J.3 Experience Questionnaire (3 Pages) Northern Hills Roof Replacement.pdf

PDF 140 KB Posted

Attached to
Northern Hills Roof Replacement Federal contract opportunity
Solicitation number
1240LT23Q0129
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

About this file

This document is an experience questionnaire for a roof replacement project solicitation issued by the USDA Forest Service. The solicitation is for the Northern Hills Roof Replacement project located on the Black Hills National Forest. The experience questionnaire requests information on the contractor's experience, available employees and equipment, past performance, and experience using biobased products. Details requested include the number of years of experience as a prime contractor and subcontractor, completed projects over the last three years, current contractual commitments, failures to complete work, bond claims, site visits, personnel experience, employee numbers, equipment list, production rates, biobased products to be used including manufacturer, cost, intended use, biobased content percentage, and experience specifying, purchasing, and installing biobased products for prior contracts.

View the file

Other files for this federal contract opportunity

Other files attached to Northern Hills Roof Replacement, newest first.
File Type Posted
Northen Hills Roof Replacement 1240LT23Q0129.pdf PDF
J.1 Wage Determination SD20230016 06-16-2023 6 pages.pdf PDF
J.2 SOW Northern Hill Roof Replacement Specs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: 1240LT23Q0129 Northern Hills Roof Replacement Black Hills National Forest

J.3 Experience Questionnaire

USDA Forest Service

EXPERIENCE QUESTIONNAIRE

Instructions: See Box 11, Remarks, if extra space is needed to answer any item below, Mark “X: in appropriate boxes.

1. Contractor Name, Address, and Telephone Number

2. Submitted to (Office Name and Address) 3. Business [ ] Company [ ] Co-partnership [ ] Corporation [ ] Individual [ ] Non-profit Organization

4. How many years do you or your firm have in the line of work contemplated by this solicitation?

5. How many years experience have you or your business had as a (a) prime contractor and/or (b) sub-contractor ?

6. List below the projects your business has completed within the last three years:

Contract Amount

Type of Project Date Completed

Name, Address, and Telephone No. of Owner/Person to Contact for Project Information

7. List below all of your firm’s contractual commitments running concurrently with the work contemplated by this solicitation:

Contract Number

Dollar Amt.

of Award

Name, Address, and Telephone No. of Business/Government Agency Involved

Awarded (Units)

Percent Completed

Date Contract Complete

8a. Have you ever failed to complete any work awarded to you? [ ] Yes [ ] No 8b. Has work ever been completed by performance bond? [ ] Yes [ ] No 8c. Did you look at the project site(s) on-the-ground? [ ] Yes [ ] No 8d. If “Yes” to either item 8a. or 8b., specify location(s) and reason(s) why:

10. List below the experience of the principal individuals of your business: (Who will directly be involved in this contract?)

Individual’s Name Present Position Years of Experience

Magnitude and Type of Work

11. Remarks -- Specify Box Numbers (Attach sheets if extra space is needed to fully answer any above question.):

NOTE: PLEASE PROVIDE ANY ADDITIONAL INFORMATION THAT WILL HELP EVALUATE YOUR ABILITY TO

SUCCESSFULLY COMPLETE THIS PROJECT.

CERTIFICATION

I certify that all of the statements made by me are complete and correct to the best of my knowledge, and that any persons named as references are authorized to furnish the Forest Service with any information needed to verify my capability to perform this project.

12a. CERTIFYING OFFICIAL’S NAME AND TITLE

b. SIGNATURE (Sign in ink) 13. DATE

EXPERIENCE QUESTIONNAIRE CONTINUED

9. Employees and equipment that will be available for this project:

a. (1) Minimum number of employees: and (2) Maximum number of employees:

b. Are employees regularly on your payroll: [ ] Yes [ ] No

c. Specify equipment available for this contract:

d. Estimate rate of progress below (such as 2.0 acres/man/day):

(1) Minimum progress rate: and (2) Maximum progress rate:

Biobased Products

Offeror shall identify the biobased products to be purchased and used under this contract. For each biobased product, specify the name of the manufacturer, cost of each product, and the intended use of each of the materials that are to be used in carrying out the requirements of the contract. For each biobased product, the Offeror shall specify the percentage of biobased content, and for the USDA-designated biobased content products, the Offeror shall demonstrate that the products to be used under this contract will contain the percentage specified in the USDA recommendations or the highest level of biobased material practicable, consistent with USDA's recommended percentages of biobased content.

The Offeror shall document prior experience in specifying, purchasing, using, and installing biobased products. The Offeror shall provide a list of all relevant contracts over the past 3 years involving the specification, purchase, and/or use of biobased products. The Offeror shall include a list of the biobased products specified, purchased, used, and installed.

The above information shall be provided for all proposed subcontractors in the same format and level of detail as prescribed for the Offeror.

Page 3 EXPERIENCE QUESTIONNAIRE CONTINUED

The following is added:

Attach additional sheets, as necessary.

File details come from the government source that posted it. Updated .