J3 - Project Plans.pdf
PDF 3 MB Posted
- Solicitation number
- 12445521Q0091
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST LOCATION
VICINITY MAP
SHEET OF
United States Department of Agriculture
Forest Service
FR 137-04.5 NORTH BRANCH SUGAR RUN
DIRECTIONS TO THE SITE FROM NEAREST TOWN/MAJOR INTERSECTION:
FROM THE INTERSECTION OF PA59 AND PA321SUGAR RUN ROAD (2 MILES EAST OF BRADFORD
RANGER STATION) TRAVEL NORTHWEST ON PA321 SUGAR RUN ROAD, FOLLOW FOR 6.44 MILES.
TURN RIGHT ONTO FOREST ROAD 271 AND FOLLOW 3.4 MILES TO FOREST ROAD 137. TURN LEFT ON
FR 137, PROJECT LOCATION APPROXIMATELY 1000 FT.
BRIDGE REHAB
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER
DATE
4/1 5/2
1 0 7:
A
JT
AY
LO
R
C:
\U
SE
RS
\A
JT
AY
LO
R\
DE
SK
TO
P\
-N
OR
TH
B
RA
NC
H
SU
GA
R
RU
N\ 1_
CA
D
MA
PS
R
AW
D
AT
A
PR
E
CO
NS
TR
UC
TI
ON
P
HO
TO
S\
FR
7 N
B R
SU
GA
R
RU
N
BR
R
EP
LA
CE
ME
NT
_V 4.D
W G;
PENNSYLVANIA
MCKEAN COUNTY
EASTERN REGION
ALLEGHENY NATIONAL FOREST
BRADFORD RANGER DISTRICT
INDEX OF SHEETS
SHEET SHEET TITLE DATE
1 COVERSHEET 4/13/2021
2 GENERAL NOTES & SCHEDULE OF ITEMS 4/15/2021
3 SIGN PLAN 3/29/2021
4 EXISTING STRUCTURE: REMOVAL PLAN 4/15/2021
5 PROPOSED STRUCTURE 4/15/2021
6 DETAILS 4/12/2021
BRADFORD RANGER DISTRICT
29 FOREST SERVICE DRIVE
BRADFORD, PA 16701
PROJECT LOCATION
STRUCTURE NUMBER: 091903000001013 LATTITUDE: 41.92065° LONGITUDE: -78.83817°
STRUCTURE DESCRIPTION:
22 FOOT (OVERALL LENGTH) SINGLE SPAN TIMBER PANEL-LAM, INSTALLED ON THE EXISTING
TIMBER ABUTMENTS.
DESIGN SPEED: 30 MPH
AADT: <200
DISTRICT RANGER DATE
FOREST SUPERVISOR DATE
RO BRIDGE PROGRAM MANAGER DATE
DIRECTOR OF ENGINEERING DATE
DESIGNED BY:
ENGINEER DATE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
1 0 7:
A
JT
AY
LO
R
C:
\U
SE
RS
\A
JT
AY
LO
R\
DE
SK
TO
P\
-N
OR
TH
B
RA
NC
H
SU
GA
R
RU
N\ 1_
CA
D
MA
PS
R
AW
D
AT
A
PR
E
CO
NS
TR
UC
TI
ON
P
HO
TO
S\
FR
7 N
B R
SU
GA
R
RU
N
BR
R
EP
LA
CE
ME
NT
_V 4.D
W G;
R9
EASTERN REGION
FR 137 NORTH
BRANCH SUGAR
RUN BRIDGE
REHAB
ALLEGHENY NATIONAL
FOREST
BRADFORD RANGER DISTRICT
GENERAL NOTES &
SCHEDULE OF ITEMS
4/15/2021
AJT
AJT
PH
C-01 002 006
DESIGN DATA:
THE DESIGN OF THIS BRIDGE SHALL BE BASED ON PHL-93 LOADING. THE PHL-93 LOADING IS EQUAL TO THE AASHTO HL-93 LOADING EXCEPT THAT THE
AXLE LOADS ON THE TANDEM ARE MULTIPLIED BY A FACTOR OF 1.25. LIVE LOAD DEFLECTION SHALL NOT EXCEED 1/500 OF THE SPAN LENGTH.
BRIDGE MANUFACTURER SHALL PROVIDE AN INITIAL LOAD RATING STAMPED BY AN ENGINEER LICENSED IN THE STATE OF PENNSYLVANIA.
LOAD RATING SHALL ASSESS THE FOLLOWING VEHICLES.
· PHL-93
· HL-93
· 3 - AASHTO VEHICLES
· NRL
· SHV'S
· STATE LEGAL LOADS
TIMBER BRIDGE RAILING SHALL MEET TEST LEVEL 2 REQUIREMENTS OF NCHRP REPORT 350.
GENERAL NOTES:
· EXCEPT WHERE OTHERWISE INDICATED ON THESE PLANS OR IN THE SUPPLEMENTAL SPECIFICATIONS, ALL MATERIALS AND WORKMANSHIP
SHALL BE IN ACCORDANCE WITH THE FHWA STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS, FP-14.
· THE PROPOSED IMPROVEMENTS COVERED BY THESE PLANS ARE IN ACCORDANCE WITH:
·· AASHTO: "GUIDELINES FOR GEOMETRIC DESIGN OF VERY LOW-VOLUME LOCAL ROADS (ADT <= 400) (2001)"
·· AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 8TH EDITION, 2017
·· FSH 7709.56b TRANSPORTATION STRUCTURES HANDBOOK (USDA FOREST SERVICE)
·· TIMBER BRIDGES: DESIGN, CONSTRUCTION, INSPECTION, AND MAINTENANCE (USDA FOREST SERVICE)
·· NATIONAL DESIGN SPECIFICATIONS FOR WOOD CONSTRUCTION 2018
· THE EXISTING STRUCTURE SHALL BE CHECKED PRIOR TO STARTING CONSTRUCTION TO ENSURE THAT ITS RELATIONSHIP TO THE PROPOSED
WORK IS AS SHOWN ON THESE PLANS AND ANY DIFFERENCES REQUIRING CHANGES IN THE NEW WORK SHALL BE REPORTED TO THE
CONTRACTING OFFICER WHO WILL WORK WITH THE DESIGN PROJECT ENGINEER.
· THE WORK COVERED BY THESE PLANS INCLUDES REMOVAL OF THE EXISTING DECK/SUPERSTRUCTURE OF THE BRIDGE, DISPOSAL OFF FOREST
SERVICE LANDS, INSTALLATION OF THE NEW DECK/SUPERSTRUCTURE AS SHOWN HEREIN AND PER THE MANUFACTURER'S DRAWINGS AND
SPECIFICATIONS, CONSTRUCTION OF THE APPROACHES TO THE LIMITS SHOWN, SLOPE RESTORATION AND RIPRAP.
· TRAFFIC CONTROL FOR DETOUR SHALL BE IN ACCORDANCE WITH THE CURRENT MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
· AFTER CONTRACT AWARD THE CONTRACTOR SHALL, VERIFY ALL MEASUREMENTS AND DIMENSIONS FOR ACCURACY PRIOR TO ORDERING
MATERIALS AND SUBMITTING SHOP DRAWINGS. IF DIMENSIONS SHOWN ON THE PLANS ARE INCORRECT, IT SHALL BE REPORTED TO THE
CONTRACTING OFFICER WHO WILL WORK WITH THE DESIGN PROJECT ENGINEER.
· THE CONTRACTOR SHALL COORDINATE ALL OF THEIR WORK AND ANY UTILITY COMPANIES RELOCATION WORK AT NO ADDITIONAL COST TO THE
PROJECT. CONTRACTOR SHALL CALL MISS UTILITY TO LOCATE UTILITIES AT THE PROJECT ARE AND FOR ANY SIGN INSTALLATIONS REQUIRED.
DOCUMENTATION SHALL BE PRESENTED TO CO PRIOR TO INITIATION OF WORK.
· FOR PROTECTION OF UNDERGROUND UTILITIES AND IN CONFORMANCE WITH PUBLIC ACT 50, THE CONTRACTOR SHALL DIAL "811" A MINIMUM OF
THREE FULL WORKING DAYS, EXCLUDING SATURDAYS, SUNDAYS AND HOLIDAYS PRIOR TO BEGINNING EACH EXCAVATION IN AREAS WHERE
PUBLIC UTILITIES HAVE NOT BEEN PREVIOUSLY LOCATED. MEMBERS WILL THUS BE ROUTINELY NOTIFIED. THIS DOES NOT RELIEVE THE
CONTRACTOR OF THE RESPONSIBILITY OF NOTIFYING UTILITY OWNERS WHO MAY NOT BE A PART OF THE PENNSYLVANIA 811 ALERT SYSTEM.
· WATER LEVEL IS SUBJECT TO CHANGE. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE EXPECTED WATER LEVELS DURING
CONSTRUCTION.
· NO MATERIAL SHALL BE ALLOWED TO ERODE INTO THE WATER COURSE, NOR SHALL MATERIAL BE PLACED INTO THE WATER COURSE EXCEPT AS
SHOWN ON THESE PLANS.
· ALL EQUIPMENT SHALL BE CLEANED ACCORDING TO THE SPECIFICATIONS PRIOR TO USE ON THIS PROJECT.
· THE CONTRACTOR SHALL STOP WORK IMMEDIATELY AND NOTIFY THE CONTRACTING OFFICER IF HERITAGE RESOURCES OR HUMAN REMAINS ARE
ENCOUNTERED.
· NO WORK SHALL BE PERFORMED ON FEDERAL HOLIDAYS OR WEEKENDS WITHOUT PRIOR APPROVAL FROM THE CONTRACTING OFFICER.
· THE CONTRACTOR SHALL PERFORM ALL IN-STREAM WORK BETWEEN MAY 15TH AND SEPTEMBER 15TH.
INSTALLATION NOTES:
HIGH STRENGTH (A449) DOME HEAD BOLTS (3/4" x 28") DO NOT HAVE FINS UNDER THE HEAD AT THE SHANK, AND ARE TO BE USED AT THE CURB TO DECK
LOCATION.
SPECIFICATIONS:
GRADING:
ALL DOUGLAS FIR-LARCH TO BE GRADED PER WCLIB STANDARD GRADING RULES.
SOUTHERN PINE TO BE GRADED PER SPIB.
MATERIAL & TREATMENT:
· TIMBER PRESERVATION TREATMENT SHALL BE IN ACCORDANCE WITH CURRENT STATE AND/ OR AASHTO SPECIFICATIONS. ALL TIMBER SHALL BE
COPPER NAPHTHENATE TREATED, UC4C (MINIMUM).
· REFERENCE DESIGN VALUES SHOWN ARE PER AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 8TH EDITION, 2017 (U.N.O.)
· DECK ASSUMED TO BE 12" DOUGLAS FIR-LARCH, GRADE PER MANUFACTURERS RECOMMENDATION, DECK SHALL BE S1SE PREPARED TO ACCEPT
A TIMBER PLANK WEARING SURFACE.
· SPREADER BEAMS TO BE DOUGLAS FIR-LARCH, GRADE PER MANUFACTURERS RECOMMENDATION
· BRIDGE RAILPOST TO BE DOUGLAS FIR-LARCH, DENSE SELECT STRUCTURAL (POSTS AND TIMBERS).
· GLU-LAM RAIL TO BE DOUGLAS FIR, COMB. SYMBOL 24F-V8, DF/DF.
· ABUTMENT PILE CAPS TO BE DOUGLAS FIR-LARCH, NO.1 (BEAMS AND STRINGERS).
· ABUTMENT BACKING TO BE DOUGLAS FIR-LARCH, NO.1 & BETTER (> 2 INCH WIDE).
· CURBS & SCUPPERS TO BE DOUGLAS FIR-LARCH NO.1 (POSTS AND TIMBERS) S1S1E.
· WEARING PLANKS SHALL BE 3" DOUGLAS FIR-LARCH NO. 1
· ALL TIMBER IS ROUGH UNLESS OTHERWISE NOTED.
MISCELLANEOUS:
· ALL TIMBER TO BE CUT EXACT LENGTH, DRESSED TO SIZE REQUIRED AND ALL PRACTICAL FRAMING TO BE DONE PRIOR TO TREATMENT.
· ALL DECK PLANKS SHALL BE PREDRILLED PRIOR TO TREATMENT. ALL PLANK FOR DECK PANELS SHALL BE PRECISION END TRIMMED TO LENGTH
WITH 1/4" UNDERLENGTH & NO OVERLENGTH TOLERANCE PERMITTED.
· DECK PANELS SHALL BE ASSEMBLED WITH 3/8" DIAMETER RING SHANK DOWELS. ALL DOWELS ARE TO BE SIMULTANEOUSLY DRIVEN WITH EQUAL
FORCE USING A MECHANICAL PRESS THE FULL LENGTH OF THE DECK. ENSURING ALL HEADS ARE FLUSH WITH THE SURFACE OF THE TIMBER
PLANK.
· MULTIPLE IMPACT TOOLS ARE NOT TO BE USED TO SET DOWELS BECAUSE OF POTENTIAL FOR WOOD FIBER RUPTURE.
· SUBMIT SHOP DRAWINGS FOR BRIDGE DECK AND RAILINGS.
· DECK PANELS WILL BE DELIVERED TO JOBSITE AFTER BEING FULLY ASSEMBLED AT THE FABRICATION PLANT.
· ALL HARDWARE TO MEET ASTM A307-97 GALVANIZED TO A153. ALL HIGH STRENGTH HARDWARE TO MEET ASTM A325 OR A449 GALVANIZED TO
A153.
CONSTRUCTION NOTES:
TIMBER DECK PANELS ARE MARKED IN THE SHOP FOR USE IN FIELD PLACEMENT OF THE PANELS ON THE CAPS, e.g. A1, B1, C1 FOR SPAN 1.
DOWEL LAMINATED DECK:
· PANEL "A" IS PLACED FIRST IN IT'S FINAL POSITION ON THE CAPS. NEXT DRILL THE 11/16" DIA. HOLES THRU PANEL INTO CAP IN EACH END OF
PANEL AT THE LOCATION SHOWN AND FASTEN THE 3/4" DIA. DM. HD. DR. NEXT PLACE PANEL "C" SO THAT ITS UPPER SPLICE BLOCK IS DIRECTLY
OVER THE LOWER SPLICE BLOCK ON PANEL "A" AND DRAW TIGHT TOGETHER. THEN DRILL THE 9/16" DIA. HOLES THRU LOWER SPLICE BLOCK AND
DRIVE THE 5/8" DM. HD. DR. SPIKES IN LOCATION SHOWN. THEN DRILL HOLES THRU PANEL INTO CAP AND FASTEN THE 3/4" DM. HD. DR. SPKS.
THEREAFTER, SUCCESSIVELY PLACE PANEL "B" IN THE SAME MANNER, ENSURING ALL PANELS ARE DRAWN TIGHT TOGETHER BEFORE AND
FASTENING OCCURS.
· STEEL BANDING ON PANELS IS TO BE REMOVED AFTER PANELS HAVE BEEN PLACED IN THEIR FINAL POSITION ON THE CAPS.
· ALL HOLES DRILLED IN THE FIELD WHERE SPIKES ARE USED ARE TO BE 1/16" SMALLER THAN THE SPIKE SIZE.
· ALL HOLES DRILLED FOR BOLTS ARE TO BE 1/16" LARGER THAN BOLT SIZE.
· HOLES DRILLED FOR 3/4" LAG BOLTS ARE TO BE 9/16" IN DIAMETER FOR THE THREADED PORTION OF THE BOLT AND 13/16" FOR THE SHANK.
· ANY NUT OR MACHINE BOLT HEAD IN DIRECT CONTACT WITH TIMBER TO HAVE ON PLATE WASHER BETWEEN NUT & TIMBER, OR BOLT HEAD &
TIMBER.
· ANY NUT OR MACHINE BOLT HEAD IN DIRECT CONTACT WITH STEEL TO HAVE ONE CUT WASHER BETWEEN NUT & STEEL, OR BOLT HEAD & STEEL.
· SET THREADS ON ALL BOLTS AT NUT WITH A CENTER PUNCH AFTER TIGHTENING.
· ABUTMENTS TO BE BACKFILLED WITH CLEAN GRANULAR FILL PER PLAN.
· ALL TIMBER CUT OR DRILLED IN THE FIELD SHALL BE TREATED WITH COPPER NAPHTHENATE.
· CONSTRUCTION REQUIREMENTS SHALL CONFORM TO FP-14 SPECIFICATIONS OR MANUFACTURERS RECOMMENDATION WHICHEVER IS MORE
STRINGENT, UNLESS OTHERWISE NOTED.
· ALTHOUGH ALL PRACTICAL PRE-FRAMING WILL BE DONE PRIOR TO TREATING, SOME CUTTING & DRILLING WILL BE REQUIRED IN THE FIELD.
FR 137 NORTH BRANCH SUGAR RUN BRIDGE REHAB
SCHEDULE OF ITEMS
ITEM
NUMBER ITEM DESCRIPTION METHOD OF
MEASUREMENT UNIT QUANTITY
15101-0000 MOBILIZATION LSQ LPSM 1
15201-0000 CONSTRUCTION SURVEY AND STAKING LSQ LPSM 1
15401-0000 CONTRACTOR TESTING LSQ LPSM 1
15701-0000 SOIL EROSION CONTROL LSQ LPSM 1
20304-4000 REMOVAL OF BRIDGE SUPERSTRUCTURE LSQ LPSM 1
20801-0000 STRUCTURE EXCAVATION AQ CUYD 8
20803-0000 STRUCTURAL BACKFILL AQ CUYD 8
25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 AQ CUYD 20
30101-2000 AGGREGATE BASE GRADING D,
COMPACTION C AQ TON 100
55601-1300 BRIDGE RAILING, TIMBER DQ LNFT 44
55705-0000 TREATED STRUCTURAL TIMBER, DOWEL
LAMINATED DECK LSQ EACH 1
62501-0000 TURF ESTABLISHMENT AQ ACRE 1
63308-0000 OBJECT MARKER DQ EACH 4
63501-0000 TEMPORARY TRAFFIC CONTROL LSQ LPSM 1
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
1 0 7:
A
JT
AY
LO
R
C:
\U
SE
RS
\A
JT
AY
LO
R\
DE
SK
TO
P\
-N
OR
TH
B
RA
NC
H
SU
GA
R
RU
N\ 1_
CA
D
MA
PS
R
AW
D
AT
A
PR
E
CO
NS
TR
UC
TI
ON
P
HO
TO
S\
FR
7 N
B R
SU
GA
R
RU
N
BR
R
EP
LA
CE
ME
NT
_V 4.D
W G;
R9
EASTERN REGION
FR 137 NORTH
BRANCH SUGAR
RUN BRIDGE
REHAB
ALLEGHENY NATIONAL
FOREST
BRADFORD RANGER DISTRICT
SIGN PLAN
03/29/2021
AJT
AJT
PH
C-02 003 006
W20-3 ROAD CLOSURE
ADVANCE
36X36 BLACK ON ORANGE
R11-2 ROAD CLOSED
30X48 BLACK ON WHITE
ROAD
CLOSED
2.5 MILES
ROAD
CLOSED
W20-3 ROAD CLOSURE
ADVANCE
36X36 BLACK ON ORANGE
ROAD
CLOSED
3.9 MILES
W20-3 ROAD CLOSURE
ADVANCE
36X36 BLACK ON ORANGE
ROAD
CLOSED
1.8 MILES
CLOSURE AREA
2.0 MILES
R11-2 ROAD CLOSED
30X48 BLACK ON WHITE
FR 137 FIRE
ROAD CLOSED
FOR BRIDGE
REPLACEMENT
M
I N
TRAVELED WAY
HIGHEST POINT OF
* WHERE LATERAL CLEARANCE IS NOT PRACTICAL DUE TO STEEP SLOPE OR OTHER CONDITION AN ABSOLUTE
MINIMUM DISTANCE OF 2' MAY BE USED. THIS MINIMUM DISTANCE OF 2' MAY ALSO BE USED FOR ROUTE
MARKERS AND MUST BE 4' ABOVE GROUND.
**ALL POSTS SHALL CONFORM TO PENNDOT TYPE B, STEEL SQUARE POST SYSTEM A REQUIREMENTS. (TC8702B)
E D
G
O
F
S
H O
U L
D E
R
SIGN
6' MIN.*
M
I N
L
C
SIGN PLACEMENT ALONG TYPICAL ROADWAY
NOT TO SCALE
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
1 0 7:
A
JT
AY
LO
R
C:
\U
SE
RS
\A
JT
AY
LO
R\
DE
SK
TO
P\
-N
OR
TH
B
RA
NC
H
SU
GA
R
RU
N\ 1_
CA
D
MA
PS
R
AW
D
AT
A
PR
E
CO
NS
TR
UC
TI
ON
P
HO
TO
S\
FR
7 N
B R
SU
GA
R
RU
N
BR
R
EP
LA
CE
ME
NT
_V 4.D
W G;
R9
EASTERN REGION
FR 137 NORTH
BRANCH SUGAR
RUN BRIDGE
REHAB
ALLEGHENY NATIONAL
FOREST
BRADFORD RANGER DISTRICT
EXISTING STRUCTURE :
REMOVAL NOTES
4/15/2021
AJT
AJT
PH
C-03 004 006
ELEVATION
PLAN
CAUTION SHALL BE TAKEN NOT TO
DAMAGE THE TIE ROD AND DEAD MAN
DURING EXCAVATION OPERATIONS
EXISTING GUARD RAIL SYSTEM SHALL
BE REMOVED AND DISPOSED OF
EXISTING WEARING SURFACE
LONGITUDINAL LAMINATED
DECK PANELS TO BE
REMOVED AND DISPOSED OF.
REMOVAL AND REPLACEMENT
OF BACKING PLANKS SHALL BE INCLUDED
IN INSTALLATION COST OF NEW BRIDGE SLAB
ALL COSTS ARE CONSIDERED INCIDENTAL
TO ITEM 55705-0000
CONTRACTOR SHALL REMOVE
AND REPLACE DRIFT PINS
IN-KIND WHEN 12"X12"X16'
PILECAP IS REPLACED.
EXISTING AGGREGATE
SURFACED APPROACH
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
A
A
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
1 0 7:
A
JT
AY
LO
R
C:
\U
SE
RS
\A
JT
AY
LO
R\
DE
SK
TO
P\
-N
OR
TH
B
RA
NC
H
SU
GA
R
RU
N\ 1_
CA
D
MA
PS
R
AW
D
AT
A
PR
E
CO
NS
TR
UC
TI
ON
P
HO
TO
S\
FR
7 N
B R
SU
GA
R
RU
N
BR
R
EP
LA
CE
ME
NT
_V 4.D
W G;
R9
EASTERN REGION
FR 137 NORTH
BRANCH SUGAR
RUN BRIDGE
REHAB
ALLEGHENY NATIONAL
FOREST
BRADFORD RANGER DISTRICT
PROPOSED STRUCTURE
4/15/2021
AJT
AJT
PH
C-04 005 006
ELEVATION
PLAN
SECTION
A
WEARING SURFACE
LONGITUDINAL DOWEL
LAMINATED DECK PANELS
TO BE REMOVED AND
DISPOSED OF.
STRUCTURAL EXCAVATION
AND STRUCTURAL BACKFILL
LIMITS (BOTH ABUTMENTS)
RECONDITION BRIDGE APPROACHES
FULL WIDTH 6" DEEP AND RE-COMPACT
50'
22' OAL
FASTENERS AT MANUFACTURES
RECOMMENDED SPACING
OBJECT MARKERS TO BE
INSTALLED ON ALL FOUR
CORNERS. 2-OM3L, 2-OM3R
2'
REPLACE EXISTING
12X12 PILECAP
SEE BEARING DETAIL
BEARING DETAIL
REMOVE EXISTING BACKING PLANKS
IN ORDER TO REPLACE TIMBER SLAB
CONTRACTOR SHALL FURNISH
NEW 3X12 PLANKS (TOTAL LENGTH 24')
16'-0" DECK OUT-OUT
EXISTING CLEAT TO REMAIN
IN PLACE DURING CONSTRUCTION
CONTRACTOR SHALL TAKE
PRECAUTION TO NOT DAMAGE
DURING EXCAVATION OPERATIONS
SEE RIPRAP DETAIL
SHEET C-05
SECTION
A
14'-0" min CLEAR WIDTH
15'-11" DECK OUT-OUT
SEE RAIL SYSTEM
DETAILS ON SHEET C5
NEW 12"X12"X16' PILECAP
DRILLED TO MATCH EXISTING
DRIFT PIN LOCATIONS
SPREADER BEAMS AT
MANUFACTURER RECOMMENDED
SPACING AND DIMENSIONS
SHOP DRILLED
UPPER FLANGE
FIELD DRILLED
LOWER FLANGE
FASTENER SPACING
AT MANUFACTURERS
RECOMMENDED SPACING
3" THICK TIMBER PLANK
WEARING SURFACE
EXISTING PILES
TO REMAIN IN PLACE
DURING CONSTRUCTION
SPREADER BEAM LOCATIONS QUANTITY, SIZE,
AND SPACING WILL BE BASED ON MANUFACTURERS
REQUIREMENTS TO MEET LOAD RATING
AGGREGATE APPROACHES
TO BE RECONDITIONED
6"
12" ASSUMED
SLAB THICKNESS
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
1 2" B
EV
EL
A T
RA
IL
PO
ST
1 4" B
EV
EL
A T
RA
IL
AN
D
BL
O
CK
S
RAILPOST
GLU-LAM RAIL
RAILPOST BLOCK
CURB
DM. HD. BOLTS WITH
PLATE WASHER EA.,
SHOP DRILL POST
DM. HD. BOLT WITH
PLATE WASHERS, POST
TO CURB, SHOP DRILL
DM. HD. DRIVE SPIKE,
RAILPOST TO DECK
SHOP DRILL POST
SPLIT RINGS, CURB TO SCUPPER,
SCUPPER TO DECK. SHOP DRILL
CURB AND SCUPPER, FIELD DRILL
DECK
DM. HD. BOLT WITH PLATE
WASHERS, CURB TO DECK,
FIELD DRILL DECK
DM. HD. DRIVE SPIKE,
DECK REINFORCEMENT,
FIELD DRILL
SECTION AT RAILPOST
MATCH MARK
ALIGNMENT
TAGS
HEX LAGS, CURB TO DECK AT
ENDS, FIELD DRILL DECK
CURB
SCUPPER
GLU-LAM RAIL
14" DECK PANELS
CURB AND SCUPPER ASSEMBLY
BRIDGE RAILPOST
BEVEL DETAIL
DM. HD. BOLT WITH PLATE
WASHER, CURB TO DECK,
FIELD DRILL DECK
SPLIT RING CONNECTORS
SECTION A-A
NOTE:
ALL RAILING DETAILS TO BE
CONFIRMED AND DESIGNED
BY CONTRACTOR FOR A
TL-2 TIMBER RAIL SYSTEM
GLU-LAM. ALL MATERIAL AND WORK
ASSOCIATED WITH THE TL-2 RAILING
SYSTEM SHALL BE PAID BY 'TREATED
STRUCTURAL TIMBER, NAIL
LAMINATED (RAIL)'.
BRIDGE RAIL AND RAILPOST
BLOCK BEVEL DETAIL
GLU-LAM RAILPOST BLOCK
DM. HD. DRIVE SPIKE,
DECK REINFORCEMENT
SCUPPER
TL-2 TIMBER RAIL SYSTEM
GLU-LAM. DESIGN BY CONTRACTOR
GLU-LAM RAILPOST BLOCK
CURB
GLU-LAM RAIL
SCUPPER
RIPRAP DETAIL
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/1 5/2
1 0 7:
A
JT
AY
LO
R
C:
\U
SE
RS
\A
JT
AY
LO
R\
DE
SK
TO
P\
-N
OR
TH
B
RA
NC
H
SU
GA
R
RU
N\ 1_
CA
D
MA
PS
R
AW
D
AT
A
PR
E
CO
NS
TR
UC
TI
ON
P
HO
TO
S\
FR
7 N
B R
SU
GA
R
RU
N
BR
R
EP
LA
CE
ME
NT
_V 4.D
W G;
R9
EASTERN REGION
FR 137 NORTH
BRANCH SUGAR
RUN BRIDGE
REHAB
ALLEGHENY NATIONAL
FOREST
BRADFORD RANGER DISTRICT
DETAILS
4/12/2021
AJT
AJT
PH
C-05 006 006
ITEM 25101-0300
PLACED RIPRAP,
METHOD A, CLASS 3
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| Sheets and Views |
| FR 137 N BR SUGAR RUN BR REPLACEMENT_V4-COVERSHEET |
| OLE1 |
| FR 137 N BR SUGAR RUN BR REPLACEMENT_V4-C1 |
| OLE1 |
| FR 137 N BR SUGAR RUN BR REPLACEMENT_V4-C2 |
| OLE1 |
| FR 137 N BR SUGAR RUN BR REPLACEMENT_V4-C3 |
| OLE1 |
| FR 137 N BR SUGAR RUN BR REPLACEMENT_V4-C4 |
| OLE1 |
| FR 137 N BR SUGAR RUN BR REPLACEMENT_V4-C5 |
| OLE1 |
| 2021-04-15T07:52:29-0400 | |
| ADAM TAYLOR |
| 2021-04-16T14:22:28-0400 | |
| ROBERT KLASEN |
| 2021-04-17T10:08:33-0400 | |
| RICHARD HATFIELD |
| 2021-04-20T14:56:49-0400 | |
| JAMIE DAVIDSON |
| 2021-04-21T08:51:57-0500 | |
| Jeffrey W. Dulka |
| 2021-04-21T10:04:39-0500 | |
| JOSIAH KIM |
File details come from the government source that posted it. Updated .