J2 Project Specifications-Maps.pdf

PDF 5 MB Posted

Attached to
Allegheny National Forest - Marienville Ranger District Lamentation Public Works Roads Reconstruction - Presolicitation
Solicitation number
12445523B0002
Issued by

About this file

This document outlines specifications for a federal road construction project on the Allegheny National Forest. The project involves reconstructing several forest roads totaling approximately 7 miles. Work includes roadway excavation, embankment construction, culvert replacement, sign installation, brush clearing, seeding, and road reconditioning. Aggregate materials, erosion controls, and construction tolerances are specified. The Department of Agriculture Forest Service will evaluate bids and award the firm fixed price contract.

View the file

Other files

File Type Posted
J1 DBA WD PA0002 - Forest County.pdf PDF
IFB-12445523B0002-FINAL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION 9

ALLEGHENY NATIONAL FOREST

LAMENTATION PW ROAD PACKAGE

FR 561 Bear Creek [1.6] Miles Reconstruction – Maintenance Level of Service [J] FR 561A Bear Creek A [0.9] Miles Reconstruction – Maintenance Level of Service [J] FR 211 Newtown [1.4] Miles Reconstruction – Maintenance Level of Service [J]

Optional Bid Item

FR 211A Newtown A [0.46] Miles Construction – New Corridor Level of Service [I]

Marienville Ranger District Forest County Pennsylvania

Vicinity Map Statement of Work Schedule of Items General Notes Road Log - Work Descriptions Roadbed Details & Drawings Specifications Description

The location and design elements of these facilities have been correlated with the plans, policies and constraints of the approved Jughandle Environmental Assessment and Jughandle Environmental Impact Statement.

Plans are to be used with "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects” FP-14 with Special Project Specifications thereto included in this contract.

Prepared By: Approved By:

Preconstruction Engineer Date Forest Engineer Date

District Ranger Date

Forest Supervisor Date

4/18/23

Vicinity Map

STATEMENT OF WORK

PART 1 - GENERAL

SUMMARY

Work for this project consists of, but is not limited to: mobilization, drainage excavation, brushing, clearing and grubbing, aggregate base and surface placement, roadway reconditioning, culvert replacement/new installation, gate replacement, sign installation and turf establishment. This work is planned on FR 561, FR 561A, and FR 211.

An Optional bid item is for new road construction, clearing and grubbing, aggregate base and surface placement, new culvert installation, roadway reconditioning, and turf establishment for FR 211A.

LOCATION

This project is located in the Allegheny National Forest on the Marienville Ranger District.

USE OF PREMISES

General: Contractor shall have full use of Forest roads for construction operations, during construction period. Contractor's use of Forest roads is limited only by the Government's right to perform work or to retain other contractors on portions of Project.

Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and employees. Road closures will be permitted, when required, upon written approval of the Contracting Officer (CO).

Confine storage of materials to areas as approved by the CO.

Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all brushing operations. Contractor shall minimize disturbance of all undisturbed areas.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

General Notes

– Prior to any earth disturbing activities, contractor shall call the Pennsylvania One Call System (800-242-1776) and all Oil & Gas Operators in the work area to determine locations of any underground utility lines.

Contact Minard Run Oil Co., Gary Davis cell:814-688-2780 email:gdavis@minardrunoil.com

– All road work will be completed prior to timber haul, unless otherwise approved. All roadwork shall be conducted in accordance with FP-14 with Forest Service Supplemental Specifications (FSSS).

– Contractor is responsible for maintenance of all Forest Service roads over which pit run or commercial stone material is hauled. Roads shall be bladed or shaped to restore travel way to the condition found prior to haul.

– Culvert cleaning and repair will be considered incidental to road reconditioning.

– Contractor shall furnish, erect and maintain the minimum barricades and warning signs identified in the Special Project Specifications until final inspection and acceptance, unless otherwise directed by the Engineer. Signs shall conform to the Manual on Uniform Traffic Control Devices (MUTCD). Contractor shall install “ROAD CONSTRUCTION AHEAD” signs on all roads in this project area and at ATV trail crossings. Contractor’s sign plan must be approved by Forest Service prior to work. Signs will be covered on weekends, holidays and any days when contractor is not working.

– Roads shall be completed in such a manner that water shall not pond on roadbed or in ditch lines.

– All removed corrugated metal pipe culverts shall be hauled off Federal lands and become the property of the contractor, unless otherwise indicated for salvage. Steel pipe casings shall be returned to the Sheffield Compound (4850 Route 6, East Sheffield, PA 16347) unless otherwise directed by the Engineer.

– Contouring, topsoil re-spreading, seeding and mulching of disturbed areas as determined by the Forest Service is required.

– DSA limestone shall be shipped at optimum moisture content not exceeding 15%. Limestone loads that fail field test parameters will be rejected.

– When replacing culverts in live streams, contractor shall install silt fence and straw bales at approaches to live stream crossings to eliminate sediment in the stream course. When culverts are located on High Quality and Exceptional Value streams, contractor shall install compost filter socks. Any sediment collected will be removed and ground will be stabilized with seed and mulch. Dewatering pumps will be used to redirect water out of the stream course at the time of stream crossing installation. Silt fence and straw bales will be removed only after vegetation is clearly re-established as determined by the Engineer.

– Roadway sod encountered during road reconditioning operations will be spread and leveled outside the road template avoiding piles. Natural terrain depressions and openings are the preferred waste locations.

Seeding and mulching may be required to supplement natural revegetation.

– Vegetation cut down during roadside brushing will be pulled beyond the clearing limits and the toe of any roadway template construction. Mixing of soil and cut vegetation shall be avoided. All material will be scattered and lopped within 3’ of the ground.

– On roads closed to public traffic, aggregate may be stockpiled for culvert replacement on areas agreed upon in writing by the E.R. aggregate shall not be stockpiled on the road surface. No road surface aggregate will be stockpiled unless written agreement is in place from the E.R. based on formal written request from the Purchaser Representative. Stockpiling does not conform to the following contract specifications: FP14 #204, and #303.– In any location where aggregate is stockpiled for future use, stockpiles shall have proper E&S controls.

– Contractor shall install silt fence and straw bales at live stream crossings to eliminate sediment in the stream course. Any sediment collected will be removed and stabilized with seed and mulch. This will be considered incidental to Pay Item 602.

Road Log - Work Descriptions

561 – BEAR RUN

STATION 0+00 TO 85+00: LEVEL OF SERVICE II

NO KNOWN OGM SURFACE INFRASTRUCTURE, PENNSYLVANIA ONE CALL (800-242-1776)

MILEPOST STATION ROAD LOG/WORK DESCRIPTION (OCTOBER 2022)

0.000

0+00

INTERSECTION OF FR 212 (STA. 89+90) AND FR 561

COORDINATES: LATITUDE 41° 29' 33.6" N (41.492634)

LONGITUDE -79° 15' 10.8" W (-79.252948)

1.610 0+00

85+00 RECONDITION ROADWAY, SEE “TYPICAL

RECONDITION SECTION”; ROADWAY

RECONDITION INCLUDES BUT IS NOT LIMITED

TO: SCARIFY EXISTING ROADBED; REMOVE

DEBRIS AND RESHAPE CULVERT INLET AND

OUTLETS AND ALL DITCH LINES TO ACHIEVE

POSITIVE DRAINAGE; RECONDITION OF ALL

EXISTING TURNOUTS; THE PLACEMENT OF ANY

ADDITIONAL MATERIAL; AND COMPACTION OF

SURFACING. REMOVE ALL SOD FROM

ROADWAY, DISPOSE UNSUITABLE MATERIAL

WITHOUT AFFECTING ROAD DRAINAGE.

SCATTER WASTE MATERIAL, SEED, AND

MULCH.

0.000 - 0.826 0+00 - 43+60 PERFORM ROADSIDE (MEDIUM) BRUSHING, 12'

FROM SHOULDERS TO A MINIMUM HEIGHT OF

14'. REMOVE ANY EXISTING BLOWDOWN AND

BRUSH TO OUTSIDE OF CLEARING LIMITS

0.000 - 1.610 0+00 - 85+00 APPLY SPOT SURFACING COMPACTED PA2A (230

TONS)

0.007

0+35

"YIELD" SIGN LEFT. REPLACE WITH “STOP” SIGN.

0.009

0+45

“561” SIGN RIGHT

0.015

0+80

18”X28’ CMP

0.039 2+05 18”X28’ CMP

0.123 - 0.140 6+50 - 7+40 TURNOUT RIGHT APPLY COMPACTED PA2A (23

0.119 - 0.129 10+75 - 12+05 TURNOUT RIGHT

0.234

12+35

18”X24’ CMP, CLEAN OUTLET

0.277

14+60

18”X24’ CMP

0.375

19+80

TURN AROUND RIGHT, RECONDITION

0.478

25+25

18”X26’ CMP, DAMAGED INLET

0.515 27+20 REMOVE 18”X28’ CMP. INSTALL NEW 18”X28’

CMP, BACKFILL WITH 23 TONS COMPACTED

PA2A

0.521 27+50 CAMPING AREA RIGHT

0.544 - 0.547 28+70 - 28+90 TURNOUT LEFT

0.614 32+40 18”X26’ CMP

0.628 33+15 TURN AROUND LEFT

0.648 34+20 CAMPING AREA LEFT

0.710 37+50 18”X26’ CMP

0.807 42+60 18”X24’ CMP

0.825 43+55 24’X26’ CMP

0.826 43+60 PERFORM ROADSIDE (MEDIUM) BRUSHING, 12'

FROM SHOULDERS TO A MINIMUM HEIGHT OF

14'. REMOVE ANY EXISTING BLOWDOWN AND

BRUSH TO OUTSIDE OF CLEARING LIMITS

0.858 - 0.876 45+30 - 46+25 TURN AROUND LEFT

0.896 47+30 18”X26’ CMP LFS

0.977 51+60 18”X32’ CMP LFS

1.013 - 1.051 53+50 - 55+50 CONSTRUCT RIGHT DITCHLINE

1.032 54+50 INSTALL NEW 18”X26’ CMP OUTLET LEFT,

BACKFILL WITH 23 TONS COMPACTED PA2A.

CONSTRUCT OUTLET DITCH TO DRAIN

1.063 56+10 18”X28’ CMP

1.064 - 1.080 56+20 - 57+00 TURNOUT RIGHT

1.083 57+20 TURN AROUND LEFT

1.102 58+20 REMOVE 18”X26’ CMP. INSTALL NEW 18”X26’

CMP, BACKFILL WITH 23 TONS COMPACTED

1.109 58+55 TURN AROUND RIGHT

1.117 - 1.146 59+00 - 60+50 TURN AROUND LEFT

1.189 62+80 18”X26’ CMP

1.285 67+85 18”X30’ CMP

1.327 - 1.345 70+05 - 71+00 TURNOUT LEFT

1.366 72+10 18”X32’ CMP

1.477 - 1.500 78+00 - 79+20 TURNOUT LEFT

1.540 81+30 18”X30’ CMP, REPAIR INLET

1.564 82+60 18”X30’ CMP

1.569 82+85 PIPELINE CROSSING

1.583 - 1.606 83+60 - 84+80 TURNOUT LEFT

1.607 84+85 18”X34’ CMP, REPAIR INLET

1.610 85+00 FR 561A RIGHT, END OF ROAD WORK ON FR 561

FR 561A – BEAR RUN SPUR A

STATION 0+00 TO 62+50: LEVEL OF SERVICE J (RESTRICTED)

NO KNOWN OGM SURFACE INFRASTRUCTURE, PENNSYLVANIA ONE CALL (800-242-1776)

MILEPOST STATION

ROAD LOG/WORK DESCRIPTION (OCTOBER 2022)

INTERSECTION OF FR 561 (STA. 85+00) AND FR 561

COORDINATES: LATITUDE 41° 30' 08.9" N(41.502482)

LONGITUDE -79° 16' 52.7" W (-79.281309)

0.000 - 1.184 0+00 62+50 RECONDITION ROADWAY, SEE “TYPICAL

RECONDITION SECTION”; ROADWAY

RECONDITION INCLUDES BUT IS NOT LIMITED

TO: SCARIFY EXISTING ROADBED; REMOVE

DEBRIS AND RESHAPE CULVERT INLET AND

OUTLETS AND ALL DITCH LINES TO

ACHIEVE POSITIVE DRAINAGE; RECONDITION

OF ALL EXISTING TURNOUTS; THE

PLACEMENT OF ANY ADDITIONAL MATERIAL;

AND COMPACTION OF SURFACING. REMOVE

ALL SOD FROM ROADWAY, DISPOSE

UNSUITABLE MATERIAL WITHOUT

AFFECTING ROAD DRAINAGE. SCATTER

WASTE MATERIAL, SEED, AND MULCH.

0.000 - 0.256 0+00 - 13+50 APPLY SURFACING COMPACTED PA2A (230

0.000 1+65 GATE NEEDS REPLACED

0.048

2+55

“561” SIGN RIGHT

0.099 5+25 12”X24’ CMP RFS

0.149 7+85 12”X24’ CMP RFS

0.208 11+00 12”X24 CMP RFS

0.256 13+50 ENTER OLD STRIP PIT – SUFACE BEDROCK

0.303 - 0.360 16+00 - 19+00

EXIT STRIP PIT. BEGIN NEW ROAD

CONSTRUCTION UPHILL TO THE RIGHT, TO

AVOID LARGE DEEP PIT. CLEARING AND

GRUBBING. APPLY COMPACTED ASHTO #3

BASE (138 TONS) AND PA2A SURFACING (63

0.309 - 0.322 16+30 - 17+00

FLATTEN UPHILL GRADE

0.350

18+50

TURN BACK LEFT AND INTERSECT ORIGINAL

ROADBED.

0.350 - 1.184 18+50 - 62+50 APPLY SURFACING COMPACTED PA2A (782

0.393

20+75

12”X24’ CMP LFS

0.458

24+20

12”X24’ CMP LFS

0.466 24+60 LEAD OFF DITCH LEFT

0.510 26+95 12”X24’ CMP

0.652

34+45

12”X24’ CMP

0.662

34+95

TURN AROUND RIGHT, 25’ DEEP

0.724 38+25 12”X24’ CMP RFS

0.806 42+55 12”X24’ CMP

0.829 43+80 TURN AROUND RIGHT, 25’X50’ RECONDITION

AND APPLY 23 TONS COMPACTED PA2A

0.900 47+50 12”X24’ CMP RFS

0.925 48+85 OLD PIT ROAD RIGHT

1.001

52+90

12”X24’ CMP, INLET BURIED. REPLACE WITH

18”X26’ CMP. BACKFILL WITH 23 TONS

COMPACTED PA2A. CONSTRUCT OUTLET

DITCH TO DRAIN

1.063

56+10

12”X24’ CMP, INLET BURIED. REPLACE WITH

18”X26’ CMP LFS. BACKFILL WITH 23 TONS

1.100 58+10 TURN AROUND RIGHT, 25’X60’ RECONDITION

AND APPLY 23 TONS COMPACTED PA2A

1.158 61+15 12”X24’ CMP, INLET BURIED. REPLACE WITH

18”X26’ CMP LFS. BACKFILL WITH 23 TONS

1.184

62+50

END OF ROAD. COSTRUCT LOOP

TURNAROUND, (AROUND LARGE BOULDER),

APPLY COMPACTED CRUSHED ASHTO #3 BASE

(46 TONS) AND PA2A SURFACE (23 TONS)

FR 211 -NEWTOWN

STATION 0+00 TO 70+50: LEVEL OF SERVICE J (RESTRICTED)

OGM CONTACT INFORMATION: PENNSYLVANIA ONE CALL (800-242-1776)

MINARD RUN OIL CO., GARY DAVIS 814-688-2780

FR 211 BEGINS AT THE END OF FR 212

COORDINATES: LATITUDE 41° 30' 51.7" N

(41.514342) LONGITUDE -79° 14' 25.7" W (79.240524)

0.000 - 1.048 0+00 - 55+80 RECONDITION ROADWAY (GRADER), SEE

“TYPICAL RECONDITION SECTION”; ROADWAY

RECONDITION INCLUDES BUT IS NOT LIMITED

TO: SCARIFY EXISTING ROADBED; REMOVE

DEBRIS AND RESHAPE CULVERT INLET AND

OUTLETS AND ALL DITCH LINES TO ACHIEVE

POSITIVE DRAINAGE; RECONDITION OF ALL

EXISTING TURNOUTS; THE PLACEMENT OF

ANY ADDITIONAL MATERIAL; AND

COMPACTION OF SURFACING. REMOVE ALL

SOD FROM ROADWAY, DISPOSE UNSUITABLE

MATERIAL WITHOUT AFFECTING ROAD

DRAINAGE. SCATTER WASTE MATERIAL, SEED,

AND MULCH.

0.000 - 1.057 0+00 - 55+80

PERFORM ROADSIDE (MEDIUM) BRUSHING, 12'

FROM SHOULDERS TO A MINIMUM HEIGHT OF

14'. REMOVE ANY EXISTING BLOWDOWN AND

0.000 - 1.057 0+00 - 55+80 APPLY 92 TONS COMPACTED PA2A SPOT

SURFACING

0.005 - 0.034 0+30 - 1+80 FENCE RIGHT

0.079

4+20

BURIED PIPELINE MARKER IN LEFT DITCHLINE

0.094 - 0.113 4+95 - 5+95

TURN OUT LEFT

0.145

7+65

20”X30’ CMP

0.176 - 0.195 9+30 - 10+30

0.195

10+30

0.258

13+60

0.262 - 0.286 13+85 - 15+10 TURN OUT LEFT

0.303

16+00

0.327

17+25

0.376

19+85

TURN AROUND LEFT

0.387

20+45

OLD LANDING RIGHT

0.416

21+95

0.419 22+15 20”X30’ CMP

0.456 - 0.477 24+00 - 25+20 TURN OUT LEFT

0.496

26+20

0.510

26+95

0.514

27+15

0.540

28+50

OLD LANDING RIGHT

0.586

30+95

0.588

31+05

0.618

32+65

0.662 - 0.683 34+95 - 36+05

0.702

37+05

PVC RISER LEFT

0.709 37+45 BURIED PIPELINE MARKER IN LEFT DITCHLINE

0.735 38+80 20”X30’ CMP, CLEAN OUT INLET

0.327 - 0.765 39+20 - 40+40

0.775

40+90

0.790

41+70

PVC RISER LEFT

0.807

42+60

20”X30’ CMP, DAMAGED INLET

0.862

45+50

0.871 46+00 OGM ROAD LEFT. BEGIN NEW FR 211 A

OPTIONAL BID ITEM)

0.879

46+35

0.879

46+40

20”X30’ CMP, LFS

0.956

50+50

0.963 50+85 BURIED PIPELINE MARKER IN LEFT DITCHLINE

0.974

51+45

20”X30’ CMP, LFS

1.013

53+50

1.022

53+95

OGM TANK BATTERY LEFT

1.046

55+25

OGM ROAD LEFT

1.048

55+35

FR 484 INTERSECTS RIGHT

1.057 - 1.339 55+80 - 70+50 RECONDITION ROADWAY (DOZER), SEE

“TYPICAL RECONDITION SECTION”; ROADWAY

RECONDITION INCLUDES BUT IS NOT LIMITED

TO: SCARIFY EXISTING ROADBED; REMOVE

DEBRIS AND RESHAPE CULVERT INLET AND

OUTLETS AND ALL DITCH LINES TO ACHIEVE

POSITIVE DRAINAGE; RECONDITION OF ALL

EXISTING TURNOUTS; THE PLACEMENT OF

ANY ADDITIONAL MATERIAL; AND

COMPACTION OF SURFACING. REMOVE ALL

SOD FROM ROADWAY, DISPOSE UNSUITABLE

MATERIAL WITHOUT AFFECTING ROAD

DRAINAGE. SCATTER WASTE MATERIAL, SEED,

1.057 - 1.339 55+80 - 70+50

BEGIN ROADSIDE (HEAVY) BRUSHING, 12' FROM

SHOULDERS TO A MINIMUM HEIGHT OF 14'.

REMOVE ANY EXISTING BLOWDOWN AND

1.057 - 1.339 55+80 - 70+50 APPLY 115 TONS COMPACTED PA2A SPOT

SUFACING

1.123 - 1.134 59+30 - 59+90

1.144

60+40

OLD ROAD LEFT

1.235

65+20

OGM ROAD RIGHT (WIDE INTERSECTION)

1.281 - 1.293 67+65 - 68+25 TURN OUT RIGHT, APPLY 23 TONS COMPACTED

1.296

68+45

REMOVE 18”X24’ CMP. INSTALL NEW 18”X28’

CMP RFS, BACKFILL WITH 23 TONS

COMPACTED PA2A

1.328

70+10

TURN AROUND LEFT (25’W X45’D),

RECONDITION AND APPLY 23 TONS

COMPACTED PA2A

1.339

70+50

END OF ROAD MAINTENANCE, FR 211

CONTINUES.

OPTIONAL ITEM Road Log – Work Description

FR 211A

STATION 113+30 TO 179+80: LEVEL OF SERVICE J (RESTRICTED)

OGM CONTACT INFORMATION: PENNSYLVANIA ONE CALL (800-242-1776)

MINARD RUN OIL CO., GARY DAVIS 814-688-2780

INTERSECTION OF FR 211 (STA. 46+00) AND OGM

WELL ROAD FR 211A

COORDINATES: LATITUDE 41° 31' 09.5" N

(41.519337) LONGITUDE -79° 15' 15.5" W (79.254275)

0.000 0.044 0+00 2+30 RECONDITION ROADWAY, SEE “TYPICAL

RECONDITION SECTION”; ROADWAY

RECONDITION INCLUDES BUT IS NOT LIMITED

TO: SCARIFY EXISTING ROADBED; REMOVE

DEBRIS AND RESHAPE CULVERT INLET AND

OUTLETS AND ALL DITCH LINES TO ACHIEVE

POSITIVE DRAINAGE; RECONDITION OF ALL

EXISTING TURNOUTS; THE PLACEMENT OF

ANY ADDITIONAL MATERIAL; AND

COMPACTION OF SURFACING. REMOVE ALL

SOD FROM ROADWAY, DISPOSE UNSUITABLE

MATERIAL WITHOUT AFFECTING ROAD

DRAINAGE. SCATTER WASTE MATERIAL, SEED,

AND MULCH. APPLY 46 TONS COMPACTED PA2A

SURFACING.

0.036 1+90 OGM WELL RIGHT

0.044

0.460 2+30

24+30

PERFORM ROADWAY CLEARING AND

GRUBBING, 50' WIDE TO A MINIMUM HEIGHT

OF 14'. REMOVE ANY EXISTING BLOWDOWN

AND BRUSH TO OUTSIDE OF CLEARING LIMITS

0.044 - 0.460 2+30 - 24+30

CONSTRUCT ROADWAY, SEE “TYPICAL

ROADWAY SECTION”; ROADWAY

CONSTRUCTION INCLUDE BUT IS NOT LIMITED

TO: TEMPLATE, DITCHLINES, CULVERTS AND

OUTLET DRAINAGE. ROADBED; THE

PLACEMENT AND COMPACTION OF BASE (1012

TONS ASHTO #3) AND SURFACING (460 TONS

PA2A) MATERIAL; DISPOSE UNSUITABLE

MATERIAL WITHOUT AFFECTING ROAD

DRAINAGE. SCATTER WASTE MATERIAL, SEED,

0.045

2+35

INSTALL NEW 18”X32’ CMP, BACKFILL WITH 23

TONS COMPACTED PA2A

0.045 - 0.460 2+35 - 24+30 FIELD VERIFY ALL CULVERT LOCATIONS

0.081

4+30

INTERSECT HORSE TRAIL. INSTALL 18”X26’

CMP RFS, APPLY 23 TONS COMPACTED PA2A

CONSTRUCT OUTLET DITCH TO LEFT TO DRAIN

0.171 9+05

INSTALL 18”X26’ CMP RFS, APPLY 23 TONS

COMPACTED PA2A CONSTRUCT OUTLET DITCH

TO LEFT TO DRAIN

0.044

13+45

0.347

18+30

0.436 23+00

0.460

24+30

END OF ROAD. CONSTRUCT TURN AROUND,

APPLY COMPACTED CRUSHED ASHTO #3 BASE

(46 TONS) AND PA2A SURFACE (23 TONS

Roadbed Details & Drawings

Allegheny National Forest

FP-14 Forest Service Supplement Specifications

Table of Contents Specifications Description Preface 101 - Terms¸ Format¸ and Definitions 102 - Bid¸ Award¸ and Execution of Contract 103 - Scope of Work 104 - Control of Work 106 - Acceptance of Work 107 - Legal Relations and Responsibility to the Public 108 - Prosecution and Progress 109 - Measurement and Payment 151 - Mobilization 153 - Contractor Quality Control 155 - Schedules for Construction Contracts 156 - Public Traffic 157 - Soil Erosion and Sediment Control 201 - Clearing and Grubbing 204 - Excavation and Embankment 230 - Roadside Brushing 301 - Untreated Aggregate Courses 303 - Road Reconditioning 602 - Culverts and Drains 625 - Turf Establishment 703 - Aggregate

Specifications Description

The following specifications will be used for this contract:

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects – FP-14 U.S. Customary Units. FP-14 is available on the internet at the following site:

http://flh.fhwa.dot.gov/resources/pse/specs/

Supplemental Specifications – The specifications identified in this contract were prepared by the Forest Service and are a supplement to or change the FHWA specifications.

Special Project Specifications – Are specifications prepared on the Allegheny National Forest and pertain to Pennsylvania Department of Transportation nomenclature. These are designated SPS.

Preface Preface_National_12_28_2017

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.

http://flh.fhwa.dot.gov/resources/pse/specs/

101 - Terms¸ Format¸ and Definitions 101.01_National_3_15_2017

Add the following paragraph to Subsection 101.01:

101.01 Meaning of Terms.

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_National_11_9_2016

Add the following to Subsection 101.03:

101.03 Abbreviations.

(a) Acronyms.

AGAR — Agriculture Acquisition Regulations

AFPA — American Forest and Paper Association

FSAR — Forest Service Acquisition Regulations

MSHA — Mine Safety and Health Administration

NESC — National Electrical Safety Code

NIST — National Institute of Standards and Technology

WCLIB — West Coast Lumber Inspection Bureau

(f) Miscellaneous unit abbreviations.

MP — milepost location ppm — parts per million volume

STA station location

101.04_National_11_9_2016 http://www.nist.gov/

Make the following changes to Subsection 101.04:

101.04 Definitions.

Delete these definitions and replace the following:

Bid Schedule — The Schedule of Items.

Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.

Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.

Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.

Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.

Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.

Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Solicitation—(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.

Add the following definitions:

Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Forest Service — The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line — A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road — Temporary construction access built along the route of the project.

Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction.

Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.

Schedule of Items — A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards — The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid¸ Award¸ and Execution of Contract 102.00_National_11_9_2016

Delete Section 102 in its entirety.

Delete Section 102.

103 - Scope of Work 103.00_National_11_9_2016

Delete all of Section 103 except Subsection 103.01 Intent of Contract.

Delete Subsections 103.02, 103.03, 103.04, 103.05.

104 - Control of Work 104.00_National_11_9_2016

Delete Subsections 104.01, 104.02, and 104.04.

Delete Subsections 104.01, 104.02, 104.04.

104.03_National_11_4_2016

Add the following to Subsection 104.06:

104.06 Use of Roads by Contractor.

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

106 - Acceptance of Work

106.01_National_7_18_2017

Delete Subsection 106.01 and replace with the following:

106.01 Conformity with Contract Requirements.

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is stricter.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range.

The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project.

When the Government tests work, copies of test reports are furnished to the Contractor upon request.

Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive.

The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work;

providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

1. Sampling method;

2. Number of samples;

3. Sample transport;

4. Test procedures;

5. Testing laboratories;

6. Reporting;

7. Estimated time and costs; and

8. Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

1. Have the work accepted at a reduced price; or

2. Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.02_National_11_9_2016

Delete Subsection 106.02 and replace with the following:

106.02 Visual Inspection.

Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.

106.07_National_11_1_2016

107 - Legal Relations and Responsibility to the Public

Delete Subsection 107.05.

107.05 Responsibility for Damage Claims.

Add the following to Subsection 107.10:

107.10 Environmental Protection.

(e) Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

• Exact time and location of spill including a description of the area involved.

• Containment procedures.

• Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress 108.00_National_11_9_2016

Delete Section 108 in its entirety.

Delete Section 108.

109 - Measurement and Payment

109.02_National_11_9_2016

Add the following sentence to Subsection 109.02(b):

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

109.00_National_11_9_2016

Delete Subsections 109.06, 109.07, 109.08, and 109.09:

109.06 Pricing and Adjustments

109.07 Eliminated Work

109.08 Progress Payments

109.09 Final Payment

109.03_National_11_1_2016

Add the following to Subsection 109.03(c):

109.03 Weighing Procedures and Devices.

(c) Project weighing system.

For aggregates weighed for payment, adjust scale weights of material to deduct the daily average moisture content in excess of 2 percentage points over optimum moisture as determined by AASHTO T 99 or the designated compaction method. If moisture determination is necessary, determine the daily average moisture content in accordance with AASHTO T 255, from not less than three representative samples of aggregate taken at random intervals each day that aggregate is being weighed.

Manual scales may be used if approved in writing by the CO and if the method of weighing meets all other contract requirements.

151 - Mobilization

151.00_ANF_01_12_2018

Delete Section 151 in its entirety and replace with the following.

Description

151.01 This work consists of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site; obtaining of permits, insurance, and bonds. This work also includes washing and treating construction equipment and vehicles necessary for equipment transport to remove seeds, plants, and plant fragments before the equipment is used on Forest Service lands, according to the requirements within.

Construction Requirements Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment. Only equipment inspected by the Forest Service will be allowed to operate within the project area. All subsequent move-ins of equipment to the project area will be treated in the same manner as the initial move-in. This requirement does not apply to cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas off the National Forest.

Equipment will be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment, components or the need for specialized inspection tools is not required.

Notify the CO in writing at least 72 hours before moving any construction equipment onto the national forest. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning.

Use methods of cleaning and locations for cleaning approved by the CO.

For work at a commercial washing facility, use an approved facility.

New infestations of noxious weeds of concern to Forest Service and identified by either Contractor or Forest Service, in the Project Area or on the haul route, will be promptly reported to the other party.

Contractor and Forest Service will agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found. A current list of noxious weeds of concern to Forest Service is available at each Forest Service office.

Measurement

151.02 Clean equipment prior to moving onto this project. The initial cleaning will not be included in the measurement for payment. Payment for cleaning will only be made if subsequent cleanings are ordered by the CO. Measurement shall be on an “each” basis, meaning one complete cleaning of all equipment required for this contract. Subsequent cleanings necessitated by the Contractor’s actions but not directed by the CO will not be included in the measurement for payment.

Measure mobilization according to Subsection 109.02.

Payment

151.03 The accepted quantity, measured as provided in Subsection 109.02, will be paid at the contract price per unit of measurement for the Section 151 pay item shown in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

Progress payments for mobilization lump sum will be paid as follows:

(a) If applicable, bond premiums will be reimbursed according to FAR Clause 52.232-5 Payments Under Fixed-Price Construction Contracts, after receipt of the evidence of payment.

(b) When 5 percent of the original contract amount is earned from other bid items, 50 percent of the mobilization item, or 5 percent of the original contract amount, whichever is less, will be paid.

(c) When 10 percent of the original contract amount is earned from other bid items, 100 percent of the mobilization item, or 10 percent of the original contract amount, whichever is less, will be paid.

(d) Any portion of the mobilization item in excess of 10 percent of the original contract amount will be paid after final acceptance.

Include all costs associated with the initial cleaning of equipment in the unit bid price for Mobilization.

Cleaning for subsequent move-ins will not be paid for unless after a suspension ordered by the CO.

151.00_ANF_01_17_2018

151.02 Clean equipment prior to moving onto this project. The initial cleaning will not be included in the measurement for payment. Payment for cleaning will only be made if subsequent cleanings are ordered by the CO. Measurement shall be on an “each” basis, meaning one complete cleaning of all equipment required for this contract. Subsequent cleanings necessitated by the Contractor’s actions but not directed by the CO will not be included in the measurement for payment.

Measure mobilization according to Subsection 109.02.

151.03 The accepted quantity, measured as provided in Subsection 109.02, will be paid at the contract price per unit of measurement for the Section 151 pay item shown in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

Progress payments for mobilization lump sum will be paid as follows:

(a) When 5 percent of the original contract amount is earned from other bid items, 50 percent of the mobilization item, or 5 percent of the original contract amount, whichever is less, will be paid.

(b) When 10 percent of the original contract amount is earned from other bid items, 100 percent of the mobilization item, or 10 percent of the original contract amount, whichever is less, will be paid.

(c) Any portion of the mobilization item in excess of 10 percent of the original contract amount will be paid after final acceptance.

Include all costs associated with the initial cleaning of equipment in the unit bid price for Mobilization.

Cleaning for subsequent move-ins will not be paid for unless after a suspension ordered by the CO.

153 - Contractor Quality Control 153.02_National_11_1_2016

Delete Subsection 153.02 and replace with the following:

153.02 Qualifications.

Submit the following for approval with the quality control plan:

(a) Quality control manager (QCM). Furnish a QCM who has at least 2 years’ experience in construction, inspector, quality control and material testing on construction projects of similar type and scope.

(b) Testers. Provide testers with at least one year experience in the type of sampling and testing required, and with one of the following for the type of sampling and testing performed:

(1) NICET Level II certification in highway material or equivalent state or industry certification;

(2) Certification by a regional certification program (such as Western Alliance for Quality Transportation Construction (WAQTC), Northeast Transportation Technician Certification Program (NETTCP), Southeast Task Force for Technician Training and Qualification (STFTTQ), or Multi Regional Training and Certification (M-TRAC)); or

(3) At least one year employment by an AASHTO accredited laboratory performing equivalent sampling and testing.

153.03_National_11_1_2016

Add the following paragraph to the end of Subsection 153.03(b):

153.03 Quality Control Plan.

(b) Quality Control Procedures.

Submit written proposals for approval of alternate AASHTO or State approved test methods. Alternate methods may be allowed based on documented equivalence to the specified method.

153.07_National_11_1_2016

Delete Subsection 153.07 and replace with the following:

153.07 Records and control charts.

Maintain complete testing and inspection records by pay item number and make them accessible to the

CO.

153.07_ANF_03_04_2019

Add the following.

153.07. Project Submittals

At a minimum the contractor shall provide project submittals as shown on the below Submittal Log.

Submittal requirements are listed in the Standard Specifications, Supplemental Specifications, and Plans.

Submittal Log

Log No.

Incidental to Pay Item(s)

Description of Submittal

Type of

Submittal

Specification No. /

Drawings

1 C Safety Plan Plan Section C.6 (g)

Weed Free Material Source Certification

Material Certification

FSSS 105.02(b)

3 151 Hazardous Spill Plan Plan FSSS 107.10 4 151 Contractor Quality Control Plan Plan 153.02 5 156 Traffic Control Plan Plan FSSS 156.03

Dewatering and Soil Erosion and Sediment Control Plan

Plan

FSSS 157.03

Material Moisture/Density Testing

Test Results

Table 204-1

Structural Backfill Compaction Testing

Test Results

204.11

Seed Mix

Material Certification

FSSS 622.02

155 - Schedules for Construction Contracts 155.00_National_11_9_2016

Delete Section 155 in its entirety.

Delete Section 155.

156 - Public Traffic 156.00_National/ANF_11_4_2016

Delete Section 156 in its entirety and replace with the following:

Section 156. – PUBLIC TRAFIC Description

156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.

Material

156.02 Conform to the MUTCD and the following Sections and Subsections:

Permanent Traffic Control 633

Traffic Signing and Marking Material 718

Concrete Barriers and Precast Guardwalls 618

Temporary plastic fence 710.11

Construction Requirements

156.03 General. Accommodate traffic according to MUTCD, approved traffic control plan and this section. Perform work in a manner that ensures safety and convenience of the public. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed 60 minutes at any one time. Accommodate public traffic on roads adjacent to and within the project until the project is accepted according to Subsection 106.07(b).

Submit traffic control plan at least 30 days prior to intended use. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved.

Post construction signs and traffic control devices in conformance with MUTCD and Forest Service EM 7100-15. All required signs will be in place and approved prior to beginning work on project.

If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.

156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:

(a) Furnish and install traffic control devices before the start of construction operations.

(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.

(c) Install only those traffic control devices needed for each stage or phase.

(d) Relocate temporary traffic control devices as necessary.

(e) Remove devices that no longer apply to the existing conditions.

(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.

(g) Keep temporary traffic control devices clean.

(h) Remove all temporary traffic control devices upon contract completion or when approved.

(i) When required, use flaggers certified by the American Traffic Safety Services Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.

156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.

Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.

Table 156-1 Temporary Road Closures

Road Number

From Terminus To Terminus

Maximum Consecutive Days of Closure

Minimum Consecutive Days Open

Open Roads to Public adjacent to the project area will Not Be Closed during construction

0+00 (0.00 miles)

85+00 (1.61 miles)

During construction hours:

M-F 7-5:30 pm

2 – Road is managed as restricted

561A 0+00 (0.00 miles)

62+50 (1.18 miles)

During construction hours:

M-F 7-5:30 pm

2 – Road is managed as restricted

0+00 (0.00 miles)

70+50 (1.33 miles)

During construction hours:

M-F 7-5:30 pm

2 – Road is managed as restricted

211A 0+00 (0..00 miles)

24+30 (0.46 miles)

During construction hours:

M-F 7-5:30 pm 0 – New corridor

156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.

Measurement and Payment

156.07 Do not measure Public Traffic for payment. Payment for contract work is provided indirectly.

See Subsection 109.05.

157 - Soil Erosion and Sediment Control

157.03_ANF_02_13_2018

157.03 Qualifications.

Delete entire Subsection

157.04_ANF_02_13_2018

157.04 General

Delete Subsection 157.04 and replace with the following:

At the prework meeting, or at least 15 days prior to the start of construction, submit a written plan for review and CO approval that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction, including a dewatering and rewatering plan for work in live streams. Do not begin work until the necessary controls for that particular phase of work have been implemented.

Include methods to minimize disturbance to streams and prevent runoff from the construction site entering directly into streams. The “Soil Erosion Control Plan” must address all construction activities that have the potential for stream sedimentation.

During construction, do not modify the type, size, or location of any accepted control or practice without approval. Reflect in the Erosion Control Plan special concerns and measures necessary to protect resources and government improvements. Include:

(a) The construction activities and sequence of implementation relating to specific erosion control measures.

(b) The location and type of permanent controls to be implemented during construction.

(c) The location and type of temporary controls to be implemented during construction.

(d) For work in stream channels with running water a detailed dewatering plan.

(e) For work in stream channels without flowing water describe level of ground and vegetative disturbance and measures to reduce potential sediment delivery.

(f) Description of the monitoring plan.

When erosion control measures are not functioning as intended, take corrective action to eliminate or minimize pollutants in storm water discharges from the project.

Upon completion of construction at the site, remove all temporary erosion control devices, dewatering materials and equipment from Government property.

157.09_ANF_02_13_2018

157.09 Water Crossings.

Add the following:

At any channel crossing where there is running water, dewater by rerouting water flow around the site before and during excavation and embankment operations.

157.10 Diversions.

Add the following:

Dewater as follows:

(a) Dewatering.

Excavation activities shall be in accordance with section 204.

(1) Stream Bypass Dam and Pipe or Channel. Construct a dam and bypass pipe to divert the stream water around the excavation. A channel lined with an impermeable membrane may be substituted for the bypass pipe when approved by the CO, however, a water crossing shall be constructed according to 157.08 whenever construction vehicles are crossing a live waterway.

(2) Sump Hole and Pumping. Construct a sump hole that will store enough water that over flowing does not occur. The sump hole shall be lined with an impermeable membrane. Install pump(s) as required to re-route stream around construction site or as a back-up method to collect seepage. When pumping is the primary diversion method, install a pump that has a pumping capacity greater than the flow of the stream. When failure of a pump would result in movement of sediment or turbidity beyond the working area, a back-up pump shall be readily available.

157.03_ANF_03_01_2019

201 - Clearing and Grubbing

201.04_National_11_8_2016

Delete and replace Subsection 201.04(d) with the following:

201.04(d) Clearing.

(d) Trim tree branches that extend over the road surface and shoulders to attain a clear height of 14 feet. Trim tree limbs as near flush with the trunk as practicable.

201.06_National_11_2_2016

Delete the first sentence of this Subsection 201.06 and replace the following:

201.06 Disposal.

Dispose of merchantable timber designated for removal according to the provisions of the timber sale contract.

204 - Excavation and Embankment 204.00_National_11_4_2016

Delete Section 204 in its entirety and replace with the following.

Section 204. — EXCAVATION AND EMBANKMENT

Description

204.01 This work consists of excavating material and constructing embankments. This work also includes furnishing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material.

204.02 Definitions.

(a) Excavation. Excavation consists of the following:

(1) Roadway excavation. Material excavated from within the right-of-way or easement areas, except subexcavation covered in Subsection 204.02(a)(2) and structure excavation covered in Sections 208 and 209. Roadway excavation includes all material encountered regardless of its nature or characteristics.

(2) Subexcavation. Material excavated from below subgrade elevation in cut sections or from below the original ground-line in embankment sections. Subexcavation excludes the work required by Subsection 204.05 or 204.06.

(3) Borrow excavation. Material used for embankment construction that is obtained from outside the roadway prism.

This is the start of the file's text. The full file is on GovTribe.