This is a Performance Work Statement (PWS) for underwater hull cleaning and zinc anode replacement services on the USCGC JOHN PATTERSON, a U.S. Coast Guard cutter. The work must be completed during the Period of Performance (POP) of June 1-5, 2026, while the vessel is moored pier-side at 427 Commercial Street, Boston, MA 02109. The primary point of contact is EMC Donald Crowell at (774) 836-6785.
The contractor must perform three primary tasks: (1) clean the vessel's underwater body surfaces free of all marine growth, debris, and contaminants in accordance with Coast Guard Maintenance Procedure Card B10015.D, including removal and replacement of sea chest grating if necessary and hand-cleaning of all transducer surfaces without power attachments; (2) renew nine categories of government-furnished zinc anodes, including stern tube anodes (28 units), sea chest grate anodes (4 units), propeller zinc plates (2 units), bow thruster gear case anodes (1 unit), and bow thruster tunnel anodes (12 units), along with associated fasteners such as self-locking nuts, screws, and screw caps (totaling 103 items); and (3) submit video recordings documenting underwater body surfaces before and after cleaning. The contractor must furnish and install all protective coverings to prevent contamination of non-affected vessel components and remove all protective measures upon work completion, ensuring no damage to existing coating systems. All work must comply with referenced Coast Guard standards, drawings, and maintenance procedure cards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAR Matrix2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U/W Body (Waterborne), Clean and Inspect, Renew Zinc Anodes
1. Scope
1.1 Intent. This work item describes the requirements for the Contractor to clean the vessel’s U/W body and to renew bolt-on zinc anodes, while the vessel is moored pier side.
1.2 Cutter, Address, Availability, and POC. USCGC JOHN PATTERSON, 427 Commercial Street Boston, MA. 02109. Period of Performance (POP): 1-5 June, 2026. Cutter POC: EMC Donald Crowell, Cell #: (774) 836-6785, Donald.c.crowell@uscg.mil
1.3 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
N Anode, stern tube P/N: Z0020202H3
NIIN: 016445483
28 ea. $11.15
N Nut, Self-Locking P/N: 90715A145 NIIN:
015085774
2 Bx *24 in a bx
$7.24
N Anode, Sea Chest Grate P/N: GA-4
NIIN: 016476179
4 ea. $21.93
N Screw, Prop zinc plate P/N: 950756
NIIN: 016340210
8 ea. $9.42
N Screw, Sea Chest Grate Anode, P/N: 93190A634 NIIN:
016197182
4 ea. $9.70
N Screw Cap, Stern Tube Covers
P/N: 90585A626 NIIN:
016161107
42 ea. $1.81
N Zinc plate, propeller P/N: 950733
NIIN: 016278941
2 ea. $618.85
N Anode, Bow Thruster, Gear Case, Bolt On
P/N: 1081226
NIIN: 123561870
1 ea. $64.97
N Anode, Bow Thruster, Tunnel, Bolt On
P/N: CM2000Z NIIN:
200126334
12 ea. $29.46
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 154B WPC 111-301, Rev A, Shell Expansion Coast Guard Drawing 154B WPC 161-301, Rev -, Skegs and Stern Tubes Support Structures Coast Guard Drawing 154B WPC 562-201, Rev -, Rudder Details Coast Guard Drawing 154 WPC 565-201, Rev -, Fin Stabilizer System A & D Coast Guard Drawing 154B WPC 568-201, Rev B, Bow Thruster System A & D
Coast Guard Drawing 154 WPC 997-302, Rev -, Docking Plan
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Maintenance Procedure Card B10015.D (MPC B10015.D), 10/31/24, Insp/Cln U/W Equipment (Hull Plate) Surface Forces Logistics Center Maintenance Procedure Card B10018.D (MPC B10018.D), 5/31/23, Replace Underwater Zinc Anodes
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not Applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor must remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Requirements. The Contractor must:
3.2.1 Video recording. Submit video highlights of underwater body surfaces (e.g. bow thruster, propellers, rudders, transducers, heavily fouled hull areas, etc.) before and after cleaning.
3.2.2 Clean/inspect. Clean the U/W body surfaces free of all marine growth, debris, and all other surface contaminants in accordance with MPC B10015.D. Remove and replace sea chest grating if necessary to access/clean sea chest suction. Ensure all transducer surfaces are cleaned with only hand held brushes, without the use of power attachments. Ensure that existing u/w body coating system or non-coated surfaces do not incur any damage during cleaning process. Polish propellers. Refer to Coast Guard drawings listed in Section 2.
3.2.3 Renew anodes. Renew Government-furnished components listed below paragraph 1.2. in accordance with MPC B10018.D. Anodes may require slight modification to ensure proper fit (ie., trimming metal tabs, drilling tab bolt holes).
4. NOTES
This section is not applicable to this work item.
| 1. Scope |
| 2. REFERENCES |
| COAST GUARD DRAWINGS |
| COAST GUARD PUBLICATIONS |
3. REQUIREMENTS
File details come from the government source that posted it. Updated .