 6029T29G03

Item description and function: The compressor casing is an annular Chromalloy component, split and flanged along the horizontal centerline and reinforced externally by integral stiffening ribs. The upper and lower halves are bolted together along the horizontal centerline.

YEAR BEQ ESTIMATED DATES

BASIC I 9 23 JULY 2022 - 22 JULY

BASIC II 6 23 JULY 2023 - 22 JULY

BASIC III 5 23 JULY 2024 - 22 JULY

BASIC IV 5 23 JULY 2025 - 22 JULY

BASIC V 5 23 JULY 2026 - 22 JULY

OPTION I 6 23 JULY 2027 - 22 JULY

OPTION II 6 23 JULY 2028 - 22 JULY

OPTION III 6 23 JULY 2029 - 22 JULY

OPTION IV 6 23 JULY 2030 - 22 JULY

OPTION V 6 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0042 Repair of NSN: 2840-01-488- Noun: Disk, Compressor, Air

PN: 5126T33P02

Item description and function: Part of the compressor section to supply compressed air in large masses to the combustion section.

YEAR BEQ ESTIMATED DATES

BASIC I 1 23 JULY 2022 - 22 JULY

BASIC II 1 23 JULY 2023 - 22 JULY

BASIC III 1 23 JULY 2024 - 22 JULY

BASIC IV 1 23 JULY 2025 - 22 JULY

BASIC V 1 23 JULY 2026 - 22 JULY

OPTION I 1 23 JULY 2027 - 22 JULY

OPTION II 1 23 JULY 2028 - 22 JULY

OPTION III 1 23 JULY 2029 - 22 JULY

OPTION IV 1 23 JULY 2030 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0043 Repair of NSN: 2995-01-118- Noun: Power, Takeoff, Engine

PN: 6003T50G32

Item description and function: The power takeoff drive assembly is located within the mainframe. Its purpose is to transmit power from the compressor rotor driveshaft to the engine accessories. This assembly consists of a housing which houses and supports the gears and their related components.

YEAR BEQ ESTIMATED DATES

BASIC I 1 23 JULY 2022 - 22 JULY

BASIC II 1 23 JULY 2023 - 22 JULY

BASIC III 1 23 JULY 2024 - 22 JULY

BASIC IV 1 23 JULY 2025 - 22 JULY

BASIC V 1 23 JULY 2026 - 22 JULY

OPTION I 1 23 JULY 2027 - 22 JULY

OPTION II 1 23 JULY 2028 - 22 JULY

OPTION III 1 23 JULY 2029 - 22 JULY

OPTION IV 1 23 JULY 2030 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0044 Repair of NSN: 2840-01-364- Noun: Rear Frame

PN: 6051T95G04

Item description and function: The mainframe components serve as the main structural support of the engine.

YEAR BEQ ESTIMATED DATES

BASIC I 1 23 JULY 2022 - 22 JULY

BASIC II 1 23 JULY 2023 - 22 JULY

BASIC III 1 23 JULY 2024 - 22 JULY

BASIC IV 1 23 JULY 2025 - 22 JULY

BASIC V 1 23 JULY 2026 - 22 JULY

OPTION I 1 23 JULY 2027 - 22 JULY

OPTION II 1 23 JULY 2028 - 22 JULY

OPTION III 1 23 JULY 2029 - 22 JULY

OPTION IV 1 23 JULY 2030 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0045 Repair of NSN: 2840-01-286- Noun: Vane Segment

PN: 4067T63G01

Item description and function: The individual stator vanes are brazed into outer support bands that are segmented into 12 equal sectors per stage. Each of the 7 stages of these sectors slide into circumferential tracks machined into the inside of the casing. The first and second-stage vanes are also brazed to inner bands or shrouds that are similarly segmented. The number of vanes mounted on a sector increases progressively from the Stages 1 through 8 as the vane size decreases. There are a total of 768 vanes mounted in the compressor casing. Two locking keys, one fitted to the splitline of the lower casing half at 9 o’clock and the other fitted to the splitline of the upper casing half at 3 o’clock prevents rotation of the stator sectors.

YEAR BEQ ESTIMATED DATES

BASIC I 1 23 JULY 2022 - 22 JULY

BASIC II 1 23 JULY 2023 - 22 JULY

BASIC III 1 23 JULY 2024 - 22 JULY

BASIC IV 1 23 JULY 2025 - 22 JULY

BASIC V 1 23 JULY 2026 - 22 JULY

OPTION I 1 23 JULY 2027 - 22 JULY

OPTION II 1 23 JULY 2028 - 22 JULY

OPTION III 1 23 JULY 2029 - 22 JULY

OPTION IV 1 23 JULY 2030 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0046 Repair of NSN: 2840-01-115- Noun: Liner, Augmentor Com

PN: 6003T65P14

Item description and function: The afterburner liner is a two-piece, slip-jointed cylindrical component with a convoluted surface to minimize the effects of thermal distortion.

YEAR BEQ ESTIMATED DATES

BASIC I 1 23 JULY 2022 - 22 JULY

BASIC II 1 23 JULY 2023 - 22 JULY

BASIC III 1 23 JULY 2024 - 22 JULY

BASIC IV 1 23 JULY 2025 - 22 JULY

BASIC V 1 23 JULY 2026 - 22 JULY

OPTION I 1 23 JULY 2027 - 22 JULY

OPTION II 1 23 JULY 2028 - 22 JULY

OPTION III 1 23 JULY 2029 - 22 JULY

OPTION IV 1 23 JULY 2030 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0047 Repair of NSN: 2840-00-908- Noun: Shaft, Comp Drive Rear

PN: 3008T43G01

Item description and function: The driveshaft has two sets of splines on the aft end. One of these splines turns the bevel driven shaft gear which in turn drives the radial driveshaft that powers the accessory gearbox. The other spline meshes with the turbine rotor. The driveshaft receives its power from the turbine rotor. The forward end of the driveshaft flares out to form a bell mouth.

YEAR BEQ ESTIMATED DATES

BASIC I 1 23 JULY 2022 - 22 JULY

BASIC II 1 23 JULY 2023 - 22 JULY

BASIC III 1 23 JULY 2024 - 22 JULY

BASIC IV 1 23 JULY 2025 - 22 JULY

BASIC V 1 23 JULY 2026 - 22 JULY

OPTION I 1 23 JULY 2027 - 22 JULY

OPTION II 1 23 JULY 2028 - 22 JULY

OPTION III 1 23 JULY 2029 - 22 JULY

OPTION IV 1 23 JULY 2030 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0048 Repair of NSN: 2840-01-115- Noun: Liner, Augmentor Com

PN: 6003T66P19

Item description and function: The afterburner liner is a two-piece, slip-jointed cylindrical component with a convoluted surface to minimize the effects of thermal distortion.

YEAR BEQ ESTIMATED DATES

BASIC I 1 23 JULY 2022 - 22 JULY

BASIC II 3 23 JULY 2023 - 22 JULY

BASIC III 6 23 JULY 2024 - 22 JULY

BASIC IV 4 23 JULY 2025 - 22 JULY

BASIC V 3 23 JULY 2026 - 22 JULY

OPTION I 3 23 JULY 2027 - 22 JULY

OPTION II 3 23 JULY 2028 - 22 JULY

OPTION III 3 23 JULY 2029 - 22 JULY

OPTION IV 3 23 JULY 2030 - 22 JULY

OPTION V 3 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0049 Repair of NSN: 2915-01-572-

Noun: Main Fuel Pump

PN: 6006T17P04/116995-01A1

Item description and function: The main fuel pump consists of a gearbox-driven, positive displacement, single element gear type high-pressure pumping element with an integral centrifugal boost pumping element. The boost element is located at fuel inlet port of pump housing. The boost element increases fuel pressure at inlet to high-pressure element and ensures proper fuel flow through fuel filter to prevent high-pressure element cavitation during operation at altitude.

YEAR BEQ ESTIMATED DATES

BASIC I 92 23 JULY 2022 - 22 JULY

BASIC II 124 23 JULY 2023 - 22 JULY

BASIC III 128 23 JULY 2024 - 22 JULY

BASIC IV 116 23 JULY 2025 - 22 JULY

BASIC V 116 23 JULY 2026 - 22 JULY

OPTION I 115 23 JULY 2027 - 22 JULY

OPTION II 115 23 JULY 2028 - 22 JULY

OPTION III 115 23 JULY 2029 - 22 JULY

OPTION IV 115 23 JULY 2030 - 22 JULY

OPTION V 115 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0050 Repair of NSN: 2915-00-483- Noun: Valve, Fuel Pressuri

PN: 3001T03G03

Item description and function: The Fuel Pressurizing and Drain (P&D) valve performs 2 functions during engine operation. It maintains a minimum fuel pressure in the fuel system for the operation of the main fuel control servos. It also drains the fuel manifolds at engine shutdown.

YEAR BEQ ESTIMATED DATES

BASIC I 1 23 JULY 2022 - 22 JULY

BASIC II 4 23 JULY 2023 - 22 JULY

BASIC III 4 23 JULY 2024 - 22 JULY

BASIC IV 4 23 JULY 2025 - 22 JULY

BASIC V 4 23 JULY 2026 - 22 JULY

OPTION I 3 23 JULY 2027 - 22 JULY

OPTION II 3 23 JULY 2028 - 22 JULY

OPTION III 3 23 JULY 2029 - 22 JULY

OPTION IV 3 23 JULY 2030 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0051 Repair of NSN: 2840-01-558- Noun: Frame, Front, Aircraf

PN: 6011T65G07

Item description and function: The front frame supports the forward end of the compressor rotor at the No. 1 roller bearing. It has variable vanes that help control the incoming airflow.

YEAR BEQ ESTIMATED DATES

BASIC I 3 23 JULY 2022 - 22 JULY

BASIC II 4 23 JULY 2023 - 22 JULY

BASIC III 3 23 JULY 2024 - 22 JULY

BASIC IV 3 23 JULY 2025 - 22 JULY

BASIC V 4 23 JULY 2026 - 22 JULY

OPTION I 3 23 JULY 2027 - 22 JULY

OPTION II 3 23 JULY 2028 - 22 JULY

OPTION III 3 23 JULY 2029 - 22 JULY

OPTION IV 3 23 JULY 2030 - 22 JULY

Second 30% of the CLIN quantity due 80 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0052 Repair of NSN: 2995-01-138-

Noun: Power Takeoff, Engin

PN: 6003T50G33

Item description and function: The function of the PTO drive assembly is to transmit drive power from the turbine section to the accessory gearbox.

YEAR BEQ ESTIMATED DATES

BASIC I 3 23 JULY 2022 - 22 JULY

BASIC II 0 23 JULY 2023 - 22 JULY

BASIC III 3 23 JULY 2024 - 22 JULY

BASIC IV 4 23 JULY 2025 - 22 JULY

BASIC V 4 23 JULY 2026 - 22 JULY

OPTION I 3 23 JULY 2027 - 22 JULY

OPTION II 3 23 JULY 2028 - 22 JULY

OPTION III 3 23 JULY 2029 - 22 JULY

OPTION IV 3 23 JULY 2030 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0053 Repair of NSN: 2840-01-632- Noun: Nozzle, Turbine, Stage 1

PN: 6029T45G14

Item description and function: The function of the Stage 1 turbine nozzle (3) is to allow the hot gases from the combustion liner to expand under controlled conditions and to direct the gas flow onto the Stage 1 turbine blades in a direction that will allow optimum energy by the turbine rotor.

YEAR BEQ ESTIMATED DATES

BASIC I 86 23 JULY 2022 - 22 JULY

BASIC II 48 23 JULY 2023 - 22 JULY

BASIC III 84 23 JULY 2024 - 22 JULY

BASIC IV 84 23 JULY 2025 - 22 JULY

BASIC V 84 23 JULY 2026 - 22 JULY

OPTION I 77 23 JULY 2027 - 22 JULY

OPTION II 77 23 JULY 2028 - 22 JULY

OPTION III 77 23 JULY 2029 - 22 JULY

OPTION IV 77 23 JULY 2030 - 22 JULY

OPTION V 77 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0054 Repair of NSN: 2840-01-114- Noun: Nozzle, Turbine, Stage 2

PN: 6009T46G08

Item description and function: The Stage 2 nozzle (2) redirects the hot gases, under controlled conditions, onto the Stage 2 turbine blades for additional energy extraction from the hot gas stream.

YEAR BEQ ESTIMATED DATES

BASIC I 18 23 JULY 2022 - 22 JULY

BASIC II 32 23 JULY 2023 - 22 JULY

BASIC III 32 23 JULY 2024 - 22 JULY

BASIC IV 32 23 JULY 2025 - 22 JULY

BASIC V 32 23 JULY 2026 - 22 JULY

OPTION I 29 23 JULY 2027 - 22 JULY

OPTION II 29 23 JULY 2028 - 22 JULY

OPTION III 29 23 JULY 2029 - 22 JULY

OPTION IV 29 23 JULY 2030 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0055 Repair of NSN: 2840-00-160- Noun: Housing Exhaust Nozzle

PN: 6007T17G03

Item description and function: The VEN assembly provides a controllable exit passage for the exhaust gas stream for controlling the exhaust gas temperature and engine pressure.

YEAR BEQ ESTIMATED DATES

BASIC I 18 23 JULY 2022 - 22 JULY

BASIC II 2 23 JULY 2023 - 22 JULY

BASIC III 16 23 JULY 2024 - 22 JULY

BASIC IV 16 23 JULY 2025 - 22 JULY

BASIC V 16 23 JULY 2026 - 22 JULY

OPTION I 14 23 JULY 2027 - 22 JULY

OPTION II 14 23 JULY 2028 - 22 JULY

OPTION III 14 23 JULY 2029 - 22 JULY

OPTION IV 14 23 JULY 2030 - 22 JULY

OPTION V 14 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0056 Repair of NSN: 2915-00-006- Noun: Governor Gasoline E

PN: 5000T66P10

Item description and function: The Over speed Governor (OSG) is a hydro mechanical, self-contained governing unit driven by, and mounted on, the accessory gearbox. Its purpose is to override the main fuel control in the event of an engine over speed. If an engine over speed occurs, the governor will limit engine speed to 105.0 ± 1.0% by bypassing excess fuel to the main fuel pump inlet for recirculation.

YEAR BEQ ESTIMATED DATES

BASIC I 5 23 JULY 2022 - 22 JULY

BASIC II 12 23 JULY 2023 - 22 JULY

BASIC III 12 23 JULY 2024 - 22 JULY

BASIC IV 12 23 JULY 2025 - 22 JULY

BASIC V 12 23 JULY 2026 - 22 JULY

OPTION I 11 23 JULY 2027 - 22 JULY

OPTION II 11 23 JULY 2028 - 22 JULY

OPTION III 11 23 JULY 2029 - 22 JULY

OPTION IV 11 23 JULY 2030 - 22 JULY

OPTION V 11 23 JULY 2031 - 22 JULY

Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days* *Delivery time for first order will begin at the end of the 90-

PR Line Item - 0057 Repair of NSN: 2915-01-017- Noun: Pump, Fuel, Jet Engin

PN: 5015T24P12

Item description and function: The main fuel pump consists of a gearbox-driven, positive displacement, single element gear type high-pressure pumping element with an integral centrifugal boost pumping element. The boost element is located at fuel inlet port of pump housing.

This is the start of the file's text. The full file is on GovTribe.