01010 - 1

SUMMARY OF WORK

SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. The intent for this contract is to perform and complete Level 3 road maintenance activities on designated roads on the Bessey Ranger District as specified (FP 14 specifications) and as Shown on the Drawings.

B. This work shall be for Years 2023 and 2024. Each of the designated roads shall be maintained three (3) times per year as specified in Section 303. Year 2023 is designated as the Base Year for this work with Year 2024 shown as an Option Year.

C. The Bessey Ranger District of the Nebraska National Grasslands and Forests lies within the Sandhills region of central Nebraska near Halsey, Nebraska. Summers can be hot and dry with winters cold and snowy. The nearest towns for lodging, food, and fuel are Halsey, Dunning, and Thedford, Nebraska. All are within 15 miles of the District Office.

1.2 GENERAL SITE CONDITIONS

A. The designated roads are 18 foot wide or less and have numerous curves, rolling terrain, different road surfacing material, ditches, leadoff ditches, and metal culverts. The successful contractor shall watch for the ditches and culverts and adjust work as necessary to meet the intent of this project.

B. The road surfacing varies from road to road and within segments of each road. Surfacing may be aggregate base material to a local mudrock aggregate mixture to native sand. If the road shoulder material is mostly sand, it shall be bladed off the roadway onto the surrounding landscape. If the road shoulder material contains any aggregate material, this material shall be incorporated back onto the road surface.

C. The elevation of the site is approximately 2,700 feet above mean sea level.

1.3 USE OF PREMISES

A. General: Contractor shall have full use of the Project site during the maintenance period.

Contractor's use of premises is limited only by the Government's right to perform work as needed using these roads for access.

B. Confine storage of equipment to areas as approved by the CO.

1.4 CONSTRUCTION SEQUENCE

A. There is no specified construction sequence for this project unless there is an emergency at which time the CO will direct the Contractor’s work within the scope of this contract.

B. Depending on conditions, normal fire restrictions may apply to activities associated with this project.

01010 - 2

SUMMARY OF WORK

1.5 FIELD VERIFICATION

A. It is recommended to field verify all new and existing dimensions affecting the work of this contract prior to placing a quote.

1.6 PERMITS

A. Any permits required for this type of work by Local, State, or Federal laws or regulations shall be obtained by the Contractor.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

END SUMMARY OF WORK

1.
1.1 summary
A. The intent for this contract is to perform and complete Level 3 road maintenance activities on designated roads on the Bessey Ranger District as specified (FP 14 specifications) and as Shown on the Drawings.
B. This work shall be for Years 2023 and 2024. Each of the designated roads shall be maintained three (3) times per year as specified in Section 303. Year 2023 is designated as the Base Year for this work with Year 2024 shown as an Option Year.
C. The Bessey Ranger District of the Nebraska National Grasslands and Forests lies within the Sandhills region of central Nebraska near Halsey, Nebraska. Summers can be hot and dry with winters cold and snowy. The nearest towns for lodging, food, an...
1.2 GENERAL SITE CONDITIONS
A. The designated roads are 18 foot wide or less and have numerous curves, rolling terrain, different road surfacing material, ditches, leadoff ditches, and metal culverts. The successful contractor shall watch for the ditches and culverts and adjust...
B. The road surfacing varies from road to road and within segments of each road. Surfacing may be aggregate base material to a local mudrock aggregate mixture to native sand. If the road shoulder material is mostly sand, it shall be bladed off the ro...
C. The elevation of the site is approximately 2,700 feet above mean sea level.
1.3 USE OF PREMISES
A. General: Contractor shall have full use of the Project site during the maintenance period. Contractor's use of premises is limited only by the Government's right to perform work as needed using these roads for access.
B. Confine storage of equipment to areas as approved by the CO.
1.4 construction sequence
A. There is no specified construction sequence for this project unless there is an emergency at which time the CO will direct the Contractor’s work within the scope of this contract.
B. Depending on conditions, normal fire restrictions may apply to activities associated with this project.
1.5 Field verification
A. It is recommended to field verify all new and existing dimensions affecting the work of this contract prior to placing a quote.
1.6 permits
A. Any permits required for this type of work by Local, State, or Federal laws or regulations shall be obtained by the Contractor.