J01 SOW SBSWM Repl.pdf

PDF 94 KB Posted

Attached to
Stephan Booster Station & WM Replace
Solicitation number
75H70125R00046
Issued by

About this file

This Statement of Work (SOW) details a federal contract for the replacement of the Stephan Booster Station and approximately 9,900 linear feet of water main serving the community of Stephan, South Dakota, located on the Crow Creek Reservation. The project is part of the Indian Health Service's Great Plains Area Office contract, with a total performance period of one (1) year from the site substantial completion date, specifically focused on warranty purposes as outlined in section 01430 – Quality Requirements.

The contract requires the contractor to provide all necessary labor, personnel, materials, equipment, tools, supplies, services, permits, insurance, supervision, and facilities for the infrastructure replacement. The project is set aside for Indian Small Business Economic Enterprise (ISBEE) under HHSAR 326.603-1, with an estimated construction magnitude between $1,000,000 and $5,000,000. The Indian Health Service intends to award a single Firm Fixed-Price (FFP) contract using a Lowest Price Technically Acceptable (LPTA) evaluation criteria, with the solicitation number 75H70125R00046 and NAICS code 237110 for Water and Sewer Line and Related Structures Construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section C

Statement of Work

GP-21-Z28, GP-23-T29

Stephan Booster Station and Water Main Replacement Great Plains Area Office Crow Creek Reservation

Purpose: This contract is for the contractor to furnish all labor, personnel, materials, equipment, tools, appliances, supplies, services, permits, insurance, supervision, and facilities for the replacement of the existing Stephan Booster Station and approximately 9,900 L.F. of water main, which serves the community of Stephan, South Dakota, per the attached drawings. The total performance period will be one (1) year from the site substantial completion date for warranty purposes as per section 01430 – Quality Requirements. This period of performance is for the purpose of addressing defects or deficiencies in the warranty period only and does not include punchlist items. Punchlist items are to be completed within the specified time period in the punchlist letters.