J.P-6 Past Performance Rating Form (Amd 0008).pdf
PDF 156 KB Posted
- Attached to
- One Acquisition Solution for Integrated Services Plus (OASIS+) Total Small Business Set-Aside Continuously Open Federal contract opportunity
- Solicitation number
- 47QRCA23R0001-P2
- Issued by
- GSA Federal Acquisition Service
About this file
This document is a Past Performance Rating Form (Attachment J.P-6), designed to evaluate a contractor's performance across five key criteria: Technical Quality of Service, Cost Control, Schedule/Timeliness, Management/Business Relations, and Small Business Subcontracting. The form provides a standardized mechanism for rating contractor performance using an adjectival rating scale ranging from Exceptional to Unsatisfactory for each evaluation criterion.
The rating form requires detailed input from both the contractor (in the Project Identification section) and the rater (typically a Contracting Officer, Representative, or Government employee). For each performance criterion, the rater must select an appropriate rating and can provide additional comments, particularly for Marginal or Unsatisfactory ratings. The form is specifically structured for Federal Prime Contract Awards and includes specific considerations for small business participation, with emphasis on meeting statutory goals, utilization of various small business categories, and compliance with Federal Acquisition Regulation (FAR) requirements.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT J.P-6
PAST PERFORMANCE RATING FORM
PAST PERFORMANCE PROJECT IDENTIFICATION (To be filled out by the Offeror):
CONTRACTOR NAME:
CONTRACT NUMBER:
ORDER NUMBER (if applicable):
PROJECT TITLE:
PROJECT VALUE:
TOTAL PERIOD OF
PERFORMANCE, INCLUDING
OPTIONS (MM/YYYY - MM/YYYY or MM/YYYY – Present):
PAST PERFORMANCE REFERENCE INFORMATION (To be filled out by the Rater):
NAME:
TITLE:
AGENCY / CUSTOMER:
PHONE:
E-MAIL:
SIGNATURE OF RATER (Rating must be provided by the Contracting Officer, Contracting Officer’s Representative, Contracting Officer’s Technical Representative, other Government employee or Corporate Officer/Official of the customer with cognizance over the submitted Project):
For each of the five (5) criteria listed below, the rater must choose one (1) Adjectival Rating by checking the box, as applicable. At a minimum, for any rating that is checked Marginal or Unsatisfactory, please submit additional comments to substantiate the rating. For any rating that is checked “Not Applicable,” please explain why it does not apply.
1. Technical (QUALITY OF SERVICE)
Rating Adjectival Rating Definition
☐ Exceptional Performance meets contractual requirements and exceeds many to the Government’s/customer’s benefit. The contractual performance of the element or subelement being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
☐ Very Good Performance meets contractual requirements and exceeds some to the Government’s/customer’s benefit. The contractual performance of the element or subelement being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
☐ Satisfactory Performance meets contractual requirements. The contractual performance of the element or subelement contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
☐ Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or subelement being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
☐ Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
☐ Not Applicable
ADDITIONAL COMMENTS:
2. COST CONTROL
Rating Adjectival Rating Definition
☐ Exceptional Performance meets contractual requirements and exceeds many to the Government’s/customer’s benefit. The contractual performance of the element or subelement being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
☐ Very Good Performance meets contractual requirements and exceeds some to the Government’s/customer’s benefit. The contractual performance of the element or subelement being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
☐ Satisfactory Performance meets contractual requirements. The contractual performance of the element or subelement contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
☐ Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or subelement being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
☐ Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
☐ Not Applicable
Source Selection Information – See FAR 2.101 and 3.104
ADDITIONAL COMMENTS:
3.SCHEDULE/TIMELINESS
Rating Adjectival Rating Definition
☐ Exceptional Performance meets contractual requirements and exceeds many to the Government’s/customer’s benefit. The contractual performance of the element or subelement being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
☐ Very Good Performance meets contractual requirements and exceeds some to the Government’s/customer’s benefit. The contractual performance of the element or subelement being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
☐ Satisfactory Performance meets contractual requirements. The contractual performance of the element or subelement contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
☐ Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or subelement being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
☐ Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
☐ Not Applicable
ADDITIONAL COMMENTS:
4. MANAGEMENT OR BUSINESS RELATIONS
Rating Adjectival Rating Definition
☐ Exceptional Performance meets contractual requirements and exceeds many to the Government’s/customer’s benefit. The contractual performance of the element or subelement being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
☐ Very Good Performance meets contractual requirements and exceeds some to the Government’s/customer’s benefit. The contractual performance of the element or subelement being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
☐ Satisfactory Performance meets contractual requirements. The contractual performance of the element or subelement contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
☐ Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or subelement being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
☐ Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
☐ Not Applicable
ADDITIONAL COMMENTS:
5. SMALL BUSINESS SUBCONTRACTING (including reduced or untimely payments to small business) (Only applicable to Federal Prime Contract Awards)
Rating Adjectival Rating Definition
☐ Exceptional
Exceeded all statutory goals or goals as negotiated. Had exceptional success with initiatives to assist, promote, and utilize small business (SB), small disadvantaged business (SDB), women-owned small business (WOSB), HUBZone small business, veteran-owned small business (VOSB) and service disabled veteran owned small business (SDVOSB). Complied with FAR 52.219-8, Utilization of Small Business Concerns. Exceeded any other small business participation requirements incorporated in the contract/order, including the use of small businesses in mission critical aspects of the program. Went above and beyond the required elements of the subcontracting plan and other small business requirements of the contract/order. Completed and submitted Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate and timely manner. Did not have a history of three or more unjustified reduced or untimely payments to small business subcontractors within a 12-month period.
☐ Very Good
Met all of the statutory goals or goals as negotiated. Had significant success with initiatives to assist, promote and utilize SB, SDB, WOSB, HUBZone, VOSB, and SDVOSB. Complied with FAR 52.219- 8, Utilization of Small Business Concerns.
Met or exceeded any other small business participation requirements incorporated in the contract/order, including the use of small businesses in mission critical aspects of the program. Endeavored to go above and beyond the required elements of the subcontracting plan. Completed and submitted Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate and timely manner. Did not have a history of three or more unjustified reduced or untimely payments to small business subcontractors within a 12-month period.
☐ Satisfactory
Demonstrated a good faith effort to meet all of the negotiated subcontracting goals in the various socio-economic categories for the current period. Complied with FAR 52.219-8, Utilization of Small Business Concerns. Met any other small business participation requirements included in the contract/order. Fulfilled the requirements of the subcontracting plan included in the contract/order.
Completed and submitted Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate and timely manner. Did not have a history of three or more unjustified reduced or untimely payments to small business subcontractors within a 12-month period.
☐ Marginal
Deficient in meeting key subcontracting plan elements. Deficient in complying with FAR 52.219-8, Utilization of Small Business Concerns, and any other small business participation requirements in the contract/order. Did not submit Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate or timely manner. Failed to satisfy one or more requirements of a corrective action plan currently in place; however, does show an interest in bringing performance to a satisfactory level and has demonstrated a commitment to apply the necessary resources to do so. Required a corrective action plan.
Did not have a history of three or more unjustified reduced or untimely payments to small business subcontractors within a 12-month period.
☐ Unsatisfactory
Noncompliant with FAR 52.219-8 and 52.219-9, and any other small business participation requirements in the contract/order. Did not submit Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate or timely manner. Showed little interest in bringing performance to a satisfactory level or is generally uncooperative. Required a corrective action plan. Had a history of three or more unjustified reduced or untimely payments to small business subcontractors within a 12-month period.
☐ Not Applicable
ADDITIONAL COMMENTS:
5. Other (as applicable) (e.g., trafficking violations, tax delinquency, failure to report in accordance with contract terms and conditions, defective cost or pricing data, terminations, suspension and debarments, and failure to comply with limitations on subcontracting).
Rating Adjectival Rating Definition
☐ Exceptional Performance meets contractual requirements and exceeds many to the Government’s/customer’s benefit. The contractual performance of the element or subelement being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
☐ Very Good Performance meets contractual requirements and exceeds some to the Government’s/customer’s benefit. The contractual performance of the element or subelement being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
☐ Satisfactory Performance meets contractual requirements. The contractual performance of the element or subelement contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
☐ Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or subelement being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
☐ Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
☐ Not Applicable
ADDITIONAL COMMENTS:
| CONTRACTOR NAME: |
| CONTRACT NUMBER: |
| ORDER NUMBER if applicable: |
| PROJECT TITLE: |
| PROJECT VALUE: |
| TOTAL PERIOD OF PERFORMANCE INCLUDING OPTIONS MMYYYY MMYYYY or MMYYYY Present: |
| NAME: |
| TITLE: |
| AGENCY CUSTOMER: |
| PHONE: |
| EMAIL: |
| ADDITIONAL COMMENTS: |
| ADDITIONAL COMMENTS_2: |
| ADDITIONAL COMMENTS_3: |
| ADDITIONAL COMMENTS_4: |
| ADDITIONAL COMMENTS_5: |
| ADDITIONAL COMMENTS_6: |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Check Box31: Off |
| Check Box32: Off |
| Check Box33: Off |
| Check Box34: Off |
| Check Box35: Off |
| Check Box36: Off |
| Check Box37: Off |
File details come from the government source that posted it. Updated .