Crested Butte Road Maintenance and Signage
Solicitation number
1240LT24Q0019
Issued by

About this file

This document contains schedules of items and road logs for a federal contract opportunity to perform road maintenance and improvements on Forest Service lands in Colorado. Work includes surface maintenance, spot surfacing, installation and reconstruction of grade dips, rolling dips and culverts. Locations include FSR routes 811, 738 and 734, and camping areas such as Washington Gulch, Tent City, Brush Creek, Slate River and Musicians Camp. Trailhead improvements are specified for Tent City and Brush Creek. The pre-proposal site visit is not scheduled and proposals are due by email to Westley.Bisson@usda.gov by the date specified in the solicitation. The contract must be completed by October 31, 2024. Performance and payment bonds are required based on offer amount. Relevant experience is to be demonstrated using the provided questionnaire.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SchItems

Gunnison 2024 Roads Project
Total Line Items
Pay ItemDescriptionAdditional NotesUnitQty.Price (Per Unit)
15101Mobilization to include insurance and bondingLump Sum1
15101(a)Equipment Time, BackhoeHr40
15101(b)Equipment Time, GraderHr20.00
15101(c)Equipment Time, DozerHr20.00
15101(d)Equipment Time, Dump TruckHr40.00
15101(e)Equipment Time, CompactorHr16.00
15101(f)Compaction Testing, Once every 12" LiftEach8.00
20104Cut Roadway Vegetation, Both SidesMile4.20
30307Surface Maintenance Level 2LF33931.00
Linear Feet to Mile ConversionMile6.43
30101Spot Surfacing, 3/4" MinusCY304.00
30101Spot Surfacing, 1 1/2 MinusCY847.00
60702Clean and Recondition CulvertsEach7.00
20406Drivable Grade Dip InstallationEach12.00
20410New Rolling Dip InstallationEach6.00
20406Armored Grade Dip InstallationEach2.00
20410Rolling Dip Reconstruction of ExistingEach2.00
20412Lead-Out Ditch InstallationEach2.00
61907Maintain Two-Lane CattleguardEach3.00
61907Install Cattleguard, Government FurnishedEach1.00
TOTAL

Review Totals

Gunnison 2024 Roads Project
Brush Creek and Tent City Totals
Pay ItemDescriptionAdditional notesUnitQty.
30307Surface Maintenance Level 2LF3,760.00
30101Spot Surfacing, 1 1/2 MinusCY298.00
20410Rolling Dip Reconstruction of ExistingEach2.00
20406Drivable Grade Dip InstallationEach4.00
61907Maintain Two-Lane CattleguardEach1.00
61907Install Cattleguard, Government FurnishedEach1.00
Washington Gulch Totals
Pay ItemDescriptionAdditional NotesUnitQty.
20104Cut Roadway Vegetation, Both SidesMile2.70
30307Surface Maintenance Level 2LF20116.00
30101Spot Surfacing, 1 1/2 MinusCY429.00
60702Clean and Recondition CulvertsEach7.00
20406Drivable Grade Dip InstallationEach6.00
20410New Rolling Dip InstallationEach3.00
20406Armored Grade Dip InstallationEach1.00
61907Maintain Two-Lane CattleguardEach1.00
Slate River and Musicians Camp Totals
Pay ItemDescriptionAdditional NotesUnitQty.
20104Cut Roadway Vegetation, Both SidesMile1.50
30307Surface Maintenance Level 2LF10055.00
30101Spot Surfacing, 1 1/2" MinusCY120.00
20406Drivable Grade Dip InstallationEach2.00
20410New Rolling Dip InstallationEach3.00
20406Armored Grade Dip InstallationEach1.00
20412Lead-Out Ditch InstallationEach2.00
61907Maintain Two-Lane CattleguardEach1.00
Trailhead Improvement Totals
Pay ItemDescriptionAdditional NotesUnitQty.
15101(c)Equipment Time, DozerHr40.00
15101(e)Equipment Time, CompactorHr16.00
20411Compaction testing, once per 12" liftEach8.00
30101Spot Surfacing, 3/4" MinusCY304.00

TC

2024 Tent City Road Reconstruction
Road Log
Note:Milepost #'s are measured from the cattlegaurd at the USFS boundary on FSR 738.
Road/Camp#/CampSpurMilepostPay ItemDescriptionAdditional NotesUnitQuantity
FSR 738061907Maintain Two Lane CattlegaurdStarting point at Forest BoundryEach1.00
FSR 7380.0-.530307Surface Maintenance Level 2Include DitchesLF2640.00
FSR 7380.120410Rolling Dip Reconstruction of ExcistingEach1.00
FSR 7380.320410Rolling Dip Reconstruction of ExcistingEach1.00
FSR 7380.4520406Drivable Grade Dip InstallationEach1.00
Tent City Parking Area0.3930307Surface Maintenace Level 2Recondition parking area (130'x30')SF3900.00
Tent City Parking Area0.3930101Spot Surfacing, 1 1/2" MinusEntire Parking Surface. (130'x30', 4")CY48.00
Tent City Main Spur0.461907Install Cattleguard, Government Furnished50' from FSR 738 at edge of parking areaEach1.00
Tent City Main Spur0.430307Surface Maintenance Level 2From FSR 738 to TC 9 and 10 loopLF650.00
Tent City Main Spur0.430101Spot Surfacing, 1 1/2" MinusTread from cattlegaurd to TC9/10 loop. (650'x12',4")CY96.00
Tent City 3-6 Loop225LF from FSR30307Surface Maintenance Level 2Recondition TC 3-6 LoopLF220.00
Tent City 3-6 Loop225LF from FSR30101Spot Surfacing, 1 1/2" MinusTread and define TC 3-6 loop. (220'x12, 4")CY33.00
Tent City Sites 1-140.430101Spot Surfacing, 1 1/2" MinusIndividual Parking Pads at 14 sites. (15'x25', 4")CY70
Government Furnished Items
Tent City Parking Area0.39Barriers,Government FurnishedBoulders on parking island and around vaultEach12.00
Tent City Main Spur0.4Riprap,Government FurnishedRaise roadbed from TC12-TC9/10 loop (325'x12',4")CY48.00
Tent City 1-140.4Bucking Rail, Government FurnishedEntire perimeter of Tent City tied into cattleguardLF2200.00

BC

2024 Brush Creek Road Reconstruction
Road Log
Note: Milepost #'s are measured from US Hwy 149 and CR 738 junction.
Road/Camp#/CampSpurMilepostPay ItemDescriptionAdditional NotesUnitQuantity
Brush Creek 1 Spur4.3530307Surface Maintenance Level 2LF50.00
Brush Creek 1 Spur4.3520406Drivable Grade Dip InstallationTied in with CR 738Each1.00
Brush Creek 1 Spur4.3530101Spot Surfacing, 1 1/2" MinusSurface Spur and Site. (12'x50',4")CY8.00
Brush Creek Kiosk Parking4.430307Surface Maintenance Level 2Define and recondition parking area.(20'x30')SF600.00
Brush Creek Kiosk Parking4.430101Spot Surfacing 1 1/2" MinusSurface parking area (20'x30',4")CY8.00
Brush Creek 2-7 Spur4.430307Surface Maintenance Level 2From CR 738 to BC 4, define driveway.LF200.00
Brush Creek 2-7 Spur4.420406Drivable Grade Dip InstallationTied in with CR 738Each1.00
Brush Creek 2-7 Spur4.420406Drivable Grade Dip Installation130 LF from CR 738Each1.00
Brush Creek 2-7 Spur4.430101Spot Surfacing 1 1/2" MinusTread driveway (200'x14',4")CY35.00
Government furnished Items
Brush Creek Parking Area4.4Barriers, Government FurnishedBoulders to limit parkingEach6.00
Brush Creek 2-7 Spur4.4Barriers, Government FurnishedDefine driveway(Boulders/Bucking Rail)LF400.00

WG

2024 Washington Gulch Road Reconstruction
Road Log
Note:Milepost #'s are measured from the cattlegaurd at the USFS boundary on FSR 811.
Road/Camp#/CampSpurMilepostPay ItemDescriptionAdditional NotesUnitQuantity
FSR 811061907Maintain Two Lane CattleguardEach1.00
FSR 8110.0-2.730307Surface Maintenance Level 2Include ditchesLF14256.00
FSR 8110.0-2.720104Cut Roadway Vegetation, Both SidesModerate VegetationMile2.70
FSR 8110.0-2.760702Clean and Recondition CulvertsMilepost .5, 1, 1.2, 1.4, 1.7, 1.75, 2.5Each7.00
Wash Gulch Vault Parking0.14530307Surface Maintenance Level 2Define parking area (45'x50')SF6750.00
Wash Gulch Vault Parking0.14530101Spot Surfacing, 1 1/2" MinusTread gov furnished riprap, raise parking (45'x50',4")CY34.00
WG 3-5 Spur0.1530307Surface Maintenance Level 2Driveway accessing sites on left past kioskLF200.00
WG 3-5 Spur0.1530101Spot Surfacing, 1 1/2" MinusRaise and surface to WG 3-5 (200'x12',4")CY30.00
WG 6-9 Spur0.1530307Surface Maintenance Level 2Straight drive to 4x4 signLF710.00
WG 6-9 Spur0.1530101Spot Surfacing, 1 1/2" MinusRaise and surface to WG9/4x4 sign (710'x12',4")CY125.00
WG 9/4x4 sign to Quarry0.1530307Surface Maintenance Level 2LF1800.00
WG 12-20 Spur0.430307Surface Maintenance Level 2From FSR 811 to WG 20LF1200.00
WG 12-20 Spur0.430101Spot Surfacing, 1 1/2" MinusFrom FSR 811 to WG 20(1200'x12,4")CY180.00
WG 12-20 Spur0.420406Drivable Grade Dip Installation212 LF from FSR 811Each1.00
WG 12-20 Spur0.420406Drivable Grade Dip Installation430 LF from FSR 811Each1.00
WG 12-20 Spur0.420406Drivable Grade Dip Installation740 LF from FSR 811Each1.00
WG 12-20 Spur0.420406Armored Grade Dip Installation990 LF from FSR 811Each1.00
WG 21-26 Spur0.4530307Surface Maintenance Level 2LF400.00
WG 21-26 Spur0.4530101Spot Surfacing, 1 1/2" MinusFrom FSR 811 to WG 26 (400'x12',4")CY60.00
WG 28-31 Spur0.930307Surface Maintenance Level 2From FSR 811 to WG 31LF650.00
WG 28-31 Spur0.920406Drivable Grade Dip InstallationTied in with FSR 811Each1.00
WG 28-31 Spur0.920410New Rolling Dip Installation75 LF from FSR 811Each1.00
WG 28-31 Spur0.920410New Rolling Dip Installation175 LF from FSR 811Each1.00
WG 28-31 Spur0.920406Drivable Grade Dip Installation330 LF from FSR 811Each1.00
WG 32-37 Spur1.0530307Surface Maintenance Level 2LF900.00
WG 32-37 Spur1.0520406Drivable Grade Dip Insatllation182 LF from FSR 811Each1.00
WG 32-37 Spur1.0520410New Rolling Dip Installation415 LF from FSR 811Each1.00
Government Furnished Items
Vault Parking0.145Riprap, Government FurnishedRaise vault parking area (45'x50', 4")CY28.00
Vault Parking0.145Barriers,Government FurnishedDefine parking area (Bucking rail or Boulders)LF100.00
WG 6-9 Spur0.15Riprap, Government FurnishedRaise roadbed for surfacing (710'x12',4")CY105
WG 9/4x4 sign to Quarry0.15Riprap, Government FurnishedQuarry accessiblity, If needed. (Estimate)CY50

SRMC

2024 Slate River/Musicians Camp Road Reconstruction
Road Log
Note:Milepost #'s are measured from the cattlegaurd at the USFS boundary on FSR 734.
Road/Camp#/CampSpurMilepostPay ItemDescriptionAdditional NotesUnitQuantity
FSR 734061907Maintain Two Lane CattleguardEach1.00
FSR 7340.0-1.530307Surface Maintenace Level 2Include ditchesLF7920.00
FSR 7340.0-1.520104Cut Roadway Vegetation,Both SidesModerate VegetationMile1.50
Slate River 1-3 Spur0.830307Surface Maintenacne Level 2LF500.00
Slate River 1-3 Spur0.820410New Rolling Dip InstallationTied in with FSR 734 (with lead-out)Each1.00
Slate River 1-3 Spur0.820412Lead-Out Ditch IstallationEach1.00
Slate River 1-3 Spur0.820410New Rolling Dip Installation120 LF from FSR 734Each1.00
Musicians Camp 1-30.9530307Surface Maintenacne Level 2LF300.00
Musicians Camp 1-30.9520410New Rolling Dip InstallationTied in with FSR 734Each1.00
Musicians Camp 1-30.9520406Armored Grade Dip110 LF from FSR 734Each1.00
Musicians Camp 4-17130307Surface Maintenance Level 2LF800.00
Musicians Camp 4-17130101Spot Surfacing, 1 1/2" MinusFSR 734 to MC-17(800'x12',4")CY120.00
Slate River 4-5 Entrance1.1520410New Rolling Dip InstallationWith Lead out ditch, Tied in with FSR 734Each1.00
Slate River 4-5 Entrance1.1520412Lead-Out Ditch IstallationFrom new rolling dip, Tied in with FSR 734Each1.00
Slate River 4 Spur1.1530307Surface Maintenance Level 2LF60.00
Slate River 5 Spur1.1530307Surface Maintenance Level 2knock out bermLF475.00
Slate River 5 Spur1.1520406Drivable Grade Dip Installation150 LF from FSR 734Each1.00
Slate River 5 Spur1.1520406Drivable Grade Dip Istallation300 LF from FSR 734Each1.00
Government Furnished Items
Slate River 1-30.8Barriers, Governmant FurnishedBoulders on drive /Island to define loopEach10.00
Musicians Camp 1-30.95Barriers, Governmant FurnishedBoulders to define drivewayEach10.00

THImp

2024 Tent City/ Brush Creek Trailhead improvments
Road Log
Note:Tent City TH and Brush Creek TH Milepost #'s are measured from US Hwy 149.
Road/Camp#/CampSpurMilepostPay ItemDescriptionAdditional NotesUnitQuantity
Tent City Trailhead4.915101(c)Equipment Time, DozerHr20.00
Tent City Trailhead4.915101(e)Equipment Time,CompactorHr8.00
Tent City Trailhead4.930101Spot Surfacing, 3/4" MinusEntire parking area (150'x100',4")CY185.00
Brush Creek Trailhead2.415101(c)Equipment Time, DozerHr20.00
Brush Creek Trailhead2.415101(e)Equipment Time, CompactorHr8.00
Brush Creek Trailhead2.430101Spot Surfacing, 3/4" MinusEntire parking area (120'x80,4")CY119.00
Government Furnished Items
Tent City Trailhead4.9Barriers, Government FurnishedParking Barriers( Pipe,Concrete,Etc..)Wait 1or 2 yearsEachTBD
Tent City Trailhead4.9Signs, Government FurnishedTrailer Parking and No Camping signs.EachTBD

File details come from the government source that posted it. Updated .