This document is a specification section for office and warehouse lighting. It provides requirements for luminaires, lighting poles, standards, and installation. Key details include:
-
Luminaires and lighting equipment are to be selected from those called out in the contract drawings. Proposed substitutions must meet specified criteria including aesthetics, efficacy, lumen output, distribution, CRI, CCT, and BUG ratings.
-
Installation requirements cover surface mounting, suspension mounting, mounting in ceilings, pole foundations, pole installation, corrosion prevention, identification, testing, protection and commissioning. Supporting devices and poles must match luminaire finishes.
-
The solicitation number provided is for lighting at the Ephraim Office and Warehouse in the Department of Agriculture Forest Service. No further project details or response requirements are included in this specification section.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J.1 WD UT20230076 Sanpete County 04-14-2023.pdf | ||
| J.3 Experience Questionnaire (3 Pages) Ephraim Office and Warehouse Lighting.pdf | ||
| Ephraim Office and Warehouse Lighting RFQ 1240LT23Q0111.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Copyright 2022 AIA MasterSpec Full Length 12/22
LIGHTING 265000 - 1
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International
Treaties. A valid, current MasterSpec license is required for editing or use of this document.
SECTION 265000 - LIGHTING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Luminaires.
2. Lighting poles and standards.
1.2 DEFINITIONS
A. BUG Rating: Backlight, uplight, and glare rating for light pollution from exterior luminaires.
B. Correlated Color Temperature (CCT): The absolute temperature (in kelvins) of a blackbody whose chromaticity (color quality) most nearly resembles that of the light source.
C. Color Rendering Index (CRI): The measure of the degree of color shift objects undergo when illuminated by the light source as compared with the color of those same objects when illuminated by a reference light source. The lower the CRI of a light source, the more difficult it is to identify colors and stripes on electronic components and wiring.
1.3 SUBMITTALS
A. Product Data for Proposed Substitutions:
1. For luminaires include “IES” files for comparison along with other information required in Section 260500 “Common Work Results for Electrical.”
2. The Contracting Officer may ask for lumen calculations based on the installation for proposed substitutions to verify against the designing engineers’ original calculations. Base “.dwg” files would be made available along with original calculation parameters and results. Some variance is expected, the degree of that which is deemed acceptable may or may not feel fair.
B. Sustainable Design Product Data:
1. For luminaires.
a. Energy Efficiency: Submit product certificate indicating luminaire is certified by [Energy Star] [Design Lights Consortium].
b. Energy Usage: Submit product data showing compliance with
ASHRAE 90.1.
c. BUG Ratings: Submit product data indicating BUG ratings of all installed exterior luminaires.
LIGHTING 265000 - 2
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International
Treaties. A valid, current MasterSpec license is required for editing or use of this document.
d. Luminaire Calculations: Submit product data indicating lumen emittance and vertical illuminance.
1.4 MEASUREMENT AND PAYMENT
A. No separate payment will be made for the work included under this section; rather payment shall be considered to be included in the items for work listed in the Schedule of Items.
PART 2 - PRODUCTS
2.1 PRODUCTS
A. Products to be installed are called out in contract drawings. They have been selected in accordance with multiple criteria, however or-equals or better are allowed to be submitted for consideration.
1. Selection criteria often includes:
a. Aesthetics.
b. Efficacy.
c. Delivered lumens.
d. Lumen distribution.
e. Lighting level calculations.
f. CRI.
g. CCT.
h. BUG rating.
i. Rated life.
j. Country of origin.
k. Perceived quality.
2.2 GENERAL MATERIAL REQUIREMENTS
A. Metal Parts:
1. Free of burrs and sharp corners and edges.
2. Sheet metal components must be steel unless otherwise indicated.
3. Form and support to prevent warping and sagging.
B. Doors, Frames, and Other Internal Access:
1. Smooth operating, free of light leakage under operating conditions.
2. Designed to permit relamping without use of tools.
3. Designed to prevent doors, frames, lenses, diffusers, and other components from falling accidentally during relamping and when secured in operating position.
C. Acrylic: 100 percent virgin acrylic plastic, with high resistance to yellowing and other changes due to aging, exposure to heat, and UV radiation.
LIGHTING 265000 - 3
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International
Treaties. A valid, current MasterSpec license is required for editing or use of this document.
D. Finishes: Unless otherwise allowed, supporting devices and poles shall be from the same manufacturer as the luminaire and match finish colors.
E. Retrofit Relamping Labels: Include safety warnings, recommended lamp type, diameter, shape, size, wattage, and coating on factory-applied label that is clearly visible when luminaire is open for relampling.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.
B. Buildings: Examine roughing-in for luminaire to verify actual locations of luminaire and electrical connections before luminaire installation.
C. Examine poles, luminaire-mounting devices, lowering devices, and pole accessories before installation. Components that are scratched, dented, marred, wet, moisture damaged, or visibly damaged are considered defective.
1. Examine roughing-in for foundation and conduit to verify actual locations of installation.
D. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION OF LIGHTING
A. Comply with manufacturer's published instructions.
B. Reference Standards for Installation: Unless more stringent installation requirements are specified in Contract Documents or manufacturers' published instructions, comply with the following:
1. Installation of Indoor Lighting Systems: NECA NEIS 500.
2. Installation of Exterior Lighting Systems: NECA NEIS 501.
3. Installation of Industrial Lighting Systems: NECA NEIS 502.
4. Installation of Luminaires, Lampholders, and Lamps: Article 410 of NFPA 70.
5. Installation of Extra-Low-Voltage Lighting: Article 411 of NFPA 70.
6. Installation of Emergency Lighting and Exit Signs: ICC IBC, NFPA 101, and
Parts IV and V in Article 700 of NFPA 70.
C. Special Installation Techniques:
1. Install luminaires level, plumb, and square with finished floor or grade unless otherwise indicated.
2. Install luminaires at height and aiming angle as indicated on Drawings.
3. Coordinate layout and installation of luminaires with other construction.
LIGHTING 265000 - 4
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International
Treaties. A valid, current MasterSpec license is required for editing or use of this document.
4. Adjust luminaires that require field adjustment or aiming. [Include adjustment of photoelectric device to prevent false operation of relay by artificial light sources, favoring a north orientation.]
5. Install lamps in each luminaire without preinstalled lamps.
6. Exterior Bollard Luminaires:
a. Align units for optimum directional alignment of light distribution.
b. Install on concrete base with top [4 inch (100 mm)] <Insert dimension> above finished grade or surface at luminaire location. Cast conduit into base, and finish by troweling and rubbing smooth. Concrete materials, installation, and finishing are specified in Section 033000 "Cast-in-Place
Concrete."
7. Exterior In-Ground Luminaires:
a. Install on concrete base with top [4 inch (100 mm)] <Insert dimension> above finished grade or surface at luminaire location. Cast conduit into base, and finish by troweling and rubbing smooth. Concrete materials, installation, and finishing are specified in Section 033000 "Cast-in-Place
Concrete."
8. Exterior Corrosion Prevention:
a. Do not use aluminum in contact with earth or concrete. When in direct contact with dissimilar metals, protect aluminum with insulating fittings or treatment.
b. When embedding steel conduits in concrete, wrap conduit with 10 mil
(0.254 mm) thick, pipe-wrapping plastic tape applied with a 50 percent overlap.
9. Flush-Mounted Luminaire Support:
a. Secured to outlet box.
b. When luminaire is over 24 inch, 600 mm in length, attach to ceiling structural members at four points equally spaced around the luminaire.
c. Trim ring flush with finished surface.
10. Wall-Mounted Luminaire Support:
a. Attached to structural members in walls, or to outlet boxes securely mounted to structural members in walls.
b. Do not attach luminaires directly to gypsum board.
11. Suspended Luminaire Support:
a. Ceiling Mount:
LIGHTING 265000 - 5
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International
Treaties. A valid, current MasterSpec license is required for editing or use of this document.
1) Hook hangers.
2) [Two] [Two with triangular wire trapeze for stability] <Insert number> wires.
3) [Two] [Two with triangular cable trapeze for stability] [Two with overturn stabilizer] [Four] <Insert number> aircraft cables.
b. Pendants and Rods: Where longer than 48 inch (1220 mm), brace to limit swinging.
c. Stem-Mounted, Single-Unit Luminaires: Suspend with twin-stem hangers.
Support with approved outlet box and accessories that hold stem and provide damping of luminaire oscillations. Support outlet box vertically to building structure using approved devices.
d. Continuous Rows of Luminaires: Provide tubing or stem for wiring at one point and [tubing or rod] [wire support] for suspension for each unit length of luminaire chassis, including one at each end.
e. Do not use ceiling grid as support for pendant luminaires. Connect support wires or rods to building structure.
12. Ceiling-Grid-Mounted Luminaire Support:
a. Install ceiling support system rods or wires for each luminaire. Locate not more than 6 inch (150 mm) from luminaire corners.
b. Support Clips: Fasten to luminaires and to ceiling grid members at or near each luminaire corner with clips that are UL listed for application.
c. Luminaires of Sizes Smaller Than Ceiling Grid: Install as indicated on reflected ceiling plans or center in acoustical panel, and support luminaires independently with no fewer than two 3/4 inch (20 mm) metal channels spanning and secured to ceiling tees.
d. Seismic Restraint: Install at least one independent support rod or wire from structure to tab on luminaire. Wire or rod must have breaking strength for luminaire weight with safety factor of 3.
13. Remote Mounting of Ballasts: Do not exceed distance between ballast and luminaire recommended by ballast manufacturer.
14. Emergency Power Units: Secure with approved fasteners in four or more locations, spaced near corners of unit.
15. Install wiring connections for luminaires.
16. Identification: Provide labels for luminaires and associated electrical equipment.
a. Identify field-installed conductors, interconnecting wiring, and components.
b. Provide warning signs.
c. Label each enclosure with engraved metal or laminated-plastic nameplate.
D. Systems Integration: Integrate lighting control devices and equipment with electrical power connections for operation of luminaires as specified.
3.3 POLE FOUNDATION
LIGHTING 265000 - 6
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International
Treaties. A valid, current MasterSpec license is required for editing or use of this document.
A. Concrete Pole Foundations: Cast in place, with anchor bolts to match pole-base flange.
Structural steel complying with ASTM A36/A36M and hot-dip galvanized in accordance with ASTM A123/A123M; and with top-plate and mounting bolts to match pole-base flange and strength required to support pole, luminaire, and accessories.
Concrete, reinforcement, and formwork are specified in Section 033000 "Cast-in-Place
Concrete."
B. Pre-Cast Foundations: Factory fabricated, with structural steel complying with
ASTM A36/A36M and hot-dip galvanized in accordance with ASTM A123/A123M;
and with top-plate and mounting bolts to match pole-base flange and strength required to support pole, luminaire, and accessories. Concrete, reinforcement, and formwork are specified in Section 033000 "Cast-in-Place Concrete."
C. Direct-Buried Foundations: Install to depth indicated on Drawings, but not less than one-sixth of pole height. Add backfill in 6 inch (150 mm) to 9 inch (230 mm) layers, tamping each layer before adding the next. To ensure a plumb installation, continuously check pole orientation with plumb bob while tamping.
D. Direct-Buried Poles with Concrete Backfill: Set poles in augered holes to depth below finished grade indicated on Drawings, but not less than one-sixth of pole height. To ensure a plumb installation, continuously check pole orientation with plumb bob while tamping.
1. Make holes 6 inch (150 mm) in diameter larger than pole diameter.
2. Fill augered hole around pole with air-entrained concrete having a minimum compressive strength of 3000 psi (20 MPa) at 28 days and finish in a dome above finished grade.
3. Use a short piece of 1/2 inch (13 mm) diameter pipe to make a drain hole through grout. Arrange to drain condensation from interior of pole.
4. Cure concrete a minimum of 72 hours before performing work on pole.
E. Anchor Bolts: Install plumb using manufacturer-supplied template, uniformly spaced.
3.4 POLE INSTALLATION
A. Alignment: Align pole foundations and poles for optimum directional alignment of luminaires and their mounting provisions on pole.
B. Clearances: Maintain the following minimum horizontal distances of poles from surface and underground features unless otherwise indicated on drawing.
1. Fire Hydrants and Water Piping: 60 inch (1520 mm).
2. Water, Gas, Electric, Communications, and Sewer Lines: 10 ft (3 m).
3. Trees: 15 ft (5 m) from tree trunk.
C. Concrete Pole Foundations: Set anchor bolts in accordance with anchor-bolt templates furnished by pole manufacturer. Concrete materials, installation, and finishing requirements are specified in Section 033000 "Cast-in-Place Concrete."
LIGHTING 265000 - 7
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International
Treaties. A valid, current MasterSpec license is required for editing or use of this document.
D. Foundation-Mounted Poles: Mount pole with leveling nuts and tighten top nuts to torque level in accordance with pole manufacturer's written instructions.
1. Use anchor bolts and nuts selected to resist seismic forces specified for the application and approved by manufacturer.
2. Grout void between pole base and foundation. Use nonshrink or expanding concrete grout firmly packed to fill space.
3. Install base covers unless otherwise indicated.
4. Use a short piece of 1/2 inch (13 mm) diameter pipe to make a drain hole through grout. Arrange to drain condensation from interior of pole.
E. Poles and Pole Foundations Set in Concrete-Paved Areas: Install poles with a minimum
6 inch (150 mm) wide, unpaved gap between the pole or pole foundation and the edge of the adjacent concrete slab. Fill unpaved ring with pea gravel. Insert material to a level 1 inch (25 mm) below top of concrete slab.
F. Raise and set pole using web fabric slings (not chain or cable) at locations indicated by manufacturer.
3.5 CORROSION PREVENTION
A. Aluminum: Do not use in contact with earth or concrete. When in direct contact with a dissimilar metal, protect aluminum using insulating fittings or treatment.
B. Steel Conduits: Comply with requirements in Section 260533.13 "Conduits for
Electrical Systems." In concrete foundations, wrap conduit with 0.010 inch (0.254 mm) thick, pipe-wrapping plastic tape applied with a 50-percent overlap.
3.6 IDENTIFICATION
A. Identify system components, wiring, cabling, and terminals. Comply with requirements for identification specified in Section 260553 "Identification for Electrical Systems."
3.7 FIELD QUALITY CONTROL OF LIGHTING
A. Field tests and inspections must be witnessed by Contracting Officer or designated representative.
B. Tests and Inspections:
1. Perform manufacturer's recommended tests and inspections.
2. Operational Test: After installing luminaires, switches, and accessories, and after electrical circuitry has been energized, test units to confirm proper operation.
a. Verify with lighting controls adjusting.
3. Test for Emergency Lighting: Interrupt power supply to demonstrate proper operation. Verify transfer from normal power to battery power and retransfer to normal.
LIGHTING 265000 - 8
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International
Treaties. A valid, current MasterSpec license is required for editing or use of this document.
4. Verify operation of photoelectric controls.
5. Inspect poles for nicks, mars, dents, scratches, and other damage.
C. Nonconforming Work:
1. Luminaire will be considered defective if it does not pass tests and inspections.
2. Remove and replace defective units and retest.
D. Field Quality-Control Reports: Collect, assemble, and submit test and inspection reports.
3.8 PROTECTION
A. After installation, protect lighting equipment from construction activities. Remove and replace items that are contaminated, defaced, damaged, or otherwise caused to be unfit for use prior to acceptance by Owner.
END OF SECTION 265000
SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL 260010 - 1
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International
Treaties. A valid, current MasterSpec license is required for editing or use of this document.
SECTION 260000 - COMMON WORK RESULTS FOR ELECTRICAL
PART 1 - GENERAL
1.1 SUMMARY
A. This Section specifies supplemental requirements generally applicable to the Work specified in Division 26. This Section is also referenced by related Work specified in other Divisions.
B. Section Includes:
1. Electrical Submittals
2. Measurement and Payment
3. Electrical equipment coordination and installation.
4. Grout.
5. Common electrical installation requirements.
6. Hangers and supports.
1.2 REFERENCES
A. Abbreviations and Acronyms for Electrical Terms and Units of Measure:
1. 8P8C: An 8-position 8-contact modular jack.
2. A: Ampere, unit of electrical current.
3. AC or ac: Alternating current.
4. AFCI: Arc-fault circuit interrupter.
5. AIC: Ampere interrupting capacity.
6. AL, Al, or ALUM: Aluminum.
7. ATS: Automatic transfer switch.
8. AWG: American wire gauge; see ASTM B258.
9. BAS: Building automation system.
10. C: Conduit, raceway, or duct bank.
11. CAD: Computer-aided design or drafting.
12. CATV: Community antenna television.
13. CB: Circuit breaker.
14. CO/ALR: Copper-aluminum, revised.
15. CU or Cu: Copper.
16. CU-AL or AL-CU: Copper-aluminum.
17. DC or dc: Direct current.
18. EGC: Equipment grounding conductor.
19. EMF: Electromotive force.
20. EMI: Electromagnetic interference.
21. EV: Electric vehicle.
22. EVSE: Electric vehicle supply equipment.
23. fc or ftc: Footcandle, an internationally recognized unit of illuminance equal to one lumen per square foot or 10.76 lx. The simplified conversion 1 fc = 10 lx in the Specifications is common practice and considered adequate precision for
SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL 260010 - 2
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International
Treaties. A valid, current MasterSpec license is required for editing or use of this document.
building construction activities. When there are conflicts, lux is the primary unit;
footcandle is specified for convenience.
24. FLC: Full-load current.
25. ft: Foot.
26. GEC: Grounding electrode conductor.
27. GFCI: Ground-fault circuit interrupter.
28. GFPE: Ground-fault protection of equipment.
29. GND: Ground.
30. HACR: Heating, air conditioning, and refrigeration.
31. HDPE: High-density polyethylene.
32. HP or hp: Horsepower.
33. HVAC: Heating, ventilating, and air conditioning.
34. Hz: Hertz.
35. IBT: Intersystem bonding termination.
36. inch: Inch. To avoid confusion, the abbreviation "in." is not used.
37. kcmil or MCM: One thousand circular mils.
38. kW: Kilowatt.
39. kWh: Kilowatt-hour.
40. LAN: Local area network.
41. lb: Pound (weight).
42. LCD: Liquid-crystal display.
43. LED: Light-emitting diode.
44. Li-ion: Lithium-ion.
45. lm: Lumen, the SI derived unit of luminous flux.
46. LNG: Liquefied natural gas.
47. LP-Gas: Liquefied petroleum gas.
48. LRC: Locked-rotor current.
49. LV: Low voltage.
50. m: Meter.
51. MLO: Main lugs only.
52. NC: Normally closed.
53. Ni-Cd: Nickel-cadmium.
54. NO: Normally open.
55. NPT: National (American) standard pipe taper.
56. OCPD: Overcurrent protective device.
57. PC: Personal computer.
58. PF or pf: Power factor.
59. PHEV: Plug-in hybrid electric vehicle.
60. PLC: Programmable logic controller.
61. PoE: Power over Ethernet.
62. PV: Photovoltaic.
63. PVC: Polyvinyl chloride.
64. RFI: (electrical) Radio-frequency interference; (contract) Request for interpretation.
65. RPM or rpm: Revolutions per minute.
66. SPD: Surge protective device.
SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL 260010 - 3
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International
Treaties. A valid, current MasterSpec license is required for editing or use of this document.
67. sq.: Square.
68. SWD: Switching duty.
69. SZ: Nominal conduit size in inches.
70. TCP/IP: Transmission control protocol/Internet protocol.
71. TEFC: Totally enclosed fan-cooled.
72. TR: Tamper resistant.
73. TVSS: Transient voltage surge suppressor.
74. UL: (standards) Underwriters Laboratories, Inc.; (product categories) UL, LLC.
75. UL CCN: UL Category Control Number.
76. UPS: Uninterruptible power supply.
77. USB: Universal serial bus.
78. V: Volt, unit of electromotive force.
79. V(ac): Volt, alternating current.
80. V(dc): Volt, direct current.
81. VA: Volt-ampere, unit of complex electrical power.
82. VFC: Variable-frequency controller.
83. VOM: Volt-ohm-multimeter.
84. VRLA: Valve regulated lead acid; also called "sealed lead acid (SLA)" or "valve regulated sealed lead acid."
85. W: Watt, unit of real electrical power.
86. Wh: Watt-hour, unit of electrical energy usage.
87. WR: Weather resistant.
1.3 COORDINATION
A. Interruption of Existing Electrical Service: Do not interrupt electrical service to facilities occupied by Government or others unless permitted under the following conditions:
1. Notify Contracting Officer no fewer than [seven] <Insert number> days in advance of proposed interruption of electrical service.
2. Do not proceed with interruption of electrical service without Contracting
Officers written permission.
3. Coordinate interruption with systems impacted by outage including, but not limited to, the following:
a. Exercising generators.
b. Emergency lighting.
c. Elevators.
d. Fire-alarm systems.
1.4 QUALITY ASSURANCE
A. The installation shall conform to the latest edition (based on published year) of the
National Electrical Code (NFPA 70) and to the requirements specified herein.
1. When conflicting with locally adopted electrical code, the most stringent shall apply.
SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL 260010 - 4
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International
Treaties. A valid, current MasterSpec license is required for editing or use of this document.
B. The Contractor shall perform all work necessary and required to accomplish the task as detailed on the drawings and discussed in the installation notes. All work shall be done by a state licensed electrician.
C. Electrical equipment, general: Listed and labeled in accordance with NFPA 70, by qualified electrical testing laboratory recognized by authorities having jurisdiction, and marked for intended location and application.
1.5 SUBMITTALS
A. Product Data:
1. For any substitutions for equipment referred to by name in Division 26 specifications or the drawings submitted and approved before installation. See
Article 2.1.
a. Proposed substitutions shall clearly indicate “Proposed Substitution #” and include the cutsheet for the item the proposed and the item it would replace labeled “For #.”
1) “#” indicates a unique number assigned to the substitution and the original item called for.
b. Also indicate purpose for each products submittal:
1) Or-Equal: Products deemed equal or better than the equipment or product listed. Considered requests for substitutions for convenience and require
2) Unavailable, or, Lead Time:
a) Unavailable: The listed product called for is no longer manufactured.
b) Lead Time: Because listed equipment significantly impacts construction schedule because of lead time.
c) Contractor must declare the possibility as soon as possible to permit establishing a mitigation plan for minimizing risks to system performance and construction schedule.
3) As Called For: Submittals for equipment and products as called are not required unless noted for submittal in the related Section, or, submitted as part of the O&M Manual(s). These may not be reviewed by the Government.
2. Submittals for general common items such as for conduit, fittings, conductors and cables, connectors, etc. not called out by part number and manufacturer, are typically not required unless otherwise noted in the corresponding specification section.
a. Country of origin may be an issue which may be cause for rejection of some materials.
SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL 260010 - 5
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International
Treaties. A valid, current MasterSpec license is required for editing or use of this document.
B. Operation and Maintenance Data:
1. Compile and submit based on this and other sections in Divisions 26, 27, and 28.
1.6 MEASUREMENT AND PAYMENT
A. The work in this section, including all [Division 27 Communications] [and] [Division
28 Electronic Safety and Security wiring and] incidentals in other electrical sections, shall be measured and paid for by the following method(s) as shown in the Schedule of
Items:
1. Incidental to the building item or included as part of other pay items or separate as shown in the Schedule of Items.
2. Electrical Distribution System - Lump Sum including full compensation for all labor, materials, and incidentals necessary to complete the work as shown on the drawings including all wiring, trenching, bedding, backfill, and all other incidentals necessary for a functional system.
PART 2 - PRODUCTS
2.1 PRODUCTS REFERRED TO BY NAME
A. The materials referred to by trade name, make, or catalog number on the drawings shall be regarded as establishing a minimum standard of quality; substitutions of equal or greater quality can be made by submitting a data sheet of the proposed substituted item to the Contracting Officer, for approval.
2.2 METHODS REFERENCED IN OTHER SECTIONS
A. General methods referenced in other Division 26, 27, and 28 sections indicate products and methods that are allowed for use during this project, including incidentals (fittings, connectors, etc).
1. Where the use of an alternative method is desired, the alternative method may be requested by submitting data sheets or description of the proposed method to the
Contracting Officer, for approval, before installation. Include where the proposed product is requested for, how, and why.
2. Alternative methods may also be proposed before installation, however, these sections and contract drawings are to be regarded as establishing a minimum standard of quality where they exceed code and typical industry standards and will likely be rejected.
B. Unapproved alternative products and methods will be subject to removal and replacement with approved products and methods at the contractors’ expense.
2.3 GROUT
SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL 260010 - 6
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International
Treaties. A valid, current MasterSpec license is required for editing or use of this document.
A. Nonmetallic, Shrinkage-Resistant Grout: ASTM C 1107, factory-packaged, nonmetallic aggregate grout, noncorrosive, nonstaining, mixed with water to consistency suitable for application and a 30-minute working time.
PART 3 - EXECUTION
3.1 EXAMINATION
A. The contractor shall familiarize themselves with the project, requirements, and actual site conditions. Coordinate installation and routing with other trades.
3.2 INSTALLATION OF ELECTRICAL WORK
A. Unless more stringent requirements are specified in the Contract Documents or manufacturers' written instructions, comply with NFPA 70 and NECA NEIS 1 for installation of Work specified in Division 26. Consult Architect for resolution of conflicting requirements.
B. Measure indicated mounting heights to bottom of unit for suspended items and to center of unit for wall-mounting items, unless otherwise directed.
C. Headroom Maintenance: If mounting heights or other location criteria are not indicated, arrange and install components and equipment to provide maximum possible headroom consistent with these requirements.
D. Equipment: Install to facilitate service, maintenance, and repair or replacement of components of both electrical equipment and other nearby installations. Connect in such a way as to facilitate future disconnecting with minimum interference with other items in the vicinity.
E. Right of Way: Give to piping systems installed at a required slope.
3.3 RACEWAY AND SIMILAR PENETRATIONS (NON-FIRE RATED, NOT
SLEEVED)
A. Concrete Slabs and Walls: Core-drilled holes.
1. Fill oversized holes with grout to within 1/4-inch (6 mm).
B. Roof-Penetrations: Seal penetration of individual raceways with flexible boot-type flashing units applied in coordination with roofing work.
C. Stick-built and Similar Interior-Wall Penetrations (Finished Areas): Repair wall to within 1/8-inch (3 mm) to match the surrounding wall finish.
1. Allow for a small gap or flexible fill to allow expansion and contraction to minimize cracking.
D. Stick-built and Similar Interior-Wall Penetrations (Unfinished Areas): Repair wall to within 1/4-inch (6 mm).
SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL 260010 - 7
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International
Treaties. A valid, current MasterSpec license is required for editing or use of this document.
1. Allow for a small gap to allow for expansion and contraction.
E. Aboveground, Exterior-Wall Penetrations: Seal exterior opening around the raceway or cable, using a flexible, waterproofing, joint sealant appropriate for size, depth, and color to closely match the surrounding surface. Finish interior openings, filling opening and matching the exiting surface with appropriate materials and finish quality for the space.
[Comply with requirements in Division 07 Section "Joint Sealants."]
3.4 HANGERS AND SUPPORTS
A. Installation:
1. Comply with NECA 1 and NECA 101 for installation requirements, except as specified in this article.
2. Separate dissimilar metals and metal products from contact with wood or cementitious materials by painting each metal surface in area of contact with a bituminous coating or by other permanent separation.
3. Raceway Support Methods: In addition to methods described in NECA 1, [EMT]
[IMC] [and] [RMC] may be supported by openings through structure members, as permitted in NFPA 70.
4. Multiple Raceways or Cables: Install on trapeze-type supports fabricated with steel slotted channel.
5. Strength of Support[ and Seismic-Restraint] Assemblies: Where not indicated, select sizes of components so strength will be adequate to carry present and future static[ and seismic] loads within specified loading limits. Minimum static design load used for strength determination shall be weight of supported components plus 200 lb (90 kg).
6. Mounting and Anchorage of Surface-Mounted Equipment and Components:
Anchor and fasten electrical items and their supports to building structural elements by the following methods, unless otherwise indicated or required by
Code:
a. To Wood: Fasten with lag screws or through bolts.
b. To New Concrete: Bolt to concrete inserts.
c. To Masonry: Approved toggle-type bolts on hollow masonry units and expansion anchor fasteners on solid masonry units.
d. To Existing Concrete: Expansion anchor fasteners.
e. To Steel: [Welded, threaded studs complying with AWS D1.1/D1.1M, with lock washers and nuts] [Beam clamps (MSS Type 19, 21, 23, 25, or
27) complying with MSS SP-69] [Spring-tension clamps].
f. To Light Steel: Sheet metal screws.
g. Items Mounted on Hollow Walls and Nonstructural Building Surfaces:
Mount on slotted-channel racks attached to substrate.
7. Drill holes for expansion anchors in concrete at locations and to depths that avoid reinforcing bars.
SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL 260010 - 8
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International
Treaties. A valid, current MasterSpec license is required for editing or use of this document.
3.5 CLOSEOUT ACTIVITIES
A. Operation and Maintenance Data: Prepare and submit the following:
1. Provide emergency operation, normal operation, and preventive maintenance manuals for each system, equipment, and device listed below:
a. <Insert system, equipment, or device>.
2. Include the following information:
a. Manufacturer's operating specifications.
b. User's guides for software and hardware.
c. Schedule of maintenance material items recommended to be stored at
Project site.
d. Detailed instructions covering operation under both normal and abnormal conditions.
e. List of load-current and overload-relay heaters with related motor nameplate data.
f. List of lamp types and photoelectric relays used on Project, with ANSI and manufacturers' codes.
g. Manufacturer's instructions for setting field-adjustable components.
h. Manufacturer's instructions for testing, adjusting, and reprogramming microprocessor controls.
i. EPSS: Manufacturer's system checklists, maintenance schedule, and maintenance log sheets in accordance with NFPA 110.
j. Exterior pole inspection and repair procedures.
k. Include copies of demonstration and training videos.
B. Software and Firmware Operational Documentation: Provide software and firmware operational documentation, including the following:
1. Software operating and upgrade manuals.
2. Names, versions, and website addresses for locations of installed software.
3. Device address list.
4. Printout of software application and graphic screens.
5. Testing and adjusting of panic and emergency power features.
6. For lighting controls, include the following:
a. Adjustments of scene preset controls, adjustable fade rates, and fade overrides.
b. Operation of adjustable zone controls.
C. Software:
1. Program Software Backup: Provide [username and password for approved online or cloud solution] [and] [USB media that is clearly and permanently labeled with attached placard on lanyard to prevent misplacement].
SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL 260010 - 9
Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International
Treaties. A valid, current MasterSpec license is required for editing or use of this document.
2. Provide to Owner upgrades and unrestricted licenses[ for Government use] for installed and backup software, including operating systems and programming tools required for operation and maintenance.
D. Demonstration: Demonstrate to Owner's maintenance and engineering personnel how to operate the following systems and equipment:
1. Lighting control devices specified in Section 260923 "Lighting Control Devices."
2. How to adjust, operate, and maintain equipment specified in Section 111136
"Vehicle Charging Equipment."
3. How to adjust, operate, and maintain devices specified in Section 260923
"Lighting Control Devices."
4. How to adjust, operate, and maintain equipment specified in Section 262913.06
"Soft-Start Motor Controllers."
5. How to adjust, operate, and maintain equipment specified in Section 262923
"Variable-Frequency Motor Controllers."
6. How to adjust, operate, and maintain controllers[, remote alarm panels] [, low-suction-shutdown panels] [, and to use and reprogram microprocessor-based controls within this equipment] specified in Section 262933 "Controllers for
Fire Pump Drivers."
7. How to adjust, operate, and maintain equipment specified in Section 263213.13
"Diesel-Engine-Driven Generator Sets."
8. How to adjust, operate, and maintain equipment specified in Section 263213.16
"Gas-Engine-Driven Generator Sets."
9. How to adjust, operate, and maintain equipment specified in Section 263213.19
"Bi-Fuel-Engine-Driven Generator Sets."
10. How to adjust, operate, and maintain equipment specified in Section 263323.11
"Central Battery Equipment for Emergency Lighting."
11. How to adjust, operate, and maintain equipment specified in Section 263343
"Battery Chargers."
12. How to adjust, operate, and maintain equipment specified in Section 263353
"Static Uninterruptible Power Supply."
13. <Insert system or equipment>.