J.2 SOW-Pagosa RS sewer line repair.pdf
PDF 233 KB Posted
- Attached to
- Pagosa Ranger Station Sewer Line Repair
- Solicitation number
- 1240LT23Q0093
About this file
This statement of work outlines requirements for a sewer line repair project at the Pagosa Ranger Station in Pagosa Springs, Colorado. The scope of work includes assessing current site conditions to identify solutions, excavating and installing a new sewer cleanout, descaling approximately 25 feet of internal steel pipe within the foundation, and replacing approximately 50 feet of failing 4-inch clay sewer main. The contractor will be responsible for supplying all labor, materials, equipment, and licenses to complete the technical tasks in accordance with relevant plumbing codes. Deliverables include a proposed project plan with timeline, risks, responsibilities, and milestones to be submitted during the bidding process. Coordination will also be required with local personnel to access the secure government facility. The solicitation was issued by the US Department of Agriculture Forest Service Rocky Mountain Region for the Pagosa Ranger Station Sewer Line Repair project under solicitation number 1240LT23Q0093.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
Pagosa Ranger Station Sewer Line Repairs
US Department of Agriculture (USDA)
Forest Service
San Juan National Forest
Contents Project
General Information
1.0 Location
2.0 Scope of Work
3.0 Background
Contractor Requirements
4.0 Technical Requirements / Tasks
5.0 Deliverables / Schedule
6.0 Contractor’s Key Personnel
7.0 Security Requirements
Attachments .......................................................................................................... Error! Bookmark not defined.
Project Pagosa Ranger Station Sewer Line Repair
General Information
1.0 Location
The project is located at 180 Pagosa St. Pagosa Springs, CO 81147 at the Pagosa Ranger Station. From Durango, Colorado head east on Highway 160 for 60 miles. Take a left on North 2nd street and the building is located on the right.
2.0 Scope of Work
This project includes assessing current site conditions to find the best possible solutions for the follow: excavating and installing a new sewer cleanout, assessing/descaling the sewer lines within the foundation, and replacing the sewer main that leads to the existing cleanouts. See the attached document, ”3.1-Drawing Set 1-Pagosa Sewer Line Repair” for more details.
3.0 Background
Pagosa Ranger Station has begun to have sewer line issues. After an initial assessment it was found that the main sewer line, made of 4-foot clay pipe sections, has multiple bellies and is becoming disconnected at joints allowing for freezing and roots to enter the line. This has affected roughly 50 feet of line. The internal section of plumbing is also suspected to need descaling as its old steel pipe. This has affected roughly 25 feet of line. The line has begun to backup more frequently and needs these repairs. This contract aims to eliminate these issues and allow the sewer line to operate efficiently once again.
Contractor Requirements
4.0 Technical Requirements / Tasks
Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses and for the following:
• Install a new cleanout to access interior sewer lines.
o Cleanout design and install shall comply with the most recent International plumbing code (IPC) requirements.
o Local utilities are contacted to locate and prevent damage to other utilities in the surrounding area.
• Descale steel pipe within the foundation.
o Processes shall comply with the most recent International plumbing code (IPC) requirements and manufacture recommendations.
• Replace a sewer line with minimal excavation.
o Sewer line design and install shall comply with the most recent International plumbing code (IPC) requirements.
o Local utilities are contacted to locate and prevent damage to other utilities in the surrounding area.
• Properly dispose of any waste materials.
5.0 Deliverables / Schedule
The contractor is required to submit a proposed project plan including a timeline, risks, responsibilities, and milestone objectives for the entire contract during the bidding process.
• Obtain COR approval of any power, water, or sewer outages 48 hours in advance to allow of planned outage time.
6.0 Contractor’s Key Personnel
Contractor or Subcontractor must hold a current plumbers license.