J01f Data Network Configuration Map.pdf
PDF 8 MB Posted
- Solicitation number
- 75H701-24-R-00027
About this file
This document appears to be an attachment, labeled "J01f Data Network Configuration Map", related to a federal contract opportunity for the Relocate and Install two (2) existing Elko Mobile Units project.
The attachment provides a detailed data network configuration map for the mobile units, including information on fiber optic cable runs, CAT6 cable routing, network equipment, and server cabinet specifications. It also includes electrical plans for the mobile units, detailing the power distribution, receptacles, lighting, and electrical panel information.
The related federal contract opportunity is Solicitation Number 75H701-24-R-00027, issued by the Department of Health and Human Services Indian Health Service. The scope of work involves relocating and installing two existing mobile units at the Southern Bands Health Center in Elko, Nevada. The contract is a Firm Fixed Price (FFP) construction project with a period of performance of 150 calendar days. The contract will be awarded as a 100% Small Business set-aside under NAICS code 236220, with a size standard of $45 million average annual revenue. A site visit is scheduled for June 4, 2024.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3/11/2021 Google Maps https://www.google.com/maps/@40.8477741,-115.7654201,138m/data=!3m1!1e3 1/1
Imagery ©2021 Maxar Technologies, Map data ©2021 50 ft
Attachment J01f - Data Network Configuration Map
PH21EK01C7, Elko Mobile Units Page 1 of 4 vclashin Callout SBHC, MDF Room; 12 Pairs(24 strands) OM4 Patch Panel terminated with LC Connectors vclashin Callout
IHS # 1
vclashin Polygon vclashin Callout
OWS # 1
vclashin Callout
OWS # 2
vclashin Polygon vclashin Polygon vclashin PolyLine vclashin PolyLine vclashin Callout OWS # 1; 6 pairs(12 strands) OM4 Patch Panel with LC Connectors vclashin Callout IHS # 1; 6 pairs (12strands) OM4 Patch Panel terminated with LC Connectors vclashin Rectangle vclashin Rectangle vclashin Rectangle vclashin Rectangle vclashin Rectangle
Attachment J01f - Data Network Configuration Map
PH21EK01C7, Elko Mobile Units Page 2 of 4
2- 1/
TO
N
K W
WH-1 WH-3
#1&3
WMU-1
WP
GFCI
#5
HEAT TAPE
RECEPTACLE MOUNT
UNDER FLOOR
16/32 SPACE 125A 1Ø INTERIOR FLUSH
MOUNT "MAIN" ELECTRICAL PANEL;
MAIN BREAK TO BE MAX. 72" A.F.F.
+42"
GFCI
+42"
GFCI
#4 #8
+42"
GFCI
#7#12
#9
#10
GFCI
GFCI
WH-2
#6 of
SHEET
DATE.
EL
EC
TR
IC
AL
P
LA
N
S H E E T C
O N T E N T S
R E V I S I O
N S
D A T E
NOTE: UNAUTHORIZED USE OF THIS
ADVANCED MODULAR MANUFACTURING
PLAN, OR MAKING COPIES OF THIS
PLAN, IS PROHIBITED BY LAW.
WRITTEN PERMISSION FROM ADVANCED
MODULAR MANUFACTURING IS REQUIRED
TO REPRODUCE ANY PART OF THIS PLAN.
ELECTRICAL PLAN
HI
TC
H-
EN
D
(1
NORTH ARROW IS FOR
MANUFACTURING
PURPOSES ONLY.
N
2 7
AD
VA
NC
ED
MO
DU
LA
R M
AN
UF
AC
TU
RIN
G
A MM
SO
UT
H
LE
GA
CY
V
IE
W
ST
RE
ET
SA
LT
L
AK
E
CI
TY
, U
TA
H
PH
(8
) 5
-9
FA
X (8
) 4
-7
C H E C K E D B
Y C .J
.J
D R A W
N B
Y T H E G
H O
S T
GROUND WIRE
DEVICE
DEVICE BOX
1/2" EMT
PANEL
GROUNDING WIRE
GROUNDING BUSS
GROUND ROD
(3/4" Ø X 10'-0")
(INSTALL ADDITIONAL GROUND
RODS, ONE (1) AT EACH CORNER
OF THE STRUCTURE
GROUND WIRE (#2/0 INSULATED
COPPER OR LARGER)
BUILDING FRAME
DEVICE GROUNDING DETAIL
/2
1/
SCALE:
1/4"=1'-0"
ELECTRICAL SPECIFICATIONS
1. ALL WIRING TO COMPLY WITH CODES LISTED ON SHEET 1.
2. ALL WIRING IN EXAM ROOMS TO BE IN MC CABLE (HOSPITAL CARE FACILITY RATED) OR
'ALLIED' "EZ-PULL" EMT CONDUIT.
WIRING IN REMAINDER TO BE IN 'ENCORE' MC CABLE OR 'ALLIED' "EZ-PULL" EMT CONDUIT.
ALL WIRE/CONDUCTORS TO BE #12 OR LARGER.
ALL WIRING MEETS ALL CURRENT NEC REQUIREMENTS INCLUDING NEC 517.
3. LIGHTS: SEE REFLECTED CEILING PLAN, SHEET 3.
4. COVER PLATES: ALL TO BE UNBREAKABLE NYLON (COLOR: TO MATCH DEVICE)
5. RECEPTACLES: 'PASS & SEYMOUR'
20 AMP DUPLEX TYPE @ 18" AFF. (U.N.O.) (COLOR: WHITE);
20 AMP DOUBLE DUPLEX TYPE @ 18" AFF. (U.N.O.) (COLOR: WHITE).
NOTES: (A) ALL DEVICES IN EXAM ROOMS TO BE TAMPER-RESISTANT HOSPITAL GRADE.
(B) ALL DEVICES IN REMAINDER OF BUILDING TO BE TAMPER-RESISTANT.
(C) WET AREA(S) TO BE GFCI PROTECTED.
(D) INSTALL DEDICATED RECEPTACLE UNDER BUILDING ON GFEP BREAKER FOR HEAT TAPE (120V, 960W).
(C) EXTERIOR RECEPTACLES TO BE WEATHER-RESISTANT (WR) TYPE.
(D) PROVIDE "WHILE-IN-USE" COVERS IN ALL EXTERIOR RECEPTACLES.
6. COMMUNICATION JACKS:
4-SQ. W/ SINGLE GANG MUD RING @ 18" AFF. U.N.O. STUB 3/4" EMT INTO CEILING CAVITY.
7. JUNCTION BOXES:
4-SQ. AS SHOWN ON PLAN; CAP WIRES, COVER AND LABEL COVER W/ CIRCUIT NUMBER.
8. ELECTRICAL PANEL:
'SIEMENS' #SN1632B1125 (SN SERIES, 120/240v, 125A, 1PH, NEMA 1) 16/32 SPACE LOAD
CENTER W/ 'SIEMENS' "QP" 10,000A IR STYLE SNAP-IN BREAKERS; (TOTAL: 1).
9. HIDDEN LINE DENOTES RECEPTACLE CIRCUITS.
10. DIMENSIONS ARE TO BOTTOM OF BOX U.N.O.
11. ALL DEDICATED CIRCUITS CALCULATED AT 960WATTS 8AMPS.
12. SEE SHEET 4 FOR WATER HEATER (WH) SPECS.
13. SEE SHEET 4 FOR WALL MOUNT HVAC (WMU) SPECS.
PR
ES
EN
TE
D B
Y:
PR
O
JE
CT
T
IT
LE
NOTE:
THE FACTORY PROVIDES 1 PANEL W/CONDUIT STUB OUT
BOTTOM. PERMANENT POWER PROVIDED TO PANELS ON SITE BY
OTHERS. FACTORY TAKES NO RESPONSIBILITY FOR
PROBLEMS RESULTING FROM IMPROPER SITE INSTALLATION.
J
SEPTEMBER 09, 2021
MO
DU
LA
R
OF
FI
CE
' x
0'
PA
CI
FI
C
MO
BI
LE
S
TR
UC
TU
RE
S
- B
OI
SE
, I D.
IN
DI
AN
H
EA
LT
H
SE
RV
IC
ES
(I
HS
NOTE: STUB ONE (1) SPARE 1" EMT CONDUIT & TWO (2) SPARE 3/4"
EMT CONDUITS INTO CEILING CAVITY & THRU FLOOR
FROM PANEL FOR FUTURE USE BY OWNER.
NOTE:
BARD UNITS HAVE AN INTERNAL
DISCONNECT BEHIND A MARKED
ACCESS PANEL.
PMS1440IHS
NO.
POLES
TOTAL CONNECTED LOAD KVA TOTAL CONNECTED LINE AMPS
FEEDER: 2" CONDUIT OUT BOTTOM W/ (2) #1, (1) #1 NEUT & (1) #6 GND
A AIC SYMMETRICAL
NO.
CIRC
AMPS
TRIP
12,984
BA
PHASE LOAD-VA
NO.
CIRC TRIP
POLESAMPS
NO.
3 4
PANEL
VOLTS PHASE , WIRES120/240 1 4 125 10,000MCB
"MAIN"
LOAD SERVED
5 6 7 8 9 10 11 12
15,110
LOAD SERVED
* HVAC (WMU-1)60 2 6670
HEAT TAPE20 1 960
-- - 6670 WTR. HTR.(WH-1) 30 13500
RECEPTACLES20 1 720
13 14 15 16
GFEP
117.128.09
WTR. HTR.(WH-2) 30 13500
LIGHTING 20 1414
RECEPTACLES 20 1720
RECEPTACLES 20 1720
NOTE: FEEDER WIRES TO BE PROVIDE ON SITE BY OTHERS.
* BREAKER & WIRE/CONDUCTOR SIZE SHALL BE
CHECKED & CHANGED, IF REQUIRED, AFTER
EQUIPMENT HAS BEEN PURCHASED.
RECEPTACES20 1 720
WTR. HTR.(WH-3) 30 13500 *
(2
/0
1/
Attachment J01f - Data Network Configuration Map
PH21EK01C7, Elko Mobile Units Page 3 of 4
Attachment J01f - Data Network Configuration Map
PH21EK01C7, Elko Mobile Units Page 3 of 4
AutoCAD SHX Text
ESTCODE
vclashin Rectangle vclashin Line vclashin Text Box Keynotes 1.Fiber optic cable in 1” conduit to IHS # 1.
2.CAT6 cable runs to each data outlet location from Office 1.1, typical.
3.CAT6/RJ45 outlet with dual port covers, typical.
4.Server Cabinet, IHS # 1, mounted 84" AFF, by others.
5.Route (1) 1” conduit with fiber optic cable to SBHC existing MDF room.
vclashin Callout vclashin Callout vclashin Callout vclashin Callout vclashin Callout vclashin Callout
Cat 6 Patch Panel
01X 12X 13X 24X G 1 G 2 G 3 G 4
Catalyst 9300L 24 PoE+ 4xG
Cat 6 Patch Panel
FAN
STATUS
Catalyst
4510R+E
S U
P E
R V
IS
O
R S
U P
E R
V
IS
O R
WS-X4748-UPOE+E
STATUS
13 15 17 14 16 18
19 21 23 20 22 24
242322212019181716151413
1 3 5 2 4 6
7 9 11 8 10 12
121110987654321
MULTI-SPEED
GIGABIT ETHERNET
SWITCHING MODULE
37 39 41 38 40 42
43 45 47 44 46 48
484746454443424140393837
31 33 35 32 34 36
25 27 29 26 28 30
363534333231302928272625
“+E”
SERIES
POWER OVER
ETHERNET
IEEE 802.3
POE
48-PORT
10/100/1000 BASE-T
POWER OVER ETHERNET
WS-X4748-UPOE+E
STATUS
13 15 17 14 16 18
19 21 23 20 22 24
242322212019181716151413
1 3 5 2 4 6
7 9 11 8 10 12
121110987654321
MULTI-SPEED
GIGABIT ETHERNET
SWITCHING MODULE
37 39 41 38 40 42
43 45 47 44 46 48
484746454443424140393837
31 33 35 32 34 36
25 27 29 26 28 30
363534333231302928272625
“+E”
SERIES
POWER OVER
ETHERNET
IEEE 802.3
POE
48-PORT
10/100/1000 BASE-T
POWER OVER ETHERNET
WS-X4748-UPOE+E
STATUS
13 15 17 14 16 18
19 21 23 20 22 24
242322212019181716151413
1 3 5 2 4 6
7 9 11 8 10 12
121110987654321
MULTI-SPEED
GIGABIT ETHERNET
SWITCHING MODULE
37 39 41 38 40 42
43 45 47 44 46 48
484746454443424140393837
31 33 35 32 34 36
25 27 29 26 28 30
363534333231302928272625
“+E”
SERIES
POWER OVER
ETHERNET
IEEE 802.3
POE
48-PORT
10/100/1000 BASE-T
POWER OVER ETHERNET
WS-X4748-UPOE+E
STATUS
13 15 17 14 16 18
19 21 23 20 22 24
242322212019181716151413
1 3 5 2 4 6
7 9 11 8 10 12
121110987654321
MULTI-SPEED
GIGABIT ETHERNET
SWITCHING MODULE
37 39 41 38 40 42
43 45 47 44 46 48
484746454443424140393837
31 33 35 32 34 36
25 27 29 26 28 30
363534333231302928272625
“+E”
SERIES
POWER OVER
ETHERNET
IEEE 802.3
POE
48-PORT
10/100/1000 BASE-T
POWER OVER ETHERNET
WS-X4748-UPOE+E
STATUS
13 15 17 14 16 18
19 21 23 20 22 24
242322212019181716151413
1 3 5 2 4 6
7 9 11 8 10 12
121110987654321
MULTI-SPEED
GIGABIT ETHERNET
SWITCHING MODULE
37 39 41 38 40 42
43 45 47 44 46 48
484746454443424140393837
31 33 35 32 34 36
25 27 29 26 28 30
363534333231302928272625
“+E”
SERIES
POWER OVER
ETHERNET
IEEE 802.3
POE
48-PORT
10/100/1000 BASE-T
POWER OVER ETHERNET
WS-X45-SUP8-E
STATUS
RESET
USB
CONSOLE
10/100/1000
MGT
LINK
DC
STATUS
ID
1% 100%
UTILIZATION
SECURE DIGITAL
SD
ACTIVE
SUP
1-2 ACTIVE 3-4 ACTIVE 5-8 ACTIVE
1 2 3 4 5 6 7 8
WS-X45-SUP8-E
STATUS
RESET
USB
CONSOLE
10/100/1000
MGT
LINK
DC
STATUS
ID
1% 100%
UTILIZATION
SECURE DIGITAL
SD
ACTIVE
SUP
1-2 ACTIVE 3-4 ACTIVE 5-8 ACTIVE
1 2 3 4 5 6 7 8
6000ACV
POE ENABLEDOUTPUT FAIL
FAN OK
INPUT 1
OK
INPUT 2
OK
O I
O I
SWITCHES SHOULD BE IN THE OFF ‘O’ POSITION TO INSTALL /
REMOVE POWER SUPPLIES. FASTENERS MUST BE FULLY ENGAGED
PRIOR TO OPERATING POWER SUPPLY100-240V~ 12A
220-240V~ 16A 50/60 Hz
100-120V~ 12A/200-240V~ 16A (For Japan)
100-240V~ 12A
220-240V~ 16A 50/60 Hz
100-120V~ 12A/200-240V~ 16A (For Japan)
+V IN GND FB
6000ACV
POE ENABLEDOUTPUT FAIL
FAN OK
INPUT 1
OK
INPUT 2
OK
O I
O I
SWITCHES SHOULD BE IN THE OFF ‘O’ POSITION TO INSTALL /
REMOVE POWER SUPPLIES. FASTENERS MUST BE FULLY ENGAGED
PRIOR TO OPERATING POWER SUPPLY100-240V~ 12A
220-240V~ 16A 50/60 Hz
100-120V~ 12A/200-240V~ 16A (For Japan)
100-240V~ 12A
220-240V~ 16A 50/60 Hz
100-120V~ 12A/200-240V~ 16A (For Japan)
+V IN GND FB
01X 12X 13X 24X G 1 G 2 G 3 G 4
Catalyst 9300L 24 PoE+ 4xG
12 Pairs(24 strands) OM4 Patch Panel terminated with
LC Connectors
SmartRack 9U Low-Profile Switch-Depth Wall-Mount
Mini Rack Enclosure Part Number: SRW9
IT room Equipment
TRIPP LITE SMART2200RM2U Tripp Lite UPS Smart 2200VA 1920W Rackmount AVR Pure Sign Wave 100V/110V/120V USB
DB9 2URM 8 OUT 2URM LCD USB DB9 RS232 EPO
TRIPP LITE SRW9U Tripp Lite 9U Wall Mount Rack Enclosure Server Cabinet w/ Door & Side Panels SERVER
CABINET WALLMOUNT W DOORS
TRIPP LITE 2POSTRMKITWM Tripp Lite 2-Post Rackmount / Wallmount Installation Kit for select Rackmount UPS Systems 2U
ADAPTER KIT RACK MOUNT UPS BP
6 pairs(12 strands) OM4 Patch Panel with LC
Connectors
6 pairs (12strands) OM4 Patch Panel terminated with LC Connectors
Cat 6 cabling, terminated, Cat6 rated wall plate at each work station.(30- runs 2 at each drop) Conduit to next building, patch Cat 6 from Panel to wall plates.
Cat 6 cabling, terminated, Cat6 rated wall plate at each work station.(16- runs
2 at each drop)
Attachment J01f - Data Network Configuration Map
PH21EK01C7, Elko Mobile Units Page 4 of 4
Attachment J01f - Data Network Configuration Map
PH21EK01C7, Elko Mobile Units Page 4 of 4
File details come from the government source that posted it. Updated .