This document outlines a federal contract opportunity for construction services to renovate a building for hemodialysis. The solicitation number is 36C24822R0158 and is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The project involves renovating Building 4B at the address provided for hemodialysis services. A site visit is scheduled for August 8th, 2022 at 10:00 AM at the specified location. Proposals are due by August 31st, 2022 at 3:30 PM. This is a set-aside for Service-Disabled Veteran-Owned Small Businesses, which can be verified on the provided website. The attached price metric file provides a template for pricing but no other details.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Construction Cost
| CONSTRUCTION COST PROGRAM - ESTIMATE WORKSHEET | DATE: | 12/31/99 | ||||||||
| PROJECT NO. | PROJECT TITLE | LOCATIONs | DATE: | |||||||
| 0 | 0 | 0 | $0.00 | |||||||
| ESTIMATOR | TOTAL CONSTRUCTION COST SUMMARY | BUILDING NO(S) | DRAWING NOs. | $0.00 | ||||||
| 0 | 0 | 0 | $0.00 | |||||||
| NRM | LABOR (w/ equip) | MATERIALS | ||||||||
| CODE | CSI # | The Start | SYSTEMS/SUBSYSTEM | QTY | UNIT | $/UNIT | TOTAL | $/UNIT | TOTAL | TOTAL |
| 16 DIV. CONSTRUCTION COST | $0 | |||||||||
| TOTAL CONSTRUCTION COST (Low Bid) | $0 | |||||||||
| $0 | ||||||||||
| Subtotal | $0 | |||||||||
| Impact Cost with R.O.P | ||||||||||
| Subtotal | $0 | |||||||||
| Subtotal | $0 | |||||||||
| TOTAL PROJECT COSTS | $0 |
&RSHEET NO &P OF &N
Detail Base Offer Cost Breakdown
"FOR OFFICIAL USE ONLY"
| ESTIMATE WORKSHEET | ||||||||||
| Project Number | Location | PROJECT NAME | DATE: | |||||||
| TYPE OF ESTIMATE: | ESTIMATOR: | BUILDING NO./LOCATION: | ||||||||
| LABOR | MATERIALS/EQUIPMENT | TOTAL COST BY ITEM | ||||||||
| CODE: | The Start | SYSTEM/SUBSYSTEM | QTY | UNIT | $/UNIT | TOTAL | $/UNIT | TOTAL | ||
| 1 | GENERAL CONDITIONS | $0.00 | ||||||||
| 1 | Mobilization/Demobilization | |||||||||
| 2 | Permits/Environmental Regulations Compliance | |||||||||
| 3 | Safety Requirements | |||||||||
| 4 | Maintenance of Traffic (MOT) | |||||||||
| 2 | Existing Conditions | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Removal of Wood Floor System | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | Removal of Metal Floor System and Connections | ea | $0.00 | $0.00 | $0.00 | |||||
| 3 | Paint Removal | ea | $0.00 | $0.00 | $0.00 | |||||
| 4 | Chain-Link Fabric Removal | ea | $0.00 | $0.00 | $0.00 | |||||
| 5 | Miscellaneous Removal (signs, wiring,conduits, etc. | ea' | $0.00 | $0.00 | $0.00 | |||||
| 3 | CONCRETE | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Cracks Repairs at Concrete Ramps | ea | $0.00 | $0.00 | $0.00 | |||||
| 4 | METALS | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Retrofit of Existing Structural Connections | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | New Floor System | ea | $0.00 | $0.00 | $0.00 | |||||
| 3 | New Connections for Floor System | ea | $0.00 | $0.00 | $0.00 | |||||
| 5 | FINISHES | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Protective Paint Coating (Epoxy) | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | Finish Paint Coating | ea | $0.00 | $0.00 | $0.00 | |||||
| 6 | SPECIALTIES | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | New Vinyl Coated Chain Link Fabric | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | New Green Chain Link Fence Privacy Slats | ea | $0.00 | $0.00 | $0.00 | |||||
| 3 | New Signage | ea | $0.00 | $0.00 | $0.00 | |||||
| 7 | ELECTRICAL | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Electrical Conduits, Wiring, Junctions, Lighting | ea | $0.00 | $0.00 | $0.00 | |||||
| 8 | BRIDGE MODIFICATIONS | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Lightning Protection System | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | Structure Adaptations (To comply with current codes) | $0.00 | $0.00 | $0.00 | ||||||
| 3 | Roof Cover | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| Subtotal | $0.00 | $0.00 | $0.00 | |||||||
| Overhead % | ||||||||||
| Profit % | ||||||||||
| Bond % | $$ | |||||||||
| Overhead/Profit Subtotals: | $0.00 | $0.00 | $0.00 | |||||||
| Total Base Offer Cost |