J.2 Statement of Work (1 Page).docx

DOCX document 24 KB Posted

Attached to
Elk Meadows Trail Bridge Material Supply Federal contract opportunity
Solicitation number
1240LP26Q0057
Issued by
Department of Agriculture Forest Service

About this file

This is a Statement of Work for the supply and delivery of materials for the Elk Meadows Trail Bridge project. The contractor must furnish, fabricate, and treat structural timber to create one complete glued-laminated longitudinal deck panel slab type trail bridge system with timber curb railing and running planks. All required anchoring and fastening hardware must be provided, including anchor bolts, lag screws, malleable iron washers, nails, plate washers, and structural steel components necessary to deliver a complete, functional bridge system.

The complete bridge system must be delivered to the Elk Meadows Trailhead parking lot, located approximately 19 miles from the Stanley Ranger District Office in Stanley, Idaho, between September 28th and September 30th. The contractor must commence work within 10 calendar days of receiving the Notice to Proceed and coordinate delivery with Braidy Richins at 208.731.0176 or braidy.richins@usda.gov at least 48 hours prior to arrival, with Thursday and Friday deliveries prohibited. Materials must comply with Federal Highway Administration Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14) and Forest Service Supplemental Specifications (FSSS). The Contracting Officer's Representative will inspect all delivered materials, and any work not meeting contract specifications must be replaced at no additional cost to the supplier.

View the file

Other files for this federal contract opportunity

Other files attached to Elk Meadows Trail Bridge Material Supply, newest first.
File Type Posted
J.3 Rev2 Drawings (6 Pages).pdf PDF
1240LP26Q0057.0001 - Elk Meadows Trail Bridge Material Supply.pdf PDF
J.1 Specifications (12 Pages).docx DOCX document
J.3 Drawings (6 Pages).pdf PDF
1240LP26Q0057 - Elk Meadows Trail Bridge Material Supply (14 Pages).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

I. GENERAL REQUIREMENTS

A. Description of Work Furnish, fabricate, and treat structural timber, including all required yard lumber needed to render one complete glued-laminated longitudinal deck panel slab type trail bridge system having timber curb railing and running planks. Furnish all required anchoring/fastening hardware including but not limited to anchor bolts, lag screws, malleable iron washers, nails, plate washers, and other structural steel as required to render a complete bridge system, delivered to the Elk Meadows Trailhead parking lot location noted on the Drawings.

B. Delivery Location Deliver the complete bridge system to the Elk Meadows Trailhead parking lot location noted on the Drawings. This trailhead parking lot is located approximately 19 miles from the Stanley Ranger District Office in Stanley, Idaho, via State Highway 75, State Highway 21, and Forest Road #162. Coordinate material delivery with Braidy Richins at 208.731.0176 or by email at braidy.richins@usda.gov a minimum of 48 hours prior to delivery. Thursday and Friday deliveries are not permitted.

C. Required Delivery Date Between September 28th and September 30th.

D. Contract Time The Contractor shall (a) commence work under this contract within 10 calendar days after the date the Contractor receives the Notice to Proceed; (b) prosecute the work diligently; and (c) supply all the bridge system materials by the above noted “required delivery date”.

E. Inspection and Acceptance Inspection of the delivered material will be made by the Contracting Officer’s Representative. Materials not completed in accordance with the Contract Documents shall be replaced without additional compensation to the Supplier.

II. PROJECT SPECIFICATIONS

A. Specifications Federal Highway Administration Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14) and the attached Forest Service Supplemental Specifications (FSSS) are applicable to this Contract. All specifications not included in the specification listing but referenced by listed specifications are applicable. Standard Specifications (FP-14) are available in pdf format on-line at https://highways.dot.gov/federal-lands/specs .